Permit Information
Permit NumberBLD17-00584
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 5757 E HOOTOWL DR
Project NameHN 55-1
Customer Number 
ePlanReviewYes
Description
Hillside, WUI Foothills Zone "A" requirements, Class "A" roof required. Permit for the construction of a new 3,533 sq. ft., two story (first story 1,721 sq. ft., second story 1,812 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 429 sq. ft. of covered patio/porch and a 816 sq. ft. attached garage per the approved plans, plan review report and any notations. SP-01 zoning and setbacks per planning. **BJM*** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 608-7168.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/31/201711/1/201711/1/2017APASS
DetailsBrandon Shaw
Rolo Phone #: ###-####
DOC - Permit Finaled11/1/201711/1/201711/1/2017PPASS
DetailsBrandon Shaw
PubWorks Occupancy Approval10/19/201710/19/201710/19/2017 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Other7/20/20177/20/20177/20/2017PPASS
DetailsBrandon Shaw
Rollo-soffit Phone #: ###-####
BLD-Energy code compliance7/7/20177/10/20177/11/2017APASS
DetailsBrandon Shaw
Rollo Phone #: ###-####
BLD-Framing/Rough-in7/5/20177/6/20177/6/2017AFAIL
DetailsBrandon Shaw
See correction notice and red paint
OK to insulate
Plan Modification Accepted  6/26/2017 DONE
new manual j report
Routing - MECHANICAL6/26/2017 6/26/2017 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing6/23/20176/23/20176/23/2017PFAIL
DetailsBrandon Shaw
Rollo Phone #: ###-####
OK to wrap exterior and install windows
BLD-Wall Bracing6/22/20176/22/20176/22/2017PFAIL
DetailsBrandon Shaw
Shear // Rolo Phone #: ###-####
See CN
BLD-Foundation4/28/20174/28/20174/28/2017PPASS
DetailsBrandon Shaw
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
BLD-Footing4/21/20174/21/20174/21/2017APASS
DetailsBrandon Shaw
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
BLD-Footing4/20/20174/20/20174/20/2017PNR
DetailsBrandon Shaw
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
PubWorks Subgrade Approval4/20/20174/20/20174/20/2017 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Inspection Record Card- Bld  4/5/2017 DONE
Issue PAID IN FULL permit  4/5/2017 DONE
OVERRIDE  4/3/2017  
Plan assigned to (BJM)3/22/20173/22/20174/3/2017 DONE
DetailsBrian McGowan
Due 3-31 Level 2 - ePlan - Fail - Need beam over 16' garage door verified.
Routing - PLAN CHECK4/3/2017 4/3/2017 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  4/3/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  4/3/2017 DONE
all requirements met
Routing - PLAN CHECK3/14/2017 4/2/2017 FAIL
DetailsBrian McGowan
Need beam over 16' garage door verified.
1st review completed  3/31/2017 FAIL
DetailsBrian McGowan
Need beam over 16' garage door verified.
Plan assigned to (LEG) Tisha3/14/2017 3/22/2017 DEFR
DetailsTisha Gallop
Routing PW Grading-Hillside3/14/2017 3/20/2017 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - Erosion and Sediment3/14/2017 3/17/2017 PASS
DetailsAndy J. Long
ESC plan approved. Valid RP and PD designated. Site preparation inspection required.
Routing - MECHANICAL3/14/2017 3/16/2017 PASS
DetailsTroy James
Route to Impact Fee Review3/14/20173/17/20173/15/2017 PASS
DetailsTonya Wallace
Initial residential review of all new news permit requested for now.
Routing - FIRE3/14/20173/14/20173/15/2017 PASS
DetailsKatie Marron
Plans were reviewed for FD Access, hydrant availability and defensible space.
Routing - Addressing3/14/2017 3/15/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS3/14/2017 3/14/2017 PASS
DetailsMorgan Webb
Routing - PLANNING3/14/2017 3/14/2017 PASS
DetailsJeff Lowe
Plans ACCEPTED BY PLAN TECH  3/14/2017 DONE
Intake Approval  3/14/2017 PASS
Recd Pcfee & Taken To Pln CK  3/14/2017 DONE
Application received  3/10/2017 DONE
Application submitted via PDS Online on Mar 10 2017 2:34PM