Permit Information
Permit NumberBLD17-00587
StatusFinaled
Name TRADITION CUSTOM HOMES
Site Address 5470 W STATE ST
Project NameT3 Gym
Customer Number 
ePlanReviewYes
Description
(T3 GYM – CONVERSION FROM STORAGE TO ASSEMBLY AND REMODEL – EAST END OF BUILDING) (CZC17-00085) (12-15-17 PLAN MODIFICATION TO CONSTRUCT AN EXTERIOR CONCRETE LANDING AND RAMP THAT ARE ACCESSIBLE TO THE DISABLED AT AN EXTERIOR DOOR ON THE SOUTHWEST SIDE OF THE BUILDING. THE DIFFERENCE IN ELEVATION FOR THE RAMP WILL BE 6 INCHES OR LESS. A STEEL PIPE HANDRAIL AND LOW RAIL WILL BE PROVIDED ALONG THE OPEN SIDE FOR EDGE PROTECTION.) This building does not have a fire sprinkler system. To create a 13,308 square foot tenant space (11,387 square foot 1st story and 1,921 square foot mezzanine) and to convert it from a storage warehouse to a basketball training facility. Work is to include a 2-hr fire-resistance-rated fire barrier wall, interior nonbearing walls, two restrooms accessible to the disabled (one of which is also an accessible shower room), a wood gymnasium floor, court divider curtains, basketball standards, winches, wall pads, corner pads, a new stairway to serve the existing mezzanine, guards at the mezzanine perimeter, and finishes. The evaluation of the roof to support the basketball standards and the design for how they will be attached was provided as part of the structural calculation package. Special Inspection is required for welding and for post installed anchors in hardened concrete. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 5/19/20186/5/2018 DONE
This permit finaled on the web by David Rogers
BLD-Final5/7/20185/9/20185/9/2018APASS
DetailsTony Young
Call for keycode access if before 8:15 am, or otherwise should be open. Thanks. Phone #: ###-#### Inspection requested via web by David Rogers
Print Occupancy Form  5/9/2018 DONE
Permanent Occupancy  5/9/2018 DONE
FIRE-Final Inspection5/3/20185/4/20185/4/2018APASS
DetailsJim Page
Previously noted items have been corrected, no fire sprinkler, no fire alarms, fire exitnguishers are in place with current inspection tags, final life fire safety inspetion complete.

Final Fire Re-inspection. Call for door access if not open. Thanks. Phone #: ###-#### Inspection requested via web by David Rogers
FIRE-Final Inspection4/16/20184/18/20184/18/2018AFAIL
DetailsJim Page
Provide sticker on main east entry reading "Door to remain unlocked while occupied". Provide fire extinguishers with current inspection tags throughout tenant space including mezzanine. Provide emergency lighting to include exit discharge landings and exit signs per city approved drawings (Notated city approved plans with red ink). North exit door in gym area requires panic hardware (Notated city approved plans with red ink). Provide single action door hardware (Notated city approved drawings with red ink the exterior doors requiring single action door hardware). Provide occupant load sign for gym area.
Print Occupancy Form  3/5/2018 DONE
BLD-Aging Inspection2/7/20182/7/20182/8/2018 PEND
DetailsTony Young
BLD-Aging Inspection2/6/20182/6/20182/7/2018 PEND
DetailsTony Young
CHANGE STATUS TO (ISS)  12/21/2017 DONE
Plan assigned to (CJW)12/14/201712/14/201712/15/2017 PASS
DetailsCarl Westfall
x Plan mod - T3 Gym
Routing - PLAN CHECK12/14/2017 12/15/2017 PASS
DetailsCarl Westfall
Plan Reviewer's activity  12/15/2017 PASS
DetailsCarl Westfall
Plan mod approved
Permit Ready to Issue  12/15/2017 DONE
DetailsChristina Prado
All requirements met for Plan Mod

DO NOT RE-ISSUE - change status to ISS after fees paid in full
Plan Modification Accepted  12/14/2017 DONE
DetailsChristina Prado
Plan Mod to change the orientation of the ADA ramp
BLD-Final11/6/201711/7/201711/7/2017ANR
DetailsTony Young
Call for garage code access Phone #: ###-#### Inspection requested via web by David Rogers,, needs trades finals,, need job finished
BLD-Framing/Rough-in9/22/20179/25/20179/25/2017APART
DetailsTony Young
Look to see if we can get approval to cover wall. Electrical and plumbing inspections have passed. Mechanical is all overhead on existing system and is still in process, so hoping wall cover can proceed. Call for access code. Thanks! Phone #: ###-#### Inspection requested via web by David Rogers,, walls ok to cover
BLD-Wall cover8/25/20178/29/20178/29/2017PPASS
DetailsTony Young
Call half hour before // Garett Phone #: ###-####,, 2nd layer ok
BLD-Wall cover8/28/20178/29/20178/29/2017APASS
DetailsTony Young
Call half hour before // Garett Phone #: ###-####,, work in progress,, ok so far
BLD-Framing/Rough-in8/24/20178/25/20178/25/2017APART
DetailsTony Young
Call half hour before // Garett Phone #: ###-####,, studs in place on firewall,, 1st layer is work in progress,, ok
(F) Reprint permit  8/24/2017 DONE
Print Occupancy Form  8/24/2017 DONE
Issue PAID IN FULL permit  8/22/2017 DONE
Print Occupancy Form  8/22/2017 DONE
Plan assigned to (CJW)4/6/20174/6/20178/18/2017 PASS
DetailsCarl Westfall
(3rd done) (Apr 26 - 15 days) (6 sheets) T3 Gym Remodel
Routing Off Site - STRUCTURAL8/8/2017 8/18/2017 PASS
DetailsCarl Westfall
Jan Welch (Stapley Engineering)
PLANS/APPL TAKEN TO FRONT DESK  8/18/2017 DONE
Permit Ready to Issue  8/18/2017 DONE
Need GC Form and Revised Cert of Value
Routing - PLAN CHECK8/2/2017 8/8/2017 PASS
DetailsCarl Westfall
Routing for 2nd review was delayed because the assigned Plans Examiner was gone on vacation and because ePlanReview was not available because of an upgrade when he came back. He was gone on Aug 2, 3, and 4 (Wed, Thurs, Fri) but was back on Aug. 5 (Saturday). He could have routed it on Saturday had ePlanReview been available.
Plan resubmittals received  8/2/2017 DONE
Plan resubmittals requested  7/17/2017  
Routing Off Site - STRUCTURAL7/11/2017 7/14/2017 FAIL
DetailsCarl Westfall
Jan Welch (Stapley)
Routing - PLAN CHECK7/7/2017 7/11/2017 PASS
DetailsCarl Westfall
Pending approval by Structural
Routing - MECHANICAL7/11/2017 7/11/2017 PASS
DetailsTroy James
Plan resubmittals received  7/7/2017 DONE
Route to Impact Fee Review5/24/20175/27/20175/25/2017 PASS
DetailsMarissa Taylor
Review requested for Commercial Permit
1st review completed  5/24/2017 DONE
Plan resubmittals requested  5/24/2017 DONE
Routing - PLAN CHECK4/6/2017 5/24/2017 FAIL
DetailsCarl Westfall
Completed the 1st review. (15 days or 3 weeks over time frame)
Routing - Design Review4/6/2017 4/12/2017 PASS
DetailsSarah Schafer
Approved per CZC17-00085
Routing Off Site - STRUCTURAL4/6/2017 4/10/2017 FAIL
DetailsCarl Westfall
Jan Welch (Stapley Engineering)
Routing - FIRE4/6/20174/6/20174/6/2017 PASS
DetailsKatie Marron
Basic Life Safety. No comments required.
Intake Approval  4/6/2017 PASS
DetailsAdele J Schaffeld-Griffin
Julie completed pre screen, verified fees paid
Plan Reviewer's activity  4/6/2017 DONE
DetailsAdele J Schaffeld-Griffin
Greg, Please make sure that you reach out to ACHD for review on this change of use/occupancy. If additional fees are due they will need to be paid or paid when the permit is issued. If no fees are do please submit the documentation from ACDH as such.

Thank you
Routing - MECHANICAL4/6/2017 4/6/2017 FAIL
DetailsTroy James
Routing - Addressing4/6/2017 4/6/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS4/6/2017 4/6/2017 PASS
DetailsMorgan Webb
Intake Approval  4/5/2017 FAIL
DetailsJulie Romig
Provide the following information on the mechanical plans:
1. Mechanical plans require Mechanical Engineer stamp/signature or written approval from Mechanical Plans Examiner allowing architect to sign. Contact Troy James at ###-#### with questions/for approval.
2. Mechanical ComCheck for new heater (and any other new heating/cooling equipment).
3. Mechanical heating & cooling load calculations for new heater (and any other new equipment).
4. Due to change of occupancy from warehouse to gym, show how ventilation requirements for gym are met w/existing system.
Plan Reviewer's activity  4/5/2017  
Route to Mechanical
Intake Approval  3/17/2017 FAIL
DetailsJulie Romig
Need the following: Zoning Certificate; Structural calculations for stair guardrail and landing; Lighting Compliance COMcheck - cannot be a deferred submittal
Application received  3/10/2017 DONE
Application submitted via PDS Online on Mar 10 2017 3:12PM