Permit Information
Permit NumberBLD17-00603
StatusFinaled
Name SAWTOOTH CONSTRUCTION
Site Address 2399 E WARM SPRINGS AVE
Project NameTablerock Townhomes
Customer NumberEPLAN 17-00547,17-00602 TO 00610
ePlanReview 
Description
*** PLAN MOD 7/10/17 - Revised Garage/House landing and adding a code compliant escape and rescue window in Garage area for possible future Bonus Room. Plan modifications must be submitted for the Bonus Room per each address. *** BJM*** (10 PERMITS TOTAL FILED UNDER BLD17-00547 IN EPLAN REVIEW) Permit for the construction of a new 1807 sq. ft., two story with basement (first story 832 sq. ft., second story 835 sq. ft., basement 140 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 110 sq. ft. of covered patio/porch and a 668 sq. ft. attached garage per the approved plans, and any notations. Special inspections will be performed per the engineers completed #310 Statement of Special Inspections report. R-2D zoning and setbacks per planning. **DAF**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  6/20/2018 DONE
call requesting the C of O-emailed it
Letter of compliance/Occupancy  6/18/2018 DONE
Zoning Approval6/14/20186/14/20186/14/2018 DONE
DetailsAndrea Tuning
BLD-Final6/6/20186/11/20186/11/2018PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Greg Strong
DOC - Permit Finaled6/11/20186/11/20186/11/2018PPASS
DetailsDave Hannah
BLD-Energy code compliance3/12/20183/13/20183/13/2018APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Greg Strong
BLD-Framing/Rough-in3/7/20183/7/20183/7/2018PPART
DetailsDave Hannah
Please call Josh @ ###-#### to walk with inspector Phone #: ###-#### Inspection requested via web by Greg Strong needs lad suport in trusses and finish install int hold downs
BLD-Wall Bracing2/20/20182/20/20182/21/2018PPASS
DetailsDave Hannah
call when onsite Phone #: ###-#### Inspection requested via web by Greg Strong
BLD-Footing11/15/201711/16/201711/16/2017APASS
DetailsDave Hannah
As early as possible Phone #: 2087247999 >> Inspection requested via mobile web by Corey Ure
BLD-Foundation11/7/201711/8/201711/8/2017APASS
DetailsDave Hannah
As late as possible Phone #: 2087247999 >> Inspection requested via mobile web by Corey Ure
BLD-Concrete11/7/201711/8/201711/8/2017APASS
DetailsDave Hannah
As early as possible Phone #: 2087247999 >> Inspection requested via mobile web by Corey Ure
Extend Permit 90/180 days11/7/201711/8/201711/7/2017ACANC
DetailsDave Hannah
As late as possible Phone #: 2087247999 >> Inspection requested via mobile web by Corey Ure
BLD-Foundation11/7/201711/7/201711/7/2017PNR
DetailsDave Hannah
As late as possible Phone #: 2087247999 >> Inspection requested via mobile web by Corey Ure
BLD-Footing11/7/201711/7/201711/7/2017PNR
DetailsDave Hannah
As late as possible Phone #: 2087247999 >> Inspection requested via mobile web by Corey Ure
BLD-Foundation9/26/20179/26/20179/26/2017PPASS
DetailsDave Hannah
Foundation Walls Phone #: ###-#### Inspection requested via web by Greg Strong
BLD-Footing9/13/20179/13/20179/15/2017PPASS
DetailsBrandon Shaw
Building Footings Phone #: ###-#### Inspection requested via web by Greg Strong
CHANGE STATUS TO (ISS)  7/14/2017 DONE
Plan Mod
OVERRIDE  7/10/2017  
Plan assigned to (BJM)6/30/20176/30/20177/10/2017 DONE
DetailsBrian McGowan
Routing - PLAN CHECK6/30/2017 7/10/2017 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  7/10/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  7/10/2017 DONE
DO NOT REISSUE - plan modificaiton fee due
Plan Modification Accepted  6/29/2017 DONE
Plan mod workflow started to change basement window to egress compliant
Inspection Record Card- Bld  4/18/2017 DONE
Issue PAID IN FULL permit  4/18/2017 DONE
OVERRIDE  4/6/2017  
Plan assigned to (DAF)3/22/20173/22/20174/6/2017 DONE
DetailsDavid Ferguson
(1st done) due 3/31
Routing - PLAN CHECK4/6/2017 4/6/2017 PASS
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  4/6/2017 DONE
Permit Ready to Issue  4/6/2017 DONE
Routing - PLANNING4/5/2017 4/5/2017 PASS
DetailsLeon Letson
Routing - Design Review4/5/2017 4/5/2017 PASS
DetailsAndrea Tuning
1st review completed  3/31/2017 DONE
DetailsDavid Ferguson
Routing - PLAN CHECK3/14/2017 3/31/2017 FAIL
DetailsDavid Ferguson
Routing - PLANNING3/14/2017 3/31/2017 FAIL
DetailsAndrea Tuning
Plan assigned to (LEG) Tisha3/14/2017 3/22/2017 DEFR
DetailsTisha Gallop
3/31 L2 Townhouse
Routing PW Grading-Hillside3/14/2017 3/17/2017 CANC
DetailsJason C. Taylor
NOT A HILLSIDE PROJECT. JCT
Routing - Erosion and Sediment3/14/2017 3/17/2017 PASS
DetailsAndy J. Long
All ESC permits for 10 SFHs in Tablerock Subdivision are approved. ESC plan and SWPPP submitted under ESC16-00945 during subdivision development. Same RP designated.
Routing - MECHANICAL3/14/2017 3/17/2017 PASS
DetailsTroy James
Route to Impact Fee Review3/14/20173/17/20173/15/2017 PASS
DetailsTonya Wallace
Initial residential review of all new news permit requested for now.
Routing - FIRE3/14/20173/14/20173/15/2017 PASS
DetailsScott Arellano
Plans were reviewed for FD Access and hydrant availability.
Routing - Addressing3/14/2017 3/15/2017 PASS
DetailsLaura Hunter
Updated address to 2399 E Warm Springs Ave
Routing - PUBLIC WORKS3/14/2017 3/14/2017 PASS
DetailsRachael Beierle
Plans ACCEPTED BY PLAN TECH  3/14/2017 DONE
Intake Approval  3/14/2017 PASS
Recd Pcfee & Taken To Pln CK  3/14/2017 DONE
Application received 3/13/2017   
Application received 3/13/2017