Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD17-00617
StatusFinaled
Name DEBELLOY CONSTRUCTION
Site Address 12067 W USTICK RD
Project NameBlack Rock Coffee Shop
Customer Number 
ePlanReviewYes
Description
(BLACK ROCK COFFEE SHOP – NEW BUILDING) (DRH17-00009) (CUP16-00098) (CVA16-00074) (8-1-17 PLAN MODIFICATION TO PROVIDE ADDITIONAL CLARIFICATION ON THE DRAWINGS.) This building does not have a fire sprinkler system. To construct a new 1,272 square foot building to be used as a coffee shop. Work is to include concrete footings, concrete foundations, concrete slab on grade, 6 inch wood stud exterior walls, exterior bearing and shear walls, engineered wood truss roof with wood diaphragm, wood and stucco exterior wall finishes, R-38 continuous insulation installed on top of the roof deck, R-38 insulation installed within an attic, single ply membrane roof coverings, metal awnings, two exterior side-hinged swinging doors, two exterior overhead doors, exterior windows, a drive-thru window, gypsum board ceiling finish, gypsum board wall finish, interior nonbearing walls, two restrooms accessible to the disabled, kitchen equipment, a service counter accessible to the disabled, tables, chairs, millwork, and finishes. Special Inspection is required for concrete and for anchors post-installed in hardened concrete. The structural design for the engineered wood trusses is a deferred submittal item. A 6 foot tall masonry trash enclosure with steel gates will also be constructed under this permit. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 11/24/201712/12/2017 DONE
Mailed 12-13-17
First Notice 10/29/201711/14/2017 DONE
Mailed 11-15-17
BLD-Final10/19/201710/19/201710/19/2017PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by kevin debelloy
OK for Perm Occ.
FIRE-Final Inspection10/19/201710/19/201710/19/2017APASS
DetailsTroy Cobbley
Life safety passed

Phone #: ###-#### Inspection requested via web by kevin debelloy
Permanent Occupancy  10/19/2017 DONE
Zoning Approval10/17/201710/17/201710/17/2017 DONE
DetailsAndrea Tuning
BLD-Grading Inspection10/11/201710/11/201710/11/2017PCANC
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by kevin debelloy
BLD-Energy code compliance8/24/20178/24/20178/24/2017PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by kevin debelloy
BLD-Framing/Rough-in8/21/20178/22/20178/22/2017PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by kevin debelloy
BLD-Wall Bracing8/7/20178/8/20178/8/2017APASS
DetailsJim Storey
Please call when inspector is on his way so I can meet him there. Thank you! Phone #: ###-#### Inspection requested via web by kevin debelloy walls and roof exterior
(F) Reprint permit  8/8/2017 DONE
CHANGE STATUS TO (ISS)  8/4/2017 DONE
(F) Reprint permit  8/4/2017 DONE
OVERRIDE  8/1/2017  
Plan assigned to (CJW)7/31/20177/31/20178/1/2017 PASS
DetailsCarl Westfall
Plan Mod
Routing - PLAN CHECK7/31/2017 8/1/2017 PASS
DetailsCarl Westfall
1st plan mod approved
Routing - Design Review8/1/2017 8/1/2017 PASS
DetailsAndrea Tuning
PLANS/APPL TAKEN TO FRONT DESK  8/1/2017 DONE
Permit Ready to Issue  8/1/2017 DONE
Do NOT REISSUE plan modification
Plan Modification Accepted  7/31/2017  
BLD-Foundation6/28/20176/28/20176/28/2017PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by kevin debelloy
BLD-Footing6/22/20176/23/20176/23/2017PPASS
DetailsJim Sly
footing pour is scheduled for 2:00 Phone #: ###-#### Inspection requested via web by kevin debelloy
NO SPECIAL INSPECTIONS REQUIRED.
Issue PAID IN FULL permit  6/1/2017 DONE
Print Occupancy Form  6/1/2017 DONE
OVERRIDE  5/18/2017  
Plan assigned to (CJW)3/24/20173/24/20175/18/2017 PASS
DetailsCarl Westfall
(2nd done) (Apr 27 - 25 days) (45 sheets) Black Rock Coffee Shop Ustick
PLANS/APPL TAKEN TO FRONT DESK  5/18/2017 DONE
Permit Ready to Issue  5/18/2017 DONE
****MET 5-31-17 sent fees to Jeff ***Need revised cert of value, GC form
Routing PW Drainage5/16/2017 5/17/2017 PASS
DetailsBrian Murphy
Routing - FIRE5/16/2017 5/16/2017 PASS
DetailsKatie Marron
Transferred red lines on grading plan sheet about protecting access and hydrant through construction. No additional comments.
Routing - PLAN CHECK5/15/2017 5/16/2017 PASS
DetailsCarl Westfall
Routed drawings
Routing - MECHANICAL5/16/2017 5/16/2017 PASS
DetailsTroy James
Routing PW Sewer Design5/16/2017 5/16/2017 PASS
DetailsKyle S. Rosenmeyer
Route to Impact Fee Review5/13/20175/16/20175/15/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan resubmittals received  5/15/2017 DONE
1st review completed  5/13/2017 DONE
Plan resubmittals requested  5/13/2017 DONE
Routing - PLAN CHECK3/24/2017 5/13/2017 PASS
DetailsCarl Westfall
1st review done - drawings approved
Routing PW Drainage3/27/2017 4/10/2017 FAIL
DetailsBrian Murphy
NEED C-33 SAND IN SWALES APDX J
Routing PW Environmental3/27/2017 4/3/2017 PASS
DetailsRick Christenson
Routing - FIRE3/24/20173/24/20173/28/2017 PASS
DetailsKatie Marron
Comments attached to case.
Routing Off Site - STRUCTURAL3/24/2017 3/28/2017 PASS
DetailsCarl Westfall
Chris Holladay - AHJ
Routing PW Street Lights3/27/2017 3/28/2017 PASS
DetailsTom Marshall
Routing PW Sewer Design3/27/2017 3/27/2017 FAIL
DetailsKyle S. Rosenmeyer
Label existing manhole "SSMH 401Y10". Core drill manhole and install 4" SDR35 sewer service with Kor-N-Seal boot for water tight connection. Match crown of sewer service to crown of 8" Pipe out, and maintain SDR35 pipe at 2% minimum slope inside the public utility easement. Locate cleanouts and direction changes outside of easement, and deliniate utility easement on the drawing. Contact Boise Public Works 48 hours prior to installing service to obtain tap permit and schedule inspection. Label angle of connection to manhole on the drawing.
Routing - MECHANICAL3/24/2017 3/27/2017 FAIL
DetailsTroy James
Routing - PLUMBING3/24/2017 3/27/2017 PASS
DetailsDaryl Spivey
See redmarks and install per ISPC.
Routing - PLANNING3/24/2017 3/27/2017 PASS
DetailsLeon Letson
Routing - PLANNING Land Div3/24/2017 3/27/2017 PASS
DetailsTodd Tucker
Routing - Addressing3/24/2017 3/27/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS3/24/2017 3/27/2017 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment3/24/2017 3/27/2017 PASS
DetailsMelissa Jannusch
RP TBD. BMPs: gravel bags in gutter flow lines, DI protection, construction entrance. Project will be landscaped. Call for site prep: ###-####
Routing - Design Review3/24/2017 3/24/2017 PASS
DetailsAndrea Tuning
Intake Approval  3/24/2017 PASS
DetailsAdele J Schaffeld-Griffin
Julie approved pre screen
CDH approved documents uploaded
Intake Approval  3/22/2017 FAIL
DetailsJulie Romig
Pre-screen #2: Need the following: 1. Shallow Injection Well Inventory form (for seepage beds on site); 2. Site Drainage Report (stamped/signed); 3. Drainage System Operation & Maintenance Plan (stamped/signed).
Intake Approval  3/21/2017 FAIL
DetailsJulie Romig
Pre-screen #1: Missing 502 New Commercial Checklist; Sign Lighting COMcheck; Provide interior elevations showing ADA locations/clearances;
Application received  3/13/2017 DONE
Application submitted via PDS Online on Mar 13 2017 3:45PM