Second Notice | | 11/24/2017 | 12/12/2017 | | DONE |
|
|
|
Mailed 12-13-17
|
First Notice | | 10/29/2017 | 11/14/2017 | | DONE |
|
|
|
Mailed 11-15-17
|
BLD-Final | 10/19/2017 | 10/19/2017 | 10/19/2017 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy OK for Perm Occ.
|
FIRE-Final Inspection | 10/19/2017 | 10/19/2017 | 10/19/2017 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
Phone #: ###-#### Inspection requested via web by kevin debelloy
|
Permanent Occupancy | | | 10/19/2017 | | DONE |
|
|
|
|
Zoning Approval | 10/17/2017 | 10/17/2017 | 10/17/2017 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Grading Inspection | 10/11/2017 | 10/11/2017 | 10/11/2017 | P | CANC |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy
|
BLD-Energy code compliance | 8/24/2017 | 8/24/2017 | 8/24/2017 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy
|
BLD-Framing/Rough-in | 8/21/2017 | 8/22/2017 | 8/22/2017 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy
|
BLD-Wall Bracing | 8/7/2017 | 8/8/2017 | 8/8/2017 | A | PASS |
Jim Storey
|
|
|
Please call when inspector is on his way so I can meet him there. Thank you! Phone #: ###-#### Inspection requested via web by kevin debelloy walls and roof exterior
|
(F) Reprint permit | | | 8/8/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/4/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/4/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 8/1/2017 | | |
|
|
|
|
Plan assigned to (CJW) | 7/31/2017 | 7/31/2017 | 8/1/2017 | | PASS |
Carl Westfall
|
|
|
Plan Mod
|
Routing - PLAN CHECK | 7/31/2017 | | 8/1/2017 | | PASS |
Carl Westfall
|
|
|
1st plan mod approved
|
Routing - Design Review | 8/1/2017 | | 8/1/2017 | | PASS |
Andrea Tuning
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/1/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/1/2017 | | DONE |
|
|
|
Do NOT REISSUE plan modification
|
Plan Modification Accepted | | | 7/31/2017 | | |
|
|
|
|
BLD-Foundation | 6/28/2017 | 6/28/2017 | 6/28/2017 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy
|
BLD-Footing | 6/22/2017 | 6/23/2017 | 6/23/2017 | P | PASS |
Jim Sly
|
|
|
footing pour is scheduled for 2:00 Phone #: ###-#### Inspection requested via web by kevin debelloy NO SPECIAL INSPECTIONS REQUIRED.
|
Issue PAID IN FULL permit | | | 6/1/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/1/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 5/18/2017 | | |
|
|
|
|
Plan assigned to (CJW) | 3/24/2017 | 3/24/2017 | 5/18/2017 | | PASS |
Carl Westfall
|
|
|
(2nd done) (Apr 27 - 25 days) (45 sheets) Black Rock Coffee Shop Ustick
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/18/2017 | | DONE |
|
|
|
****MET 5-31-17 sent fees to Jeff ***Need revised cert of value, GC form
|
Routing PW Drainage | 5/16/2017 | | 5/17/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 5/16/2017 | | 5/16/2017 | | PASS |
Katie Marron
|
|
|
Transferred red lines on grading plan sheet about protecting access and hydrant through construction. No additional comments.
|
Routing - PLAN CHECK | 5/15/2017 | | 5/16/2017 | | PASS |
Carl Westfall
|
|
|
Routed drawings
|
Routing - MECHANICAL | 5/16/2017 | | 5/16/2017 | | PASS |
Troy James
|
|
|
|
Routing PW Sewer Design | 5/16/2017 | | 5/16/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Route to Impact Fee Review | 5/13/2017 | 5/16/2017 | 5/15/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan resubmittals received | | | 5/15/2017 | | DONE |
|
|
|
|
1st review completed | | | 5/13/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 5/13/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/24/2017 | | 5/13/2017 | | PASS |
Carl Westfall
|
|
|
1st review done - drawings approved
|
Routing PW Drainage | 3/27/2017 | | 4/10/2017 | | FAIL |
Brian Murphy
|
|
|
NEED C-33 SAND IN SWALES APDX J
|
Routing PW Environmental | 3/27/2017 | | 4/3/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - FIRE | 3/24/2017 | 3/24/2017 | 3/28/2017 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing Off Site - STRUCTURAL | 3/24/2017 | | 3/28/2017 | | PASS |
Carl Westfall
|
|
|
Chris Holladay - AHJ
|
Routing PW Street Lights | 3/27/2017 | | 3/28/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 3/27/2017 | | 3/27/2017 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Label existing manhole "SSMH 401Y10". Core drill manhole and install 4" SDR35 sewer service with Kor-N-Seal boot for water tight connection. Match crown of sewer service to crown of 8" Pipe out, and maintain SDR35 pipe at 2% minimum slope inside the public utility easement. Locate cleanouts and direction changes outside of easement, and deliniate utility easement on the drawing. Contact Boise Public Works 48 hours prior to installing service to obtain tap permit and schedule inspection. Label angle of connection to manhole on the drawing.
|
Routing - MECHANICAL | 3/24/2017 | | 3/27/2017 | | FAIL |
Troy James
|
|
|
|
Routing - PLUMBING | 3/24/2017 | | 3/27/2017 | | PASS |
Daryl Spivey
|
|
|
See redmarks and install per ISPC.
|
Routing - PLANNING | 3/24/2017 | | 3/27/2017 | | PASS |
Leon Letson
|
|
|
|
Routing - PLANNING Land Div | 3/24/2017 | | 3/27/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 3/24/2017 | | 3/27/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 3/24/2017 | | 3/27/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 3/24/2017 | | 3/27/2017 | | PASS |
Melissa Jannusch
|
|
|
RP TBD. BMPs: gravel bags in gutter flow lines, DI protection, construction entrance. Project will be landscaped. Call for site prep: ###-####
|
Routing - Design Review | 3/24/2017 | | 3/24/2017 | | PASS |
Andrea Tuning
|
|
|
|
Intake Approval | | | 3/24/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Julie approved pre screen
CDH approved documents uploaded
|
Intake Approval | | | 3/22/2017 | | FAIL |
Julie Romig
|
|
|
Pre-screen #2: Need the following: 1. Shallow Injection Well Inventory form (for seepage beds on site); 2. Site Drainage Report (stamped/signed); 3. Drainage System Operation & Maintenance Plan (stamped/signed).
|
Intake Approval | | | 3/21/2017 | | FAIL |
Julie Romig
|
|
|
Pre-screen #1: Missing 502 New Commercial Checklist; Sign Lighting COMcheck; Provide interior elevations showing ADA locations/clearances;
|
Application received | | | 3/13/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 13 2017 3:45PM
|