Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD17-00624
StatusFinaled
Name CULPAN & COMPANY
Site Address 2542 E TABLE ROCK RD
Project NamePetite Angleterre
Customer Number 
ePlanReviewYes
Description
WUI ZONE A - CLASS "A" ROOF REQUIRED **Permit for the construction of a new 3050 sq. ft., two story (first story 2156 sq. ft., second story 894 sq. ft.) single family dwelling with 3 bedrooms, 3.5 bathrooms, approximately 420 sq. ft. of covered patio/porch and a 603 sq. ft. attached garage per the approved plans, and any notations. R-1B zoning and setbacks per planning. **DAF**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 608-7168.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  7/17/2020 DONE
BLD-Final4/11/20184/12/20184/12/2018PPASS
DetailsDave Hannah
Clive Phone #: ###-####
DOC - Permit Finaled4/12/20184/12/20184/12/2018PPASS
DetailsDave Hannah
PubWorks Occupancy Approval4/11/20184/11/20184/11/2018 DONE
DetailsMelissa Jannusch

A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Energy code compliance10/26/201710/27/201710/27/2017APASS
DetailsDave Hannah
Clive Phone #: ###-#### ok to cover all but for around fireplace
BLD-Framing/Rough-in10/24/201710/25/201710/25/2017APASS
DetailsDave Hannah
Doug Phone #: ###-####
BLD-Framing/Rough-in10/23/201710/24/201710/24/2017PPEND
DetailsDave Hannah
Doug Phone #: ###-#### needs truss engineering
BLD-Other10/9/201710/9/201710/9/2017PPASS
DetailsDave Hannah
soffits - Doug Phone #: ###-####
BLD-Wall Bracing10/3/201710/4/201710/4/2017PPASS
DetailsDave Hannah
Shear // Doug Phone #: ###-####
Plan Modification Accepted  9/18/2017 DONE
new manual j report
Routing - MECHANICAL9/18/2017 9/18/2017 PASS
DetailsTroy James
resubmitted manual j report
BLD-Foundation6/23/20176/23/20176/23/2017PPASS
DetailsBrandon Shaw
As late as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
BLD-Footing6/20/20176/20/20176/21/2017PPASS
DetailsDave Hannah
As late as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
PubWorks Subgrade Approval6/21/20176/21/20176/21/2017 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Foundation6/6/20176/6/20176/6/2017PPASS
DetailsDave Hannah
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
BLD-Footing6/1/20176/1/20176/1/2017APART
DetailsDave Hannah
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro ok to pour backwall ftg
PubWorks Subgrade Approval6/1/20176/1/20176/1/2017 DONE
DetailsJason C. Taylor
***Downhill foundation only***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Inspection Record Card- Bld  5/9/2017 DONE
Issue PAID IN FULL permit  5/9/2017 DONE
OVERRIDE  4/27/2017  
Plan assigned to (DAF)3/29/20173/29/20174/27/2017 DONE
DetailsDavid Ferguson
(1st done) due 4/17 - Need WUI detail for exterior fans and canned lights. Also failed hillside.
PLANS/APPL TAKEN TO FRONT DESK  4/27/2017 DONE
Override - Parcel Holds  4/27/2017  
Permit Ready to Issue  4/27/2017 DONE
all requirements met
Routing PW Grading-Hillside4/25/2017 4/25/2017 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
1st review completed  4/24/2017 DONE
DetailsDavid Ferguson
Routing - PLAN CHECK3/29/2017 4/24/2017 FAIL
DetailsDavid Ferguson
Routing PW Grading-Hillside3/29/2017 4/10/2017 FAIL
DetailsJason C. Taylor
Need structural calcuations and readable plans. JCT
Routing - MECHANICAL4/3/2017 4/3/2017 PASS
DetailsTroy James
This design is unable to provide the neccessary cfm for cooling at 400cfm per ton. It is the responsibility of the mechanical contractor to make sure the cooling is sufficient to satisfy cooling needs.
Routing - MECHANICAL3/29/2017 3/31/2017 FAIL
DetailsTroy James
emailed corrections to manual j designer.
Route to Impact Fee Review3/29/20174/1/20173/30/2017 PASS
DetailsTonya Wallace
Initial residential review of new SFD permits requested for now.
Routing - PLANNING3/29/2017 3/30/2017 PASS
DetailsBrent Moore
Routing - Erosion and Sediment3/29/2017 3/30/2017 PASS
DetailsAndy J. Long
ESC plan approved, valid RP and PD designated. Site preparation inspection required, call ###-####
Routing - FIRE3/29/20173/29/20173/29/2017 PASS
DetailsKatie Marron
Plans were reviewed for fd access, hydrant availability and defensible space.
Plan assigned to (AJS)3/29/20173/29/20173/29/2017 DEFR
DetailsAdele J Schaffeld-Griffin
Routing - Addressing3/29/2017 3/29/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS3/29/2017 3/29/2017 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  3/29/2017 DONE
Intake Approval  3/29/2017 PASS
Override - Parcel Holds  3/29/2017  
Recd Pcfee & Taken To Pln CK  3/29/2017 DONE
Intake Approval  3/15/2017 FAIL
DetailsChristina Prado
Plans are all set, but there is an appeal period pending for the CFH approval. Please resubmit on March 23rd.
Application received  3/14/2017 DONE
Application submitted via PDS Online on Mar 14 2017 8:01AM