Letter of compliance/Occupancy | | | 7/17/2020 | | DONE |
|
|
|
|
BLD-Final | 4/11/2018 | 4/12/2018 | 4/12/2018 | P | PASS |
Dave Hannah
|
|
|
Clive Phone #: ###-####
|
DOC - Permit Finaled | 4/12/2018 | 4/12/2018 | 4/12/2018 | P | PASS |
Dave Hannah
|
|
|
|
PubWorks Occupancy Approval | 4/11/2018 | 4/11/2018 | 4/11/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 10/26/2017 | 10/27/2017 | 10/27/2017 | A | PASS |
Dave Hannah
|
|
|
Clive Phone #: ###-#### ok to cover all but for around fireplace
|
BLD-Framing/Rough-in | 10/24/2017 | 10/25/2017 | 10/25/2017 | A | PASS |
Dave Hannah
|
|
|
Doug Phone #: ###-####
|
BLD-Framing/Rough-in | 10/23/2017 | 10/24/2017 | 10/24/2017 | P | PEND |
Dave Hannah
|
|
|
Doug Phone #: ###-#### needs truss engineering
|
BLD-Other | 10/9/2017 | 10/9/2017 | 10/9/2017 | P | PASS |
Dave Hannah
|
|
|
soffits - Doug Phone #: ###-####
|
BLD-Wall Bracing | 10/3/2017 | 10/4/2017 | 10/4/2017 | P | PASS |
Dave Hannah
|
|
|
Shear // Doug Phone #: ###-####
|
Plan Modification Accepted | | | 9/18/2017 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 9/18/2017 | | 9/18/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Foundation | 6/23/2017 | 6/23/2017 | 6/23/2017 | P | PASS |
Brandon Shaw
|
|
|
As late as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Footing | 6/20/2017 | 6/20/2017 | 6/21/2017 | P | PASS |
Dave Hannah
|
|
|
As late as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
PubWorks Subgrade Approval | 6/21/2017 | 6/21/2017 | 6/21/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 6/6/2017 | 6/6/2017 | 6/6/2017 | P | PASS |
Dave Hannah
|
|
|
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Footing | 6/1/2017 | 6/1/2017 | 6/1/2017 | A | PART |
Dave Hannah
|
|
|
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro ok to pour backwall ftg
|
PubWorks Subgrade Approval | 6/1/2017 | 6/1/2017 | 6/1/2017 | | DONE |
Jason C. Taylor
|
|
|
***Downhill foundation only***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Inspection Record Card- Bld | | | 5/9/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/9/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 4/27/2017 | | |
|
|
|
|
Plan assigned to (DAF) | 3/29/2017 | 3/29/2017 | 4/27/2017 | | DONE |
David Ferguson
|
|
|
(1st done) due 4/17 - Need WUI detail for exterior fans and canned lights. Also failed hillside.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/27/2017 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 4/27/2017 | | |
|
|
|
|
Permit Ready to Issue | | | 4/27/2017 | | DONE |
|
|
|
all requirements met
|
Routing PW Grading-Hillside | 4/25/2017 | | 4/25/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
1st review completed | | | 4/24/2017 | | DONE |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 3/29/2017 | | 4/24/2017 | | FAIL |
David Ferguson
|
|
|
|
Routing PW Grading-Hillside | 3/29/2017 | | 4/10/2017 | | FAIL |
Jason C. Taylor
|
|
|
Need structural calcuations and readable plans. JCT
|
Routing - MECHANICAL | 4/3/2017 | | 4/3/2017 | | PASS |
Troy James
|
|
|
This design is unable to provide the neccessary cfm for cooling at 400cfm per ton. It is the responsibility of the mechanical contractor to make sure the cooling is sufficient to satisfy cooling needs.
|
Routing - MECHANICAL | 3/29/2017 | | 3/31/2017 | | FAIL |
Troy James
|
|
|
emailed corrections to manual j designer.
|
Route to Impact Fee Review | 3/29/2017 | 4/1/2017 | 3/30/2017 | | PASS |
Tonya Wallace
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 3/29/2017 | | 3/30/2017 | | PASS |
Brent Moore
|
|
|
|
Routing - Erosion and Sediment | 3/29/2017 | | 3/30/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan approved, valid RP and PD designated. Site preparation inspection required, call ###-####
|
Routing - FIRE | 3/29/2017 | 3/29/2017 | 3/29/2017 | | PASS |
Katie Marron
|
|
|
Plans were reviewed for fd access, hydrant availability and defensible space.
|
Plan assigned to (AJS) | 3/29/2017 | 3/29/2017 | 3/29/2017 | | DEFR |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Addressing | 3/29/2017 | | 3/29/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 3/29/2017 | | 3/29/2017 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/29/2017 | | DONE |
|
|
|
|
Intake Approval | | | 3/29/2017 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 3/29/2017 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/29/2017 | | DONE |
|
|
|
|
Intake Approval | | | 3/15/2017 | | FAIL |
Christina Prado
|
|
|
Plans are all set, but there is an appeal period pending for the CFH approval. Please resubmit on March 23rd.
|
Application received | | | 3/14/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 14 2017 8:01AM
|