BLD-Final | 10/20/2017 | 10/23/2017 | 10/23/2017 | A | PASS |
Dave Hannah
|
|
|
Rolo Phone #: ###-####
|
DOC - Permit Finaled | 10/23/2017 | 10/23/2017 | 10/23/2017 | P | PASS |
Dave Hannah
|
|
|
|
PubWorks Occupancy Approval | 10/20/2017 | 10/20/2017 | 10/20/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Other | 8/8/2017 | 8/8/2017 | 8/8/2017 | P | PASS |
Brandon Shaw
|
|
|
Sofits- Rollo Phone #: ###-####
|
BLD-Energy code compliance | 7/19/2017 | 7/19/2017 | 7/19/2017 | P | PASS |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
BLD-Framing/Rough-in | 7/13/2017 | 7/13/2017 | 7/13/2017 | P | FAIL |
Brandon Shaw
|
|
|
1) Per plans, (2) 9 1/2 LVL's header at main entrance 2) Shim truss hangers at D3 truss. OK to insulate
|
BLD-Wall Bracing | 6/29/2017 | 6/29/2017 | 6/29/2017 | P | PART |
Brandon Shaw
|
|
|
Hold downs for interior shear to be added, see red paint
|
BLD-Foundation | 5/17/2017 | 5/17/2017 | 5/17/2017 | P | PASS |
Brandon Shaw
|
|
|
Wall // Rolo Phone #: ###-#### OK to pour, all exterior hold downs/straps in place. Interior hold downs to be placed at time of framing.
|
BLD-Footing | 5/16/2017 | 5/16/2017 | 5/16/2017 | P | PASS |
Brandon Shaw
|
|
|
Dion Phone #: ###-####
|
Inspection Record Card- Bld | | | 5/16/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/16/2017 | | DONE |
|
|
|
|
PubWorks Subgrade Approval | 5/15/2017 | 5/15/2017 | 5/15/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 4/17/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 3/22/2017 | 3/22/2017 | 4/17/2017 | | DONE |
Brian McGowan
|
|
|
Due 4-3 Level 2 - ePlan - PW - Hillside failed it
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/17/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 4/17/2017 | | DONE |
|
|
|
MET
|
Routing PW Grading-Hillside | 3/15/2017 | | 4/11/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
1st review completed | | | 4/2/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 3/15/2017 | | 4/2/2017 | | PASS |
Brian McGowan
|
|
|
|
Plan assigned to (LEG) Tisha | 3/15/2017 | | 3/22/2017 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - MECHANICAL | 3/15/2017 | | 3/17/2017 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 3/15/2017 | | 3/17/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Valid RP and PD designated. Site preparation required.
|
Route to Impact Fee Review | 3/15/2017 | 3/18/2017 | 3/16/2017 | | PASS |
Tonya Wallace
|
|
|
Initial residential review of all new news permit requested for now.
|
Routing - FIRE | 3/15/2017 | 3/15/2017 | 3/15/2017 | | PASS |
Katie Marron
|
|
|
Plans were reviewed for FD Access, hydrant availability and defensible space.
|
Routing - PLANNING | 3/15/2017 | | 3/15/2017 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 3/15/2017 | | 3/15/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 3/15/2017 | | 3/15/2017 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/15/2017 | | DONE |
|
|
|
|
Intake Approval | | | 3/15/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/15/2017 | | DONE |
|
|
|
|
Application received | | | 3/14/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 14 2017 9:15AM
|