BLD-Final | 5/8/2017 | 5/9/2017 | 5/9/2017 | A | PASS |
Jim Sly
|
|
|
Lucas Phone #: ###-####
|
DOC - Permit Finaled | 5/9/2017 | 5/9/2017 | 5/9/2017 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 3/30/2017 | 3/31/2017 | 3/31/2017 | A | PASS |
Jim Sly
|
|
|
Lucas Phone #: ###-####
|
BLD-Framing/Rough-in | 3/29/2017 | 3/29/2017 | 3/29/2017 | P | PASS |
Jim Sly
|
|
|
Call ahead for lock box code - Lucas Phone #: ###-####
|
Permit Ready to Issue | | | 3/17/2017 | | DONE |
|
|
|
MET
|
Telephone call | | | 3/17/2017 | | DONE |
|
|
|
called Lucas to let know permit is ready and how much is owed
|
Issue PAID IN FULL permit | | | 3/17/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/17/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/16/2017 | | 3/16/2017 | | PASS |
Tisha Gallop
|
|
|
received pictures via e-mail
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/16/2017 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 3/14/2017 | | 3/15/2017 | | DONE |
Tisha Gallop
|
|
|
***walk-in recieved 3/14 (fire damage) failed
|
1st review completed | | | 3/15/2017 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 3/14/2017 | 3/14/2017 | 3/14/2017 | P | CANC |
Tisha Gallop
|
|
|
took in as level 2; routed to mechanical
|
Routing - MECHANICAL | 3/14/2017 | | 3/14/2017 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLAN CHECK | 3/14/2017 | | 3/14/2015 | | FAIL |
Tisha Gallop
|
|
|
need pictures, insurance report, or fire dept report; called applicant
|
Application received | | 3/14/2017 | | | |
|
|
|
|