BLD-Final | 11/2/2017 | 11/2/2017 | 11/2/2017 | P | PASS |
Brandon Shaw
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
|
DOC - Permit Finaled | 11/2/2017 | 11/2/2017 | 11/2/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 11/1/2017 | 11/1/2017 | 11/2/2017 | P | FAIL |
Brandon Shaw
|
|
|
Need Public Works and screws in dryer vent-remove or replace dryer duct
|
PubWorks Occupancy Approval | 11/2/2017 | 11/2/2017 | 11/2/2017 | | DONE |
Melissa Jannusch
|
|
|
BND17-00097 posted for revegetation. A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 7/21/2017 | 7/24/2017 | 7/24/2017 | P | PASS |
Dave Hannah
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Energy code compliance | 7/20/2017 | 7/21/2017 | 7/21/2017 | P | FAIL |
Jim Storey
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch ceilling not complet
|
BLD-Framing/Rough-in | 7/19/2017 | 7/20/2017 | 7/20/2017 | A | PASS |
Tony Young
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch,, ok to insulate
|
BLD-Framing/Rough-in | 7/19/2017 | 7/20/2017 | 7/20/2017 | P | CANC |
Tony Young
|
|
|
Thanks Phone #: ###-#### >> Inspection requested via web by bryan murdoch Inspection cancelled from web by: bryan murdoch
|
BLD-Framing/Rough-in | 7/17/2017 | 7/17/2017 | 7/17/2017 | P | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch need ratted boxes on soffit for av/ need mech and fire
|
Plan Modification Accepted | | | 6/28/2017 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 6/28/2017 | | 6/28/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 6/26/2017 | 6/26/2017 | 6/26/2017 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch,, exterior ok
|
BLD-Foundation | 4/24/2017 | 4/25/2017 | 4/25/2017 | P | PASS |
Tony Young
|
|
|
Eric Phone #: ###-####
|
BLD-Foundation | 4/18/2017 | 4/20/2017 | 4/20/2017 | P | PART |
Tony Young
|
|
|
Eric Phone #: ###-####
|
BLD-Footing | 4/11/2017 | 4/12/2017 | 4/12/2017 | P | PART |
Tony Young
|
|
|
Call Eric if there''s any problems ###-#### Phone #: ###-#### Inspection requested via web by bryan murdoch,, work ion progress,, need to meet footing thickness as per plan
|
PubWorks Subgrade Approval | 4/10/2017 | 4/10/2017 | 4/10/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Issue PAID IN FULL permit | | | 4/4/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 4/3/2017 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/3/2017 | | DONE |
|
|
|
|
Telephone call | | | 4/3/2017 | | DONE |
|
|
|
Left a message for Doug informing him that this permit is ready to be picked up and the fee amount due for issunace
|
Override - Parcel Holds | | | 4/3/2017 | | |
|
|
|
|
Permit Ready to Issue | | | 4/3/2017 | | DONE |
|
|
|
MET
|
Plan assigned to (DAF) | 3/22/2017 | 3/22/2017 | 4/2/2017 | | DONE |
David Ferguson
|
|
|
due 4/3
|
Routing - PLAN CHECK | 3/23/2017 | | 4/2/2017 | | PASS |
David Ferguson
|
|
|
|
1st review completed | | | 4/2/2017 | | DONE |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 4/2/2017 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/2/2017 | | DONE |
|
|
|
|
Routing - FIRE | 3/21/2017 | 3/15/2017 | 3/23/2017 | | PASS |
Scott Arellano
|
|
|
Fire Sprinklers are required in this subdivision due to single access FD roadway lengths exceeding 700 feet. Refer to SUB15-00072.
|
Plan assigned to (LEG) Tisha | 3/15/2017 | | 3/22/2017 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - Erosion and Sediment | 3/20/2017 | | 3/21/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan and site map approved. Valid RP and PD. Site preparation inspection required.
|
Routing - MECHANICAL | | | 3/20/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 3/17/2017 | | 3/17/2017 | | PASS |
Sue Cummings
|
|
|
|
Routing PW Grading-Hillside | 3/15/2017 | | 3/17/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PUBLIC WORKS | 3/17/2017 | | 3/17/2017 | | PASS |
Morgan Webb
|
|
|
|
Route to Impact Fee Review | 3/15/2017 | 3/18/2017 | 3/16/2017 | | PASS |
Tonya Wallace
|
|
|
Initial residential review of all new news permit requested for now.
|
Routing PW Sewer Rating | 3/15/2017 | | 3/15/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - Addressing | 3/15/2017 | | 3/15/2017 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/15/2017 | | DONE |
|
|
|
|
Intake Approval | | | 3/15/2017 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 3/15/2017 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/15/2017 | | DONE |
|
|
|
|
Application received | | 3/14/2017 | | | |
|
|
|
|