Meeting | | | 5/11/2018 | | DONE |
|
|
|
sent statement 5-14
|
(F) Reprint permit | | | 4/30/2018 | | DONE |
|
|
|
|
Print Statement | | | 4/30/2018 | | DONE |
|
|
|
|
Second Notice | | 3/24/2018 | 4/10/2018 | | DONE |
|
|
|
mailed 4-11-18
|
First Notice | 3/1/2018 | 3/1/2018 | 3/14/2018 | | DONE |
Brandon Shaw
|
|
|
Mailed 3-15-18
|
PubWorks Occupancy Approval | 3/7/2018 | 3/7/2018 | 3/7/2018 | | DONE |
Tiffany Lowery
|
|
|
Final Public Works inspection completed 02/08/18.
|
Permanent Occupancy | | | 3/7/2018 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 3/7/2018 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 2/28/2018 | 3/1/2018 | 3/1/2018 | P | PASS |
Brandon Shaw
|
|
|
Planning ; zoning just signed off. Thanks Phone #: ###-#### Inspection requested via web by Mark Steen
|
DOC - Permit Finaled | 3/1/2018 | 3/1/2018 | 3/1/2018 | P | PASS |
Brandon Shaw
|
|
|
|
Zoning Approval | 2/28/2018 | 2/28/2018 | 2/28/2018 | | DONE |
Andrea Tuning
|
|
|
The Planning and Services Director, Derick O'Neill, has eliminated the requirement for this project to provide the required bicycle parking on this site.
|
FIRE-Final Inspection | 2/19/2018 | 2/20/2018 | 2/20/2018 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 2/6/2018 | 2/7/2018 | 2/7/2018 | P | FAIL |
Troy Cobbley
|
|
|
Repair the north end exit signs, repair the bay emergency lights, provide annual inspection for the fire extinguishers, provide small documents.
Phone #: ###-#### Inspection requested via web by Mark Steen
|
BLD-Ceiling Grid Inspection | 1/22/2018 | 1/23/2018 | 1/23/2018 | A | PASS |
Mike Jordan
|
|
|
12'' x 18'' storage room Phone #: ###-#### Inspection requested via web by Mark Steen
|
BLD-Framing/Rough-in | 12/14/2017 | 12/15/2017 | 12/15/2017 | A | PART |
Mike Jordan
|
|
|
Just two small rooms with metal studs. Thanks Phone #: ###-#### Inspection requested via web by Mark Steen. Interior steel stud framed walls and hardlid only. Pending mech. and plumbing rough in inspections.
|
BLD-Foundation | 7/28/2017 | 7/31/2017 | 7/31/2017 | A | DEFR |
Mike Jordan
|
|
|
MTI to check rebar and test concrete. The pour is scheduled for 10am. thanks, Mark Steen Phone #: ###-#### Inspection requested via web by Kareen Falls. Special inspector on site.
|
BLD-Footing | 7/26/2017 | 7/27/2017 | 7/27/2017 | A | PART |
Mike Jordan
|
|
|
MTI to Insp ftgs and concrete. Scheduled to pour at noon. Thanks, Mark Steen Phone #: ###-#### Inspection requested via web by Kareen Falls. Work in progress on perimeter footings. Will have special inspection.
|
Issue PAID IN FULL permit | | | 7/13/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/13/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/13/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 7/5/2017 | | |
|
|
|
|
Plan assigned to (JAR) | 4/18/2017 | 4/18/2017 | 7/5/2017 | | DONE |
Julie Romig
|
|
|
1st Review Comp - Resubmitted 06/26 - 502 Jordan Wilcomb Warehouse
|
Routing PW Drainage | 6/26/2017 | | 7/5/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 6/26/2017 | | 7/5/2017 | | PASS |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/5/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/5/2017 | | DONE |
Christina Prado
|
|
|
All Met - Be sure to issue GRD C_P //// Need ACHD & GRD issued C_P //// Need ACHD, RP, GC Form, Revised Cert of Value and GRD17-00026 hasn't been issued yet
|
Route to Impact Fee Review | 6/24/2017 | 6/27/2017 | 7/4/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 6/26/2017 | 6/26/2017 | 6/29/2017 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans and case.
|
Routing Off Site - STRUCTURAL | 6/26/2017 | | 6/28/2017 | | PASS |
Julie Romig
|
|
|
Pass per ePlanReview
|
Routing - Design Review | 6/26/2017 | | 6/26/2017 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLUMBING | 6/26/2017 | | 6/26/2017 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
1st review completed | | | 6/24/2017 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 4/18/2017 | | 6/24/2017 | | FAIL |
Julie Romig
|
|
|
|
Routing Off Site - STRUCTURAL | 4/18/2017 | | 6/23/2017 | | FAIL |
Julie Romig
|
|
|
Per ePlanReview - corrections required.
|
Routing PW Environmental | 4/18/2017 | | 4/26/2017 | | PASS |
Rick Christenson
|
|
|
Interceptor Shown
|
Routing - FIRE | 4/18/2017 | 4/18/2017 | 4/24/2017 | | FAIL |
Scott Arellano
|
|
|
Emailed Architect correction items. Attached plan review to case.
|
Telephone call | | | 4/24/2017 | | DONE |
Scott Arellano
|
|
|
Spoke with Damon Beard reqarding fire department vehicle access and minimum required security gate width.
|
Routing - PLANNING Land Div | 4/18/2017 | | 4/20/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing PW Sewer Design | 4/18/2017 | | 4/19/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Plan assigned to (JG) | 4/18/2017 | 4/18/2017 | 4/18/2017 | | DEFR |
Javier Guzman
|
|
|
|
Routing - Design Review | 4/18/2017 | | 4/18/2017 | | FAIL |
Andrea Tuning
|
|
|
a. Install one (1) bicycle parking stall located near the buildings main entrance, convenient and visible to individuals utilizing alternative transportation.
b. Design the storm basin where gravel, rock, or cobble surface of swales do not exceed 20 percent of the surface area of the bottom of the swale and all swales shall be vegetated with appropriate plant materials.
|
Routing PW Drainage | 4/18/2017 | | 4/18/2017 | | FAIL |
Brian Murphy
|
|
|
need 25 ft from interior lot line 50 feet from bld.
|
Routing - Addressing | 4/18/2017 | | 4/18/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 4/18/2017 | | 4/18/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 4/18/2017 | | 4/18/2017 | | PASS |
Andy J. Long
|
|
|
Vaild RP and PD. Plan ok.
|
Routing - MECHANICAL | 4/18/2017 | | 4/18/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 4/18/2017 | | 4/18/2017 | | FAIL |
Bill VanDegrift
|
|
|
show sewer routing to the north to match civil design.
|
Routing - PLANNING | 4/18/2017 | | 4/18/2017 | | PASS |
Cody Riddle
|
|
|
No review required
|
Intake Approval | | | 4/18/2017 | | PASS |
|
|
|
|
Routing PW Street Lights | 4/18/2017 | | 4/18/2017 | | PASS |
Tom Marshall
|
|
|
|
Intake Approval | | | 3/16/2017 | | FAIL |
Javier Guzman
|
|
|
Please provide the following items:
1. ESC plans incorporated into drawing file on a minimum 18 x 24 plan sheets, Plans must be designed for the specific project, and be prepared and signed by a plan designer certified by Boise City. (the ESC-1 plan sheet in the small documents ESC package just needs to be transferred into the drawings file on 18” x 24” sheets)
2. Please transfer all the engineered plan sheets in small documents labeled “Doc_Steel Building Shop Drawings and Calcs” into the drawings file on a minimum 18” x 24” plan sheets (transfer them individually and not as a packet, in the landscape position, individual files named per ePlan submittal standards found at http://pds.cityofboise.org/media/105041/electronicstandards.pdf)
|
Application received | | | 3/15/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 15 2017 11:33AM
|