Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD17-00648
StatusFinaled
Name KELLY CROMWELL
Site Address 350 N MILWAUKEE ST Unit: 2092
Project NameBTS - #2092 Life is Good Boise
Customer Number 
ePlanReviewNo
Description
**(LIFE IS GOOD BOISE - BOISE TOWNE SQUARE - SPACE #2092)** Application for inspection to determine requirements for issuance of a Certificate of Occupancy for an existing 3,609 square foot mercantile tenant space previously occupied by “Wet Seal” under BLD01-00217. NO NEW WORK IS AUTHORIZED UNDER THIS PERMIT. This tenant space is equipped with an existing smoke evacuation system and that system must be maintained operational. There are no changes to occupancy or use under this permit. Note: newest floor plan scope of work possibly never took place in 2011, field inspector to verify with floor plan from 2001 remodel. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/16/20173/20/20173/20/2017PPASS
DetailsMike Jordan
Kelly Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection3/20/20173/20/20173/20/2017PPASS
DetailsTroy Cobbley
Life safety passed
Permanent Occupancy  3/20/2017 DONE
FIRE-Final Inspection3/16/20173/17/20173/17/2017ACANC
DetailsTroy Cobbley
Mall opens at 10 // Kelly Phone #: ###-####
Application received 3/15/20173/16/2017 DONE
Plan assigned to (JG)3/15/20173/15/20173/16/2017 PASS
DetailsJavier Guzman
Life Is Good Boise, Occ Eval
Routing - PLAN CHECK3/15/2017 3/16/2017 PASS
DetailsJavier Guzman
Case Summary (BLD)  3/16/2017 DONE
DetailsJavier Guzman
1st review completed  3/16/2017 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  3/16/2017 DONE
Print Occupancy Form  3/16/2017 DONE
Permit Ready to Issue  3/16/2017 DONE
fees due-otherwise everything is met
Telephone call  3/16/2017 DONE
called Kelly to let know permit is ready and how much is owed
Issue PAID IN FULL permit  3/16/2017 DONE
Plans ACCEPTED BY PLAN TECH  3/15/2017  
Intake Approval  3/15/2017 PASS
DetailsJavier Guzman
Recd Pcfee & Taken To Pln CK  3/15/2017 DONE
as per Javier G-no fees are required at intake
First Notice 3/30/2017