BLD-Aging Inspection | 4/26/2018 | 4/26/2018 | 4/26/2018 | | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 4/25/2018 | 4/26/2018 | 4/26/2018 | A | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
DOC - Permit Finaled | 4/26/2018 | 4/26/2018 | 4/26/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 12/12/2017 | 12/13/2017 | 12/13/2017 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. Egress windows to be casements. Will verify on final.
|
BLD-Energy code compliance | 12/13/2017 | 12/13/2017 | 12/13/2017 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 12/12/2017 | 12/12/2017 | 12/12/2017 | P | FAIL |
Mike Jordan
|
|
|
Jim Phone #: ###-####. Complete lateral bracing, noted egress windows do not meet the min. net opening height of 24. inches.
|
BLD-Framing/Rough-in | 12/5/2017 | 12/6/2017 | 12/6/2017 | A | NR |
Mike Jordan
|
|
|
request mid morning or afternoon // Jim Phone #: ###-####. Needs electrical rough in inspection and complete foam seal.
|
Plan Modification Accepted | | | 11/30/2017 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 11/30/2017 | | 11/30/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 11/3/2017 | 11/3/2017 | 11/3/2017 | P | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-#### garage ok
|
BLD-Framing/Rough-in | 9/5/2017 | 9/5/2017 | 9/5/2017 | P | CANC |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 9/5/2017 | 9/5/2017 | 9/5/2017 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. Exterior wall bracing, main house only ok.
|
BLD-Foundation | 6/26/2017 | 6/26/2017 | 6/26/2017 | P | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####
|
BLD-Footing | 5/24/2017 | 5/24/2017 | 5/24/2017 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. South half of footings ok.
|
BLD-Footing | 5/5/2017 | 5/8/2017 | 5/8/2017 | A | PART |
Dave Hannah
|
|
|
Jim Phone #: ###-#### north half ok to pour
|
BLD-Conference | 4/17/2017 | 4/17/2017 | 4/17/2017 | P | DONE |
Mike Jordan
|
|
|
James Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/17/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 4/10/2017 | | |
|
|
|
|
Plan assigned to (JG) | 4/4/2017 | 4/4/2017 | 4/10/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 3/28 L1 2300 sq. ft., one story single family dwelling Paper
|
Inspection Record Card- Bld | | | 4/10/2017 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 4/10/2017 | | DONE |
Christina Prado
|
|
|
Emailed amount due to homeowner
|
Case Summary (BLD) | | | 4/10/2017 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/10/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/10/2017 | | DONE |
Christina Prado
|
|
|
Homeowner GC & RP, All requirements met
|
Routing - MECHANICAL | 4/7/2017 | | 4/7/2017 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 4/5/2017 | | FAIL |
Javier Guzman
|
|
|
failed Mechanical
|
Routing - PLAN CHECK | 3/21/2017 | | 4/5/2017 | | PASS |
Javier Guzman
|
|
|
|
Plan assigned to (BJM) | 3/28/2017 | 3/28/2017 | 4/4/2017 | | DEFR |
Brian McGowan
|
|
|
|
Routing - MECHANICAL | | | 3/21/2017 | | FAIL |
Troy James
|
|
|
emailed heating contractor corrections
|
Plan assigned to (LEG) Tisha | 3/15/2017 | | 3/21/2017 | | DEFR |
Tisha Gallop
|
|
|
|
Route to Impact Fee Review | 3/15/2017 | 3/18/2017 | 3/16/2017 | | PASS |
Tonya Wallace
|
|
|
Initial residential review of all new news permit requested for now.
|
Routing - PUBLIC WORKS | 3/15/2017 | | 3/16/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - Addressing | 3/15/2017 | | 3/15/2017 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/15/2017 | | DONE |
|
|
|
|
Intake Approval | | | 3/15/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/15/2017 | | DONE |
|
|
|
|
Application received | | 3/15/2017 | | | |
|
|
|
|
Routing - PLANNING | 3/16/2017 | | | | PASS |
|
|
|
Passed wiwth corrections (redlines) Front setback is measured from Property line, not the ROW. Required parking must have paved driveway, no gravel. Wheel strips are O.K. too.
|