Print Statement | | | 12/1/2017 | | DONE |
|
|
|
|
Print Statement | | | 11/30/2017 | | DONE |
|
|
|
|
Third Notice | | 10/17/2017 | 11/14/2017 | | DONE |
|
|
|
Mailed 11-15-17
|
Second Notice | | 9/29/2017 | 10/12/2017 | | DONE |
|
|
|
Mailed 10-13-17
|
First Notice | | 9/7/2017 | 9/19/2017 | | DONE |
|
|
|
Mailed 9-20-17
|
Permanent Occupancy | | | 8/28/2017 | | DONE |
|
|
|
|
BLD-Final | 8/24/2017 | 8/25/2017 | 8/25/2017 | P | PASS |
Dave Hannah
|
|
|
Roco Phone #: ###-####
|
FIRE-Final Inspection | 8/24/2017 | 8/24/2017 | 8/24/2017 | A | PASS |
Jim Page
|
|
|
Previously noted fire alarm issues have been repaired and final inspection complete. Final life fire safety inspection passed/complete.
|
BLD-Final | 6/30/2017 | 6/30/2017 | 6/30/2017 | P | DONE |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 6/29/2017 | 6/30/2017 | 6/30/2017 | A | PART |
Jim Page
|
|
|
TCO authorized for 30 days per conversation with Scott Arellano, FIR permit is in review status for minor fire alarm modifications, TCO is contingent on fire alarm modifications being completed, a final inspection performed and fire alarms passing inspection. Fire sprinkler inspection is complete, fire extinguishers are in place with current inspection tags. Fire life safety inspection complete for TCO, fire alarm inspection to be completed when FIR perimit is issued.
|
Temporary Occupancy | 6/30/2017 | 9/28/2017 | 6/30/2017 | | DONE |
Candy A. Nichols
|
|
|
pending fire life safety final-told Mark he would need to also need to re call in the final final
|
Zoning Approval | 6/30/2017 | 6/30/2017 | 6/30/2017 | | PASS |
Katelyn Menuge
|
|
|
DRH17-00043
|
Telephone call | | | 6/30/2017 | | DONE |
|
|
|
Mark ###-#### came in to get temp c of o-DAve H ok'd Temp but P&Z and PW have not had the final insp yet-i called Mark and gave the phone #'ers for PW & Katelyn M-told him they need to do the insp before we can iss the temp-
|
FIRE-Final Inspection | 6/28/2017 | 6/29/2017 | 6/29/2017 | A | CANC |
Jim Page
|
|
|
Final life fire safety inspection cannot be completed until a fire alarm contractor is contacted and modifications are made to the existing fire system as stated in the fire plan review comments, this inspection request is cancelled.
|
BLD-Final | 6/27/2017 | 6/28/2017 | 6/28/2017 | P | NR |
Dave Hannah
|
|
|
Mark Phone #: ###-#### needs fire final first
|
FIRE-Final Inspection | 6/27/2017 | 6/28/2017 | 6/28/2017 | A | FAIL |
Jim Page
|
|
|
Modifications need to be made to the existing fire alarm system, life fire safety inspection cannot be completed until fire alarm modifications have been made, inspected and passed.
|
BLD-Ceiling Grid Inspection | 6/22/2017 | 6/22/2017 | 6/23/2017 | P | PASS |
Dave Hannah
|
|
|
Mark Phone #: ###-####
|
BLD-Framing/Rough-in | 5/23/2017 | 5/23/2017 | 5/24/2017 | P | PEND |
Dave Hannah
|
|
|
Mark Phone #: ###-#### ok after elec rough in
|
Plan assigned to (CJW) | 3/24/2017 | 3/24/2017 | 5/4/2017 | | PASS |
Carl Westfall
|
|
|
(1st done) (Apr 13 - 15 days) (29 sheets) The STIL Ice Cream Shop
|
Routing - PLAN CHECK | 4/28/2017 | | 5/4/2017 | | PASS |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/4/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/4/2017 | | DONE |
Christina Prado
|
|
|
All met 5/4/17 C_P /// Needs; GC Form & Revised Cert of Value
|
Issue PAID IN FULL permit | | | 5/4/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/4/2017 | | DONE |
|
|
|
|
Routing - MECHANICAL | 4/28/2017 | | 5/3/2017 | | PASS |
Chad Schwendiman
|
|
|
|
Plan resubmittals requested | | | 4/28/2017 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/28/2017 | | DONE |
|
|
|
|
Routing - MECHANICAL | 4/26/2017 | | 4/27/2017 | | FAIL |
Chad Schwendiman
|
|
|
Corrections not made
|
Routing - PLAN CHECK | 4/25/2017 | | 4/26/2017 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLUMBING | 4/26/2017 | | 4/26/2017 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Plan resubmittals requested | | | 4/25/2017 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/25/2017 | | DONE |
|
|
|
|
Routing - MECHANICAL | 4/21/2017 | | 4/24/2017 | | FAIL |
Troy James
|
|
|
|
Routing - PLUMBING | 4/21/2017 | | 4/24/2017 | | FAIL |
Daryl Spivey
|
|
|
Waste and vent plan was not included in e-plan.
|
Routing - PLAN CHECK | 4/20/2017 | | 4/21/2017 | | PASS |
Carl Westfall
|
|
|
|
Plan resubmittals received | | | 4/20/2017 | | DONE |
|
|
|
|
Route to Impact Fee Review | 4/15/2017 | 4/18/2017 | 4/17/2017 | | PASS |
Tonya Wallace
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 4/15/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 4/15/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/24/2017 | | 4/15/2017 | | FAIL |
Carl Westfall
|
|
|
See the IBC plan review report
|
Routing PW Environmental | 3/27/2017 | | 4/3/2017 | | PASS |
Rick Christenson
|
|
|
Grease Trap shown. Approved per plumbing review of waste & vent plan.
|
Routing - Erosion and Sediment | 3/24/2017 | | 3/31/2017 | | PASS |
Andy J. Long
|
|
|
minimal exterior disturbance, no permit required.
|
Routing - FIRE | 3/24/2017 | 3/24/2017 | 3/29/2017 | | PASS |
Katie Marron
|
|
|
comments attached to case.
|
Routing - PLUMBING | 3/24/2017 | | 3/28/2017 | | FAIL |
Daryl Spivey
|
|
|
Submit waste and vent plan for new plumbing.
|
Routing - Addressing | 3/24/2017 | | 3/27/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 3/24/2017 | | 3/27/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - MECHANICAL | 3/27/2017 | | 3/27/2017 | | FAIL |
Troy James
|
|
|
|
Routing - Design Review | 3/24/2017 | | 3/27/2017 | | PASS |
Katelyn Menuge
|
|
|
DRH17-00043
|
Plan Reviewer's activity | | | 3/24/2017 | | PASS |
|
|
|
Plan intake approved
|
Intake Approval | | | 3/24/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
CArl W completed pre screen,
CDH approvals uploaded into e plan
|
Plan Reviewer's activity | | | 3/21/2017 | | DONE |
|
|
|
A separate interior nonstructural demo permit is requested
|
Intake Approval | | | 3/21/2017 | | FAIL |
Carl Westfall
|
|
|
(3-21-17) See the circled items in the plan intake checklist. Please resolve each item as directed.
|
Application received | | | 3/15/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 15 2017 4:52PM
|