Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD17-00654
StatusFinaled
Name CSDI CONSTRUCTION INC
Site Address 786 W BROAD ST
Project NameThe STIL Ice Cream Shop
Customer Number 
ePlanReviewYes
Description
(THE STIL ICE CREAM SHOP – 1ST STORY – NEAR SOUTHWEST CORNER) (DRH17-00043) The fire sprinkler system is used for fire area and for the multi-theater complex. To convert an existing 880 square foot retail sales tenant space on the 1st story to a restaurant that will serve ice cream, beer, wine, and other food items. Interior non-structural demolition work was done under permit BLD17-01065. Egress from this tenant space is directly to the outside at grade. Work is to include a new toilet room accessible to the disabled (2 total provided), interior nonbearing walls, a kitchen with kitchen equipment, two new exterior overhead doors that drop to the surface of new counter tops, exterior walls below the countertops, steel columns and headers to support the new overhead doors, a fixed 42” high standing bar, a grease interceptor, a water heater platform above the existing restroom, a suspended ceiling grid with vinyl faced ceiling panels, gypsum board ceilings, an exterior awning, and interior finishes. For the steel columns and headers at the new overhead doors, Special Inspection is required for welding and for anchors post installed in hardened concrete. Cooking operations that create grease laden vapors are not allowed within this tenant space. An exterior dining area surrounded by a 36” high fence and having 30 chairs will be created. The existing interior concrete floor will be saw cut to facilitate the insulation of under slab plumbing. The concrete floor slab will be patched after the plumbing is installed and the trenches are backfilled. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  12/1/2017 DONE
Print Statement  11/30/2017 DONE
Third Notice 10/17/201711/14/2017 DONE
Mailed 11-15-17
Second Notice 9/29/201710/12/2017 DONE
Mailed 10-13-17
First Notice 9/7/20179/19/2017 DONE
Mailed 9-20-17
Permanent Occupancy  8/28/2017 DONE
BLD-Final8/24/20178/25/20178/25/2017PPASS
DetailsDave Hannah
Roco Phone #: ###-####
FIRE-Final Inspection8/24/20178/24/20178/24/2017APASS
DetailsJim Page
Previously noted fire alarm issues have been repaired and final inspection complete. Final life fire safety inspection passed/complete.
BLD-Final6/30/20176/30/20176/30/2017PDONE
DetailsDave Hannah
FIRE-Final Inspection6/29/20176/30/20176/30/2017APART
DetailsJim Page
TCO authorized for 30 days per conversation with Scott Arellano, FIR permit is in review status for minor fire alarm modifications, TCO is contingent on fire alarm modifications being completed, a final inspection performed and fire alarms passing inspection. Fire sprinkler inspection is complete, fire extinguishers are in place with current inspection tags. Fire life safety inspection complete for TCO, fire alarm inspection to be completed when FIR perimit is issued.
Temporary Occupancy6/30/20179/28/20176/30/2017 DONE
DetailsCandy A. Nichols
pending fire life safety final-told Mark he would need to also need to re call in the final final
Zoning Approval6/30/20176/30/20176/30/2017 PASS
DetailsKatelyn Menuge
DRH17-00043
Telephone call  6/30/2017 DONE
Mark ###-#### came in to get temp c of o-DAve H ok'd Temp but P&Z and PW have not had the final insp yet-i called Mark and gave the phone #'ers for PW & Katelyn M-told him they need to do the insp before we can iss the temp-
FIRE-Final Inspection6/28/20176/29/20176/29/2017ACANC
DetailsJim Page
Final life fire safety inspection cannot be completed until a fire alarm contractor is contacted and modifications are made to the existing fire system as stated in the fire plan review comments, this inspection request is cancelled.
BLD-Final6/27/20176/28/20176/28/2017PNR
DetailsDave Hannah
Mark Phone #: ###-#### needs fire final first
FIRE-Final Inspection6/27/20176/28/20176/28/2017AFAIL
DetailsJim Page
Modifications need to be made to the existing fire alarm system, life fire safety inspection cannot be completed until fire alarm modifications have been made, inspected and passed.
BLD-Ceiling Grid Inspection6/22/20176/22/20176/23/2017PPASS
DetailsDave Hannah
Mark Phone #: ###-####
BLD-Framing/Rough-in5/23/20175/23/20175/24/2017PPEND
DetailsDave Hannah
Mark Phone #: ###-#### ok after elec rough in
Plan assigned to (CJW)3/24/20173/24/20175/4/2017 PASS
DetailsCarl Westfall
(1st done) (Apr 13 - 15 days) (29 sheets) The STIL Ice Cream Shop
Routing - PLAN CHECK4/28/2017 5/4/2017 PASS
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  5/4/2017 DONE
Permit Ready to Issue  5/4/2017 DONE
DetailsChristina Prado
All met 5/4/17 C_P /// Needs; GC Form & Revised Cert of Value
Issue PAID IN FULL permit  5/4/2017 DONE
Print Occupancy Form  5/4/2017 DONE
Routing - MECHANICAL4/28/2017 5/3/2017 PASS
DetailsChad Schwendiman
Plan resubmittals requested  4/28/2017 DONE
Plan resubmittals received  4/28/2017 DONE
Routing - MECHANICAL4/26/2017 4/27/2017 FAIL
DetailsChad Schwendiman
Corrections not made
Routing - PLAN CHECK4/25/2017 4/26/2017 PASS
DetailsCarl Westfall
Routing - PLUMBING4/26/2017 4/26/2017 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Plan resubmittals requested  4/25/2017 DONE
Plan resubmittals received  4/25/2017 DONE
Routing - MECHANICAL4/21/2017 4/24/2017 FAIL
DetailsTroy James
Routing - PLUMBING4/21/2017 4/24/2017 FAIL
DetailsDaryl Spivey
Waste and vent plan was not included in e-plan.
Routing - PLAN CHECK4/20/2017 4/21/2017 PASS
DetailsCarl Westfall
Plan resubmittals received  4/20/2017 DONE
Route to Impact Fee Review4/15/20174/18/20174/17/2017 PASS
DetailsTonya Wallace
Review requested for Commercial Permit
1st review completed  4/15/2017 DONE
Plan resubmittals requested  4/15/2017 DONE
Routing - PLAN CHECK3/24/2017 4/15/2017 FAIL
DetailsCarl Westfall
See the IBC plan review report
Routing PW Environmental3/27/2017 4/3/2017 PASS
DetailsRick Christenson
Grease Trap shown. Approved per plumbing review of waste & vent plan.
Routing - Erosion and Sediment3/24/2017 3/31/2017 PASS
DetailsAndy J. Long
minimal exterior disturbance, no permit required.
Routing - FIRE3/24/20173/24/20173/29/2017 PASS
DetailsKatie Marron
comments attached to case.
Routing - PLUMBING3/24/2017 3/28/2017 FAIL
DetailsDaryl Spivey
Submit waste and vent plan for new plumbing.
Routing - Addressing3/24/2017 3/27/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS3/24/2017 3/27/2017 PASS
DetailsMorgan Webb
Routing - MECHANICAL3/27/2017 3/27/2017 FAIL
DetailsTroy James
Routing - Design Review3/24/2017 3/27/2017 PASS
DetailsKatelyn Menuge
DRH17-00043
Plan Reviewer's activity  3/24/2017 PASS
Plan intake approved
Intake Approval  3/24/2017 PASS
DetailsAdele J Schaffeld-Griffin
CArl W completed pre screen,
CDH approvals uploaded into e plan
Plan Reviewer's activity  3/21/2017 DONE
A separate interior nonstructural demo permit is requested
Intake Approval  3/21/2017 FAIL
DetailsCarl Westfall
(3-21-17) See the circled items in the plan intake checklist. Please resolve each item as directed.
Application received  3/15/2017 DONE
Application submitted via PDS Online on Mar 15 2017 4:52PM