DOC - Permit Finaled | | | 6/23/2017 | | DONE |
|
|
|
|
BLD-Final | 6/22/2017 | 6/23/2017 | 6/22/2017 | A | PASS |
Brandon Shaw
|
|
|
Mike-please call to meet for access Phone #: ###-####
|
BLD-Framing/Rough-in | 4/10/2017 | 4/11/2017 | 4/11/2017 | A | PASS |
Brandon Shaw
|
|
|
Ted Phone #: ###-#### Pictures to be sent to verify fire calking above fire place.
|
Plan Reviewer's activity | | | 4/10/2017 | | DONE |
|
|
|
modification of roof beam. attached modification in documents, no fee due
|
BLD-Framing/Rough-in | 4/4/2017 | 4/4/2017 | 4/4/2017 | P | PART |
Dave Hannah
|
|
|
Late afternoon // Mike Phone #: ###-#### needs fire place rough in fire blocking above fireplace and engineering on beam see c/n
|
BLD-Foundation | 3/28/2017 | 3/28/2017 | 3/28/2017 | P | PASS |
Jim Storey
|
|
|
First thing this afternoon. Pour at 1 Rebar // Mike Phone #: ###-####
|
Telephone call | | | 3/24/2017 | | DONE |
|
|
|
Spoke with Ted (###-####) and he is going to speak to his son about how they want to pay since the payment came back. Gave him my number.
|
Telephone call | | | 3/23/2017 | | DONE |
|
|
|
Left a message for Ted informing him that the payment didn't go through on the 16th and to please give me a call back (###-####)
|
OVERRIDE | | | 3/16/2017 | | |
|
|
|
|
Routing Walk-In (Zoning) | 3/16/2017 | 3/16/2017 | 3/16/2017 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 3/16/2017 | 3/16/2017 | 3/16/2017 | A | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 3/16/2017 | | 3/16/2017 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 3/16/2017 | | DONE |
|
|
|
|
1st review completed | | | 3/16/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/16/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/16/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/16/2017 | | DONE |
|
|
|
|
Application received | | 3/16/2017 | | | |
|
|
|
|