Meeting | | | 5/11/2018 | | DONE |
|
|
|
sent statement 5-14
|
Third Notice | | 4/15/2018 | 5/8/2018 | | DONE |
|
|
|
This permit finaled on the web by Corinne Guho
|
Second Notice | | 3/24/2018 | 4/10/2018 | | DONE |
|
|
|
mailed 4-11-18
|
First Notice | | 2/26/2018 | 3/14/2018 | | DONE |
|
|
|
Mailed 3-15-18
|
BLD-Final | 2/15/2018 | 2/16/2018 | 2/16/2018 | A | PASS |
Tony Young
|
|
|
Phil Phone #: ###-####
|
PubWorks Occupancy Approval | 2/16/2018 | 2/16/2018 | 2/16/2018 | | DONE |
Jason C. Taylor
|
|
|
|
Permanent Occupancy | | | 2/16/2018 | | DONE |
|
|
|
|
BLD-Final | 2/6/2018 | 2/7/2018 | 2/7/2018 | A | PART |
Tony Young
|
|
|
phil Phone #: ###-####,, temp occ ok,, just needs smoke detector
|
FIRE-Final Inspection | 2/5/2018 | 2/6/2018 | 2/6/2018 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags, knox box is located by the fire bell and PIV. Final life fire safety inspection complete.
|
BLD-Energy code compliance | 11/21/2017 | 11/22/2017 | 11/22/2017 | A | PASS |
Tony Young
|
|
|
Phil Phone #: ###-####
|
BLD-Framing/Rough-in | 11/20/2017 | 11/21/2017 | 11/21/2017 | A | PASS |
Tony Young
|
|
|
Phil Phone #: ###-####
|
BLD-Framing/Rough-in | 11/14/2017 | 11/15/2017 | 11/15/2017 | P | PART |
Tony Young
|
|
|
Phil Phone #: ###-####,, walls ok to insulate,, fire blocking with insulation
|
BLD-Other | 10/31/2017 | 11/1/2017 | 11/1/2017 | A | PASS |
Dave Hannah
|
|
|
Energy for roof // Phil Phone #: ###-####
|
BLD-Wall Bracing | 10/24/2017 | 10/24/2017 | 10/24/2017 | P | PART |
Tony Young
|
|
|
Shear // Phil Phone #: ###-####,, exterior sheet rock on west side ok,, exterior plywood shear and roof nailing ok,, work in progress
|
BLD-Wall Bracing | 10/17/2017 | 10/17/2017 | 10/17/2017 | P | PART |
Tony Young
|
|
|
Phil Phone #: ###-####,, hold down and connection straps ok to cover with plywood
|
CHANGE STATUS TO (ISS) | | | 10/17/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/17/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/12/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 10/9/2017 | | |
|
|
|
|
Plan assigned to (CDM) | 9/25/2017 | 9/25/2017 | 10/9/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 9/25/2017 | | 10/9/2017 | | PASS |
Carl D Madsen
|
|
|
|
Issue PAID IN FULL permit | | | 10/9/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/9/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 10/9/2017 | | DONE |
|
|
|
was issued by mistake
|
Permit Ready to Issue | | | 10/9/2017 | | DONE |
|
|
|
plan mod please do no re issue
|
Plan Modification Accepted | | | 9/25/2017 | | DONE |
Christina Prado
|
|
|
Plan Mod to reconfigure the fire partitian walls surrounding the caretaker unit.
|
BLD-Footing | 9/5/2017 | 9/6/2017 | 9/6/2017 | A | PART |
Brandon Shaw
|
|
|
South and East footings, MTI on site, need report filed before final
|
BLD-Foundation | 8/14/2017 | 8/14/2017 | 8/14/2017 | P | PART |
Brandon Shaw
|
|
|
Foundation for the existing home ok,, work in progress
|
BLD-Footing | 8/3/2017 | 8/4/2017 | 8/4/2017 | P | PART |
Tony Young
|
|
|
Dan Phone #: ###-####,, footings for the existing home ok,, work in progress,, viewed compaction test results,, ok
|
(F) Reprint permit | | | 8/2/2017 | | DONE |
|
|
|
|
BLD-Conference | 7/13/2017 | 7/13/2017 | 7/13/2017 | P | PASS |
Tony Young
|
|
|
Dan Phone #: ###-####,, general ?s,, also looked at new floor joists, ok,, work in progress
|
(F) Reprint permit | | | 7/13/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/13/2017 | | DONE |
|
|
|
Plan Mod
|
OVERRIDE | | | 7/10/2017 | | |
|
|
|
|
Permit Ready to Issue | | | 7/10/2017 | | DONE |
Christina Prado
|
|
|
All requiremetns met for Plan Mod
Change status to ISS after payment - DO NOT RE-ISSUE PERMIT
|
Plan assigned to (CDM) | 7/5/2017 | 7/5/2017 | 7/8/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 7/5/2017 | | 7/8/2017 | | PASS |
Carl D Madsen
|
|
|
|
Plan Modification Accepted | | | 7/5/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/15/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/15/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/15/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 5/23/2017 | | |
|
|
|
|
Permit Ready to Issue | | | 5/23/2017 | | DONE |
Christina Prado
|
|
|
All requirements met 6/15/17 C_P ////// ***no ACHD fees see doc***Need ACHD, RP, GC Form & Revised Certificate of Value for issuance
|
Plan assigned to (CDM) | 3/22/2017 | 3/22/2017 | 5/22/2017 | | PASS |
Carl D Madsen
|
|
|
1st comp 2nd comp. James Castel House 4/22
|
Routing - PLAN CHECK | 5/9/2017 | | 5/22/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 5/9/2017 | | 5/22/2017 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/22/2017 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 4/25/2017 | | 5/9/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing Off Site - STRUCTURAL | 4/25/2017 | | 5/8/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 4/25/2017 | | 5/8/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLANNING | 4/25/2017 | | 4/27/2017 | | PASS |
David Moser
|
|
|
the applicant submited draft copies of the ACHD right-of-way easement and noted at CC is required to approval them
|
Routing PW Drainage | 4/25/2017 | | 4/27/2017 | | PASS |
Brian Murphy
|
|
|
|
Route to Impact Fee Review | 4/8/2017 | 4/11/2017 | 4/11/2017 | | PASS |
Tonya Wallace
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 3/22/2017 | | 4/8/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 3/22/2017 | | 4/8/2017 | | FAIL |
Carl D Madsen
|
|
|
|
1st review completed | | | 4/8/2017 | | |
|
|
|
|
Routing - MECHANICAL | 3/22/2017 | | 3/27/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 3/22/2017 | | 3/27/2017 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - FIRE | 3/22/2017 | 3/22/2017 | 3/24/2017 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing PW Solid Waste | 3/23/2017 | | 3/24/2017 | | PASS |
Evan Carpenter
|
|
|
Solid waste is OK as planned.
|
Routing - PLANNING Land Div | 3/22/2017 | | 3/24/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 3/22/2017 | | 3/23/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 3/22/2017 | | 3/23/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 3/22/2017 | | 3/23/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Need to designate RP upon contract reward. Site preparation inspeciton required, cal ###-####
|
Routing - PLANNING | 3/22/2017 | | 3/23/2017 | | FAIL |
David Moser
|
|
|
move the trash area out of the street side setback and upload right-of-way easment for the sidewalk.
|
Routing PW Drainage | 3/23/2017 | | 3/23/2017 | | FAIL |
Brian Murphy
|
|
|
MORE GRADING ELVS NEEDED CITY SWALES NEED SAND FREE DRAINING NOTE 2 FEET FROM P LINE ECT
|
Routing PW Street Lights | 3/23/2017 | | 3/23/2017 | | PASS |
Tom Marshall
|
|
|
|
Intake Approval | | | 3/22/2017 | | FAIL |
Julie Romig
|
|
|
Pre-screen #1: Need stamp/signature on Erosion and Sediment Control Narrative; Need stamp/signature on Drainage System Operation and Maintenance Plan; Need signature on Mechanical COMcheck Compliance Certificate.
|
Intake Approval | | | 3/22/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Julie approved pre screen
|
Application received | | | 3/16/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 16 2017 2:18PM
|