Permit Information
Permit NumberBLD17-00694
StatusFinaled
Name BARRIER BUILDING
Site Address 3642 S FINDLEY AVE
Project NameT-Mobile
Customer Number 
ePlanReviewYes
Description
(T-MOBILE) //Plan modification to relocate restroom fixture locations. 6-7-2017 JG// Permit is to remodel an existing 2,100 sq. ft. for retail use. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of interior nonbearing walls, removal of door/door frames, removal of suspended acoustic ceiling, new construction of interior non-bearing walls to create a sales area, a storage room, an open storage area, a mechanical room and an accessible restroom to the disabled, a new Hi/Lo accessible drinking fountain, new suspended acoustic ceiling, select new gypsum ceiling, relocation of existing light fixtures, plumbing work, electrical work, mechanical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered for area increase. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  8/4/2017 DONE
First Notice 7/9/20177/12/2017 DONE
Mailed 7-12-17
BLD-Final6/28/20176/29/20176/29/2017APASS
DetailsBrandon Shaw
Brett Barrier Phone #: ###-####
DOC - Permit Finaled6/29/20176/29/20176/29/2017PPASS
DetailsBrandon Shaw
Permanent Occupancy  6/29/2017 DONE
FIRE-Final Inspection6/28/20176/28/20176/28/2017PPASS
DetailsJim Page
Fire sprinkler inspection complete, no fire alarm modifications, fire extinguisher is in place with a current inspection tag. Final life fire safety inspection passed/complete.
BLD-Ceiling Grid Inspection6/26/20176/27/20176/27/2017APASS
DetailsJim Storey
Brett Barrier Phone #: ###-####
FIRE-Conference6/26/20176/27/20176/27/2017ADONE
DetailsJim Page
Fire conference complete
CHANGE STATUS TO (ISS)  6/26/2017 DONE
plan mod paid
Plan assigned to (JG)6/5/20176/5/20176/12/2017 PASS
DetailsJavier Guzman
Plan mod recieved revise bathroom layout, no new fixtures
Routing - PLAN CHECK6/6/2017 6/12/2017 PASS
DetailsJavier Guzman
Permit Ready to Issue  6/12/2017 DONE
DO NOT REISSUE all requirements met, fees due
Route to Impact Fee Review6/5/20176/8/20176/6/2017 PASS
DetailsMarissa Taylor
Review requested for Commercial Permit
Plan Modification Accepted  6/5/2017  
DetailsChristina Prado
Plan Mod to update restroom fixture locations
BLD-Framing/Rough-in5/31/20175/31/20175/31/2017PPART
DetailsBrandon Shaw
Brett Phone #: ###-#### Per Bradon partal pass only
Telephone call  5/30/2017 DONE
received phone call from contractor to schedule inspection. Told him still need ACHD then need someone to sign for building permit.
Issue PAID IN FULL permit  5/30/2017 DONE
Print Occupancy Form  4/14/2017 DONE
Routing - FIRE4/8/20174/8/20174/12/2017 PASS
DetailsKatie Marron
Comments attached to case.
Plan assigned to (JG)3/31/20173/31/20174/12/2017 PASS
DetailsJavier Guzman
4/13 L2 T-MOBILE TENANT IMPROVEMENT ePlan, Pend fire for 1st rev
1st review completed  4/12/2017 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  4/12/2017 DONE
Permit Ready to Issue  4/12/2017 DONE
need ACHD, ***MET 4-14-17 PAID BUILDING FEES TOO** GC & rev cert of val
Routing - PLAN CHECK3/31/2017 4/11/2017 PASS
DetailsJavier Guzman
Routing - Addressing3/31/2017 3/31/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS3/31/2017 3/31/2017 PASS
DetailsMorgan Webb
CREDITS GIVEN. NO NEW FEES.
Intake Approval  3/31/2017 PASS
DetailsJavier Guzman
Application received  3/20/2017 DONE
Application submitted via PDS Online on Mar 20 2017 9:47AM