BLD-Conference | 11/17/2017 | 11/17/2017 | 11/17/2017 | P | DONE |
Jim Sly
|
|
|
WIP
|
BLD-Aging Inspection | 11/17/2017 | 11/17/2017 | 11/17/2017 | | CANC |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 7/3/2017 | 7/5/2017 | 7/5/2017 | A | PASS |
Jim Sly
|
|
|
Chris Phone #: ###-####
|
BLD-Wall Bracing | 6/15/2017 | 6/15/2017 | 6/15/2017 | P | PASS |
Jim Sly
|
|
|
chris Phone #: ###-####
|
Routing Walk-In (BLD) | 6/8/2017 | 6/8/2017 | 6/8/2017 | P | PASS |
Josh Bogle
|
|
|
just talked about potential exterior stairs. Chris will bring in drawings JAB
|
BLD-Footing | 5/3/2017 | 5/4/2017 | 5/4/2017 | A | PART |
Dave Hannah
|
|
|
Matt Phone #: ###-#### setbacks ok forms up grade ok
|
Routing Walk-In (BLD) | 5/3/2017 | 5/3/2017 | 5/3/2017 | A | PASS |
Brian McGowan
|
|
|
Must provide gypsum board in detached garage now.
|
OVERRIDE | | | 4/24/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 4/24/2017 | 4/24/2017 | 4/24/2017 | A | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 4/24/2017 | | 4/24/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 4/24/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 4/24/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/24/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 4/24/2017 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 4/24/2017 | | DONE |
Christina Prado
|
|
|
|
Routing Walk-In (BLD) | 4/11/2017 | 4/11/2017 | 4/11/2017 | A | CANC |
David Ferguson
|
|
|
Answered questions regarding attic trusses on roof.
|
Routing Walk-In (BLD) | 4/5/2017 | 4/5/2017 | 4/11/2017 | P | FAIL |
David Ferguson
|
|
|
Need engineering for tall walls at 12'
|
Routing Walk-In (Zoning) | 3/20/2017 | 3/20/2017 | 3/20/2017 | A | PASS |
Nicolette Womack
|
|
|
3' wide landscaping buffer required along side property line.
|
Routing Walk-In (BLD) | 3/20/2017 | 3/20/2017 | 3/20/2017 | A | FAIL |
Brian McGowan
|
|
|
Need tall wall engineering, truss layout did not work, lateral calculations not ptovided.
|
1st review completed | | | 3/20/2017 | | FAIL |
Brian McGowan
|
|
|
Need tall wall engineering, truss layout did not work, lateral calculations not ptovided.
|
Routing - PLAN CHECK | 3/20/2017 | | 3/20/2017 | | FAIL |
Brian McGowan
|
|
|
Need tall wall engineering, truss layout did not work, lateral calculations not ptovided.
|
Application received | | 3/20/2017 | | | |
|
|
|
|