Permit Information
Permit NumberBLD17-00703
StatusFinaled
Name GUHO CORP
Site Address 521 W BROAD ST
Project NameBoise Brewing Grain Silo
Customer Number 
ePlanReviewYes
Description
(BOISE BREWING GRAIN SILO) (DRH16-00168) To install an approximate 1,885 cubic foot silo having a 12 foot diameter (113 square feet) and about 26 feet tall for malt barley storage to be used in beer brewing. The silo will be located on the public sidewalk at Broad Street next to the Northeast corner of the building and next to the alley per a license agreement with ACHD. The silo will have 6 columns and will be attached to a concrete slab on grade. Work is to include a 168 square foot reinforced concrete slab 12 inches thick. Two Hilti Kwik Bolts embedded 3.25 inches at each column base plate (6 base plates total) will attach the silo columns to the slab. Special Inspection is required for soils, for concrete, for anchors post installed in hardened concrete, and for field welding (if applicable). This grain silo will be used to store grain. It shall not be used for human habitation by employees, by the public, or by anyone else. This is a scope of work permit. This permit is not intended to establish a Certificate of Occupancy for any tenant or for any portion of the building. The work is required to comply with the approved drawings, with all applicable governmental requirements including OSHA regulations, with the plan review report, and with all applicable codes and ordinances. The silo itself is required to be constructed in compliance with an engineered design done in accordance with recognized and generally accepted good engineering practices. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 8/15/20179/18/2017 DONE
This permit finaled on the web by Corinne Guho
Third Notice 7/17/20178/10/2017 DONE
Mailed 8-11-17
Second Notice 6/22/20177/12/2017 DONE
Mailed 7-13-17
First Notice6/8/20176/8/20176/12/2017 DONE
DetailsDave Hannah
Mailed 6-13-17
BLD-Final6/7/20176/8/20176/8/2017APASS
DetailsDave Hannah
Tom Phone #: ###-####
DOC - Permit Finaled6/8/20176/8/20176/8/2017PPASS
DetailsDave Hannah
FIRE-Final Inspection6/6/20176/7/20176/7/2017APASS
DetailsJim Page
Fire department connection is visible/accessable from the street and alley way, final life fire safety inspection passed/complete
BLD-Final6/6/20176/6/20176/7/2017PNR
DetailsDave Hannah
Tom Phone #: ###-####
BLD-Other5/8/20175/8/20175/8/2017PPASS
DetailsDave Hannah
Rebar for late PM - Tom Phone #: ###-####
Inspection Record Card- Bld  4/21/2017 DONE
Issue PAID IN FULL permit  4/21/2017 DONE
Telephone call  4/21/2017 DONE
i called Collin to let him know i put the wrong amount for his valuation and requested a refund thru Rita
Permit Ready to Issue  4/19/2017 DONE
DetailsChristina Prado
***met 4-19-17 CAN***Need ACHD, GC Form & Revised Certificate of Value for issuance
Plan assigned to (CJW)3/28/20173/28/20174/18/2017 PASS
DetailsCarl Westfall
** (Apr 13 - 15 days) (3 sheets) Boise Brewing Grain Silo
Plan assigned to (CDM)3/24/20173/24/20174/18/2017 PASS
DetailsCarl D Madsen
Boise Brewing Silo 4/24
Routing - PLAN CHECK3/24/2017 4/18/2017 PASS
DetailsCarl Westfall
Routing Off Site - STRUCTURAL4/13/2017 4/18/2017 PASS
DetailsCarl Westfall
Jan Welch - Stapley
1st review completed  4/18/2017 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/18/2017 DONE
Routing - FIRE3/24/20173/24/20174/7/2017 PASS
DetailsKatie Marron
Comments attached to case.
Routing Off Site - STRUCTURAL3/24/2017 4/4/2017 FAIL
DetailsCarl Westfall
Jan Welch - Stapley
Routing - Erosion and Sediment3/24/2017 3/28/2017 PASS
DetailsAndy J. Long
Minimal exterior disturbance. No ESC permit required. Project within ACHD ROW on sidewalk
Routing - PLANNING Land Div3/24/2017 3/27/2017 PASS
DetailsTodd Tucker
Routing - Addressing3/24/2017 3/27/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS3/24/2017 3/27/2017 PASS
DetailsMorgan Webb
Routing - Design Review3/24/2017 3/25/2017 PASS
DetailsSarah Schafer
Approve per DRH16-00168.
Intake Approval  3/24/2017 PASS
DetailsAdele J Schaffeld-Griffin
Javier completed Pre Screen
Application received  3/20/2017 DONE
Application submitted via PDS Online on Mar 20 2017 10:41AM
Zoning Approval6/7/20176/7/2017  PASS
DetailsSarah Schafer