BLD-Final | 7/7/2017 | 7/10/2017 | 7/10/2017 | A | PASS |
Jim Storey
|
|
|
call 20 mins ahead for access- Elaina Phone #: ###-####
|
DOC - Permit Finaled | 7/10/2017 | 7/10/2017 | 7/10/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 6/28/2017 | 6/29/2017 | 6/29/2017 | A | FAIL |
Dave Hannah
|
|
|
call 20 min ahead // Elena Berti Phone #: ###-#### needs mec final and hard wire smoke and co2 detectors up stairs
|
Routing Walk-In (BLD) | 5/4/2017 | 5/4/2017 | 5/4/2017 | A | PASS |
Josh Bogle
|
|
|
questions about range hood. Talked about need for HVAC inspection and 400cfm rules. No changes to permit. **JB**
|
BLD-Energy code compliance | 4/3/2017 | 4/4/2017 | 4/4/2017 | A | PASS |
Jim Storey
|
|
|
Elana-please call 20 mintues prior to meet Phone #: ###-####
|
BLD-Framing/Rough-in | 4/3/2017 | 4/4/2017 | 4/4/2017 | A | PASS |
Jim Storey
|
|
|
Elana-please call 20 mintues prior to meet Phone #: ###-####
|
Routing Walk-In (BLD) | 3/20/2017 | 3/20/2017 | 3/20/2017 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 3/20/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 3/20/2017 | | 3/20/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 3/20/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 3/20/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/20/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 3/20/2017 | | DONE |
Christina Prado
|
|
|
All requirements met for issuance
|
Issue PAID IN FULL permit | | | 3/20/2017 | | DONE |
Christina Prado
|
|
|
|
Application received | | 3/20/2017 | | | |
|
|
|
|