First Notice | 7/5/2018 | 7/5/2018 | 9/11/2018 | | DONE |
Tony Young
|
|
|
This permit finaled on the web by Kim Anderson
|
BLD-Aging Inspection | 7/5/2018 | 7/5/2018 | 7/9/2018 | | DONE |
Tony Young
|
|
|
|
BLD-Aging Inspection | 7/4/2018 | 7/4/2018 | 7/5/2018 | | DONE |
Tony Young
|
|
|
|
DOC - Permit Finaled | 7/5/2018 | 7/5/2018 | 7/5/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 4/19/2018 | 4/20/2018 | 4/19/2018 | A | CANC |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kaleb Checketts Inspection cancelled from web by: Kaleb Checketts
|
BLD-Final | 2/16/2018 | 2/20/2018 | 2/20/2018 | A | PASS |
Tony Young
|
|
|
Call Jake Ludwig 1 hour prior to arrival for access to the roof top. ###-#### Inspection requested via web by Kaleb Checketts
|
Issue PAID IN FULL permit | | | 11/8/2017 | | DONE |
|
|
|
|
Telephone call | | | 11/8/2017 | | DONE |
|
|
|
emailed the permit to deejay.ballon@marshcreekllc.com for signature
|
Inspection Record Card- Bld | | | 11/8/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/8/2017 | | DONE |
|
|
|
|
Expiration Notice | 11/7/2017 | 11/30/2017 | 11/7/2017 | | DONE |
Brittany Hill
|
|
|
|
Telephone call | | | 11/6/2017 | | DONE |
|
|
|
Left a message for Mark (###-####) to touch bases with him on this permit being 50 days past the expiration date. Informed that it looks like the permit took a bit longer to go through review and he could send in a request for an extension
|
Plan assigned to (JG) | 8/4/2017 | 8/4/2017 | 10/31/2017 | | PASS |
Javier Guzman
|
|
|
1st rev com, 8/24 L3 Verizon antenna
|
Routing Off Site - STRUCTURAL | 10/24/2017 | | 10/31/2017 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by AHJ Engineers Dave Haugland
|
Routing - PLAN CHECK | 10/31/2017 | | 10/31/2017 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/31/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/31/2017 | | DONE |
|
|
|
Met 11-8-17
Need
GC Form
Revised Cert Value
|
Routing - PLAN CHECK | 10/24/2017 | | 10/30/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing - Design Review | 10/24/2017 | | 10/24/2017 | | PASS |
Andrea Tuning
|
|
|
|
Route to Impact Fee Review | 8/25/2017 | 8/28/2017 | 8/27/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 8/25/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 8/4/2017 | | 8/25/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLANNING | 8/4/2017 | | 8/22/2017 | | PASS |
Susan Riggs
|
|
|
Signed off in ePlan by Current Planning Susan Riggs
|
Routing Off Site - STRUCTURAL | 8/4/2017 | | 8/22/2017 | | FAIL |
Javier Guzman
|
|
|
failed in ePlan by AHJ Engineers Dave Haugland
|
Routing - FIRE | 8/4/2017 | 8/4/2017 | 8/11/2017 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Routing - Design Review | 8/4/2017 | | 8/7/2017 | | FAIL |
Andrea Tuning
|
|
|
Project has not applied for or received DR approval.
|
Intake Approval | | | 8/4/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing - PUBLIC WORKS | 8/4/2017 | | 8/4/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 8/4/2017 | | 8/4/2017 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 8/1/2017 | | FAIL |
Julie Romig
|
|
|
1. Completed 518 Submittal Checklist with any additional information as required.
2. Completed Form 304 Registered Design Professional for engineer.
3. Stamp/signature on sheet S1.0 - signature image is missing.
|
Plan Reviewer's activity | | | 8/1/2017 | | DONE |
|
|
|
Spoke with Mark Kimber and went over the additional information that is required before we can accept the application.
|
Intake Approval | | | 7/19/2017 | | FAIL |
Julie Romig
|
|
|
Need: 1. Completed 518 Submittal Checklist with any additional information as required.
2. Completed Form 304 Registered Design Professional for engineer.
3. Stamp/signature on sheet S1.0 - signature image is missing.
4. Rename sheets per City of Boise naming convention - Sheet number and brief description (ex T100_Title). Drawing sheets have been deleted so renamed sheets can be uploaded.
|
Intake Approval | | | 7/7/2017 | | FAIL |
Julie Romig
|
|
|
Need: 1. Completed 518 Submittal Checklist with any additional information as required.
2. Completed Form 304 Registered Design Professional for engineer.
3. Stamp/signature on sheet S1.0 - signature image is missing.
|
Application received | | | 3/20/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 20 2017 4:24PM
|