BLD-Final | 8/28/2017 | 8/28/2017 | 8/28/2017 | P | PASS |
Jim Sly
|
|
|
Colby Phone #: ###-####
|
DOC - Permit Finaled | 8/28/2017 | 8/28/2017 | 8/28/2017 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 7/21/2017 | 7/24/2017 | 7/24/2017 | A | PASS |
Mike Jordan
|
|
|
Colby Phone #: ###-####
|
BLD-Framing/Rough-in | 7/18/2017 | 7/19/2017 | 7/20/2017 | P | PASS |
Jim Sly
|
|
|
Colby Phone #: ###-####
|
BLD-Wall Bracing | 7/6/2017 | 7/7/2017 | 7/7/2017 | P | PASS |
Jim Sly
|
|
|
Colby Phone #: ###-####
|
BLD-Footing | 4/10/2017 | 4/11/2017 | 4/11/2017 | P | PASS |
Jim Sly
|
|
|
Dane Phone #: ###-####
|
OVERRIDE | | | 4/5/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 3/22/2017 | 3/22/2017 | 4/5/2017 | | DONE |
Brian McGowan
|
|
|
Due 4-3 ePlan - FAIL- Wall bracing does not meet prescriptive methods. Point loads do not have spread footings sized for them.
|
Routing - PLAN CHECK | 4/5/2017 | | 4/5/2017 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/5/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 4/5/2017 | | DONE |
|
|
|
all requirements met
|
Issue PAID IN FULL permit | | | 4/5/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/5/2017 | | DONE |
|
|
|
|
1st review completed | | | 4/3/2017 | | FAIL |
Brian McGowan
|
|
|
Wall bracing does not meet prescriptive methods. Point loads do not have spread footings sized for them.
|
Routing - PLAN CHECK | 3/21/2017 | | 4/3/2017 | | FAIL |
Brian McGowan
|
|
|
Wall bracing does not meet prescriptive methods. Point loads do not have spread footings sized for them.
|
Routing - MECHANICAL | 3/21/2017 | | 3/28/2017 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 3/21/2017 | 3/24/2017 | 3/22/2017 | | PASS |
Tonya Wallace
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plan assigned to (LEG) Tisha | 3/21/2017 | | 3/22/2017 | | DEFR |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/21/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 3/21/2017 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/21/2017 | | DONE |
Christina Prado
|
|
|
|
Routing - PLANNING | 3/21/2017 | | 3/21/2017 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 3/21/2017 | | 3/21/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 3/21/2017 | | 3/21/2017 | | PASS |
Morgan Webb
|
|
|
|
Application received | | | 3/20/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 20 2017 4:46PM
|