Permit Information
Permit NumberBLD17-00722
StatusFinaled
Name PAUL MCNABB
Site Address 1505 S FIVE MILE RD
Project NameMcNabbs Tattoo & Fine Art
Customer Number 
ePlanReviewNo
Description
(MCNABB’S TATTOO & FINE ART) (4-27-17 PLAN MODIFICATION TO NOT CONSTRUCT A FULL HEIGHT SCREEN WALL THAT WAS ORIGINALLY PROPOSED TO BE CONSTRUCTED IN THE RECEPTION AREA.) The fire sprinkler system is used for building area increase. To remodel an existing 1,210 square foot tenant space for a new tattoo and fine art tenant. The existing toilet room is required to be maintained accessible to the disabled as defined by the 1997 UBC. Work is to include cutting down some existing walls to be 4’-6” tall, constructing some 4’-6” tall walls, constructing full height walls between existing full height columns, and constructing a full height wall at the reception area. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 (including sprinkler patterns) as regulated by the Fire Department. A separate fire sprinkler permit shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  2/27/2018 DONE
couldn't get a hold of GC-his place of business is vacant so sent letter for 3rd notice (final values) to Paul McNabb
Telephone call  2/22/2018 DONE
called and emailed that we need current mailing address-the one we have on file comes back from post office saying it's vacant
Third Notice 12/17/20172/12/2018 DONE
Third Notice 11/19/201712/12/2017 DONE
DetailsBrittany Hill
Mailed 12-13-17
Third Notice 10/17/201711/14/2017 DONE
Mailed 11-15-17
Third Notice 9/25/201710/12/2017 DONE
Mailed 10-13-17
Second Notice 8/20/20179/20/2017 DONE
First Notice 7/16/20178/10/2017 DONE
Mailed 8-11-17
Print Occupancy Form  7/6/2017 DONE
Permanent Occupancy  7/6/2017 DONE
FIRE-Final Inspection6/28/20176/29/20176/29/2017PPASS
DetailsTroy Cobbley
life safety passed
BLD-Final6/19/20176/19/20176/19/2017PPASS
DetailsMike Jordan
Call 20 mins before // Paul Phone #: ###-####. Sprinkler modification completed and passed.
BLD-Final6/1/20176/2/20176/2/2017PPASS
DetailsMike Jordan
Paul Phone #: ###-####. Ok for temp oc. will be ok for perm occ. once fire signs perm.
FIRE-Final Inspection6/1/20176/2/20176/2/2017APART
DetailsTroy Cobbley
Temp for life safety until the fire sprinkler modifications have been complete
FIRE-Final Inspection5/24/20175/24/20175/24/2017PFAIL
DetailsTroy Cobbley
Provide annual inspection of the sprinkler system verification. provide sprinkler modifications for the sprinkler pendants that are too close, repair the exit sign/emergency lights, mount the fire extinguisher
Telephone call  5/12/2017 DONE
called Paul to let know plan mod permit is ready and when can they come pick it up? he will be in
CHANGE STATUS TO (ISS)  5/12/2017 DONE
DetailsChristina Prado
(F) Reprint permit  5/12/2017 DONE
DetailsChristina Prado
Plan assigned to (CJW)4/24/20174/24/20174/27/2017 PASS
DetailsCarl Westfall
****
Routing - PLAN CHECK4/24/2017 4/27/2017 PASS
DetailsCarl Westfall
Plan Reviewer's activity  4/27/2017 DONE
Processed and approved the plan mod
Permit Ready to Issue  4/27/2017 DONE
please do not re issue
Print Occupancy Form  4/27/2017 DONE
Telephone call  4/27/2017 DONE
called GC left message on phone that the plan mod is ready also called Paul McNabb to let know plan mod is ready
BLD-Framing/Rough-in4/24/20174/25/20174/25/2017APASS
DetailsMike Jordan
Please call ahead for access, early morning is better - Paul Phone #: ###-####. Interior steel stud framed walls ok.
Plan Modification Accepted  4/24/2017 DONE
DetailsChristina Prado
Plan mod to removed proposed wall within reception area previously approved, two full floor plans resubmitted
Issue PAID IN FULL permit  4/7/2017 DONE
Print Occupancy Form  4/7/2017 DONE
Route to Impact Fee Review3/25/20173/28/20173/27/2017 PASS
DetailsTonya Wallace
Review requested for Commercial Permit
Print Occupancy Form  3/27/2017 DONE
Permit Ready to Issue  3/27/2017 DONE
***MET 4-7-17 CAN***need GC and rev cert of val
Telephone call  3/27/2017 DONE
Spoke with Paul informing him that this permit is ready and that we need the 302 and 306 forms filled out by the GC so that we can put the finally fees in
Plan assigned to (CJW)3/21/20173/21/20173/25/2017 PASS
DetailsCarl Westfall
* (Mar 23 - 3 days) (paper) McNabbs Tattoo
Routing - PLAN CHECK3/21/2017 3/25/2017 PASS
DetailsCarl Westfall
1st review completed  3/25/2017 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/25/2017 DONE
Plans ACCEPTED BY PLAN TECH  3/21/2017 DONE
Intake Approval  3/21/2017 PASS
DetailsCarl Westfall
Recd Pcfee & Taken To Pln CK  3/21/2017 DONE
Routing - Addressing3/21/2017 3/21/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS  3/21/2017 PASS
Application received 3/21/2017