Meeting | | | 5/11/2018 | | DONE |
|
|
|
sent statement 5-14
|
Print Statement | | | 3/29/2018 | | DONE |
|
|
|
|
Second Notice | | 2/22/2018 | 3/14/2018 | | DONE |
|
|
|
Mailed 3-16-18
|
First Notice | | 2/4/2018 | 2/12/2018 | | DONE |
|
|
|
Mailed 2-13-18
|
PubWorks Occupancy Approval | 1/25/2018 | 1/25/2018 | 1/25/2018 | | DONE |
Tiffany Lowery
|
|
|
|
Permanent Occupancy | | | 1/25/2018 | | DONE |
Christina Prado
|
|
|
|
Zoning Approval | 12/26/2017 | 12/26/2017 | 12/26/2017 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 12/11/2017 | 12/12/2017 | 12/12/2017 | A | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Ok for temp. occ. Will be ok for perm occ. once zoning/public works and electrical signs perm.
|
Temporary Occupancy | 12/12/2017 | 3/12/2018 | 12/12/2017 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 12/8/2017 | 12/8/2017 | 12/8/2017 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
Mike Phone #: ###-####
|
PubWorks Occupancy Approval | 12/8/2017 | 12/8/2017 | 12/8/2017 | | DONE |
Jason C. Taylor
|
|
|
Project has bonded for temprary occupancy for Drainage- JCT
|
FIRE-Final Inspection | 12/6/2017 | 12/7/2017 | 12/7/2017 | P | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to sign off when the project fire alarm and fire sprinkler permits are finaled
MIke Phone #: ###-####
|
Zoning Approval Temp | 12/7/2017 | 12/7/2017 | 12/7/2017 | | DONE |
Andrea Tuning
|
|
|
A bond has been posted for landscaping, site lighting and bicycle parking.
|
BLD-Ceiling Grid Inspection | 11/28/2017 | 11/29/2017 | 11/29/2017 | A | DONE |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Contractor provided documentation for wood ceiling smoke and flame spread values. Currently, this will not meet a lass C rating. Documentation provided for and intumescent fire retatrdent varnish to meet ASTM E-84. Falme Control No.166 wil be used to coat the wood ceiling.
|
BLD-Ceiling Grid Inspection | 11/20/2017 | 11/21/2017 | 11/21/2017 | P | PASS |
Mike Jordan
|
|
|
###-####- Mike.
|
CHANGE STATUS TO (ISS) | | | 11/21/2017 | | DONE |
|
|
|
|
Plan assigned to (JG) | 10/17/2017 | 10/17/2017 | 10/24/2017 | | PASS |
Jarom Gray
|
|
|
Plan Mod #3 LongHorn Steakhouse, pend plumb
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/24/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/24/2017 | | DONE |
|
|
|
PLAN MOD DO NOT REISSUE
Fees Due
|
Routing - PLUMBING | 10/19/2017 | | 10/23/2017 | | PASS |
Bill VanDegrift
|
|
|
ASSE 1070 mixing valves required at public lavs.
|
Routing - PLAN CHECK | 10/19/2017 | | 10/19/2017 | | PASS |
Javier Guzman
|
|
|
|
Plan Modification Accepted | | | 10/17/2017 | | DONE |
Christina Prado
|
|
|
Plan Mod #3 - replace bar sink with glass washer, revise drain boards, add dump sink to bar, relocate hand sink and associated PLM & ELE
|
BLD-Energy code compliance | 10/13/2017 | 10/16/2017 | 10/16/2017 | A | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Energy complete. ok to cover.
|
BLD-Energy code compliance | 10/6/2017 | 10/9/2017 | 10/9/2017 | A | PART |
Mike Jordan
|
|
|
Mike Phone #: ###-####. South and east exterior walls ok.
|
BLD-Framing/Rough-in | 10/9/2017 | 10/9/2017 | 10/9/2017 | A | PART |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Wood framed walls and hardlids for restroom ok.
|
BLD-Framing/Rough-in | 10/5/2017 | 10/6/2017 | 10/6/2017 | A | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Main entry and bar area.
|
BLD-Energy code compliance | 10/6/2017 | 10/6/2017 | 10/6/2017 | A | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####. West exterior wall.
|
BLD-Framing/Rough-in | 9/28/2017 | 9/29/2017 | 9/29/2017 | A | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Double top plate splice and additional studs added in overbuild. Trusses, lateral bracing and additional bracing on botom chords, all related hardware and bracing ok.
|
BLD-Wall Bracing | 9/29/2017 | 9/29/2017 | 9/29/2017 | A | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####. North exterior shear wall ok.
|
BLD-Framing/Rough-in | 9/15/2017 | 9/18/2017 | 9/18/2017 | A | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Exterior furred walls ok.
|
BLD-Wall Bracing | 9/18/2017 | 9/18/2017 | 9/18/2017 | A | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####. South, east and west exterior shear walls ok.
|
BLD-Framing/Rough-in | 9/12/2017 | 9/12/2017 | 9/12/2017 | P | PART |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Remainder of overbuild. Needs to provide strap and double top plate splice and provide 2 additional studs under double LVL.
|
FIRE-Conference | 9/7/2017 | 9/8/2017 | 9/8/2017 | A | DONE |
Troy Cobbley
|
|
|
Mike and I discussed combustible concealed spaces.
Phone #: ###-####
|
BLD-Framing/Rough-in | 9/5/2017 | 9/6/2017 | 9/6/2017 | A | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Roof diaphragm nailing ok. Parapet and over builds ok.
|
BLD-Foundation | 8/14/2017 | 8/15/2017 | 8/15/2017 | A | PASS |
Mike Jordan
|
|
|
Pour at 11 /// Mike Phone #: ###-####. CMU pilasters for hip roof ok.
|
Plan assigned to (JG) | 8/3/2017 | 8/3/2017 | 8/8/2017 | | PASS |
Javier Guzman
|
|
|
Plan mod LongHorn Steakhouse
|
Routing - PLAN CHECK | 8/3/2017 | | 8/8/2017 | | PASS |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 8/8/2017 | | DONE |
|
|
|
plan mod. DO NOT REISSUE; all requirements met, fees due
|
CHANGE STATUS TO (ISS) | | | 8/8/2017 | | DONE |
|
|
|
sent plan mod permit to be signed
|
(F) Reprint permit | | | 8/8/2017 | | DONE |
|
|
|
|
Routing - PLUMBING | 8/4/2017 | | 8/7/2017 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Design Review | 8/4/2017 | | 8/4/2017 | | PASS |
Andrea Tuning
|
|
|
|
Routing - MECHANICAL | 8/4/2017 | | 8/4/2017 | | PASS |
Troy James
|
|
|
1 hour review time
|
Plan Modification Accepted | | | 8/3/2017 | | DONE |
Christina Prado
|
|
|
Plan Modification to revise the bar layout, including plumbing, electrical & drain locations. Revise landscape lighing and add "to go" parking spacing back in
|
BLD-Foundation | 7/14/2017 | 7/17/2017 | 7/17/2017 | A | PART |
Mike Jordan
|
|
|
Pour 11 // Mike Phone #: ###-####. Work in progress on cmu stemwall, permiter walls from top of footing to finish floor. Will have special inspection.
|
(F) Reprint permit | | | 7/13/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/12/2017 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (JG) | 7/5/2017 | 7/5/2017 | 7/11/2017 | | PASS |
Javier Guzman
|
|
|
Plan mod LongHorn Steakhouse
|
Routing - PLAN CHECK | 7/5/2017 | | 7/11/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing - Design Review | 7/6/2017 | | 7/11/2017 | | PASS |
Andrea Tuning
|
|
|
signed off in ePlan by DR Andrea Tuning
|
Permit Ready to Issue | | | 7/11/2017 | | DONE |
|
|
|
Do NOT reissue PLAN MOD
**DEMO PERMIT HASN'T HAD A FINAL**
|
BLD-Footing | 7/6/2017 | 7/7/2017 | 7/7/2017 | A | PART |
Brandon Shaw
|
|
|
Building foot print and columns, garbage /recyling bin area at later time
|
Routing - Design Review | 7/6/2017 | | 7/6/2017 | | PASS |
Andrea Tuning
|
|
|
|
Routing - MECHANICAL | 7/6/2017 | | 7/6/2017 | | PASS |
Troy James
|
|
|
|
Plan Modification Accepted | | | 7/5/2017 | | DONE |
Christina Prado
|
|
|
Plan Mod to remove external roof ladder and replace with internal roof ladder & hatch. Light fixture shifted for internal roof ladder
|
Issue PAID IN FULL permit | | | 6/28/2017 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 6/28/2017 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (JG) | 4/3/2017 | 4/3/2017 | 6/21/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 4/21 Longhorn Steakhouse ePlan, pend eng
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/21/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/21/2017 | | DONE |
Christina Prado
|
|
|
All met 6/22/17 C_P //// need GC & rev cert of val
|
Routing Off Site - STRUCTURAL | 6/14/2017 | | 6/21/2017 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by Stapley Engineering Jan Welch
|
Routing - PLAN CHECK | 6/14/2017 | | 6/16/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing - Design Review | 6/16/2017 | | 6/16/2017 | | PASS |
Andrea Tuning
|
|
|
|
Routing - Design Review | 6/14/2017 | | 6/14/2017 | | FAIL |
Andrea Tuning
|
|
|
Remove the parking from within the side yard setback along the east property line.
|
Routing PW Street Lights | 6/14/2017 | | 6/14/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing Off Site - STRUCTURAL | 5/23/2017 | | 6/1/2017 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by Stapley Engineering Jan Welch
|
Routing - PLAN CHECK | 5/23/2017 | | 5/27/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 5/23/2017 | | 5/23/2017 | | PASS |
Troy James
|
|
|
|
Routing PW Solid Waste | 5/23/2017 | | 5/23/2017 | | PASS |
Evan Carpenter
|
|
|
Solid waste is OK as planned.
|
Routing - Design Review | 5/23/2017 | | 5/23/2017 | | FAIL |
Andrea Tuning
|
|
|
Parking within setbacks.
Pole lighting within landscape planters.
Remove "to go" signage.
Trash enclosure should be CMU painted to match the building.
|
Route to Impact Fee Review | 5/1/2017 | 5/4/2017 | 5/2/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 5/1/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing Off Site - C.D.H | 4/3/2017 | | 5/1/2017 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by Central District Health Department Brent Copes
|
Routing - PLAN CHECK | 4/3/2017 | | 4/27/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 4/3/2017 | | 4/24/2017 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by Stapley Engineering Jan Welch
|
Routing PW Drainage | 4/3/2017 | | 4/20/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing - MECHANICAL | 4/3/2017 | | 4/6/2017 | | FAIL |
Troy James
|
|
|
|
Routing - PLUMBING | 4/3/2017 | | 4/5/2017 | | PASS |
Bill VanDegrift
|
|
|
Install RPBP on filtered water system
|
Routing - Erosion and Sediment | 4/3/2017 | | 4/5/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Site preparation/pre-construction inspection required. Need to designate valid RP for project.
|
Routing - FIRE | 4/3/2017 | 4/3/2017 | 4/4/2017 | | PASS |
Katie Marron
|
|
|
comments attached to case.
|
Routing PW Solid Waste | 4/3/2017 | | 4/4/2017 | | FAIL |
Evan Carpenter
|
|
|
The solid waste enclosure must have at least 18 ft of unobstructed clearance between outer gate posts; suggest removal of center partition.
|
Routing PW Street Lights | 4/3/2017 | | 4/4/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing - PLANNING | 4/3/2017 | | 4/4/2017 | | PASS |
Cody Riddle
|
|
|
No review required. Approved by DRH17-00036.
|
Routing - PLANNING Land Div | 4/3/2017 | | 4/4/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 4/3/2017 | | 4/3/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 4/3/2017 | | 4/3/2017 | | PASS |
Rachael Beierle
|
|
|
WEST BOISE SEWER DISTRICT
|
Intake Approval | | | 4/3/2017 | | PASS |
|
|
|
|
Routing - Design Review | 4/3/2017 | | 4/3/2017 | | FAIL |
Andrea Tuning
|
|
|
Failed. Plans do not match (Site, Landscape, Grading, Utility, etc). Install thre required street trees within the landscape planters and along I-84. Trash enclosure is required to be CMU. Driev aisles are required to be 22-feet wide.
|
Plan Reviewer's activity | | | 3/30/2017 | | DONE |
|
|
|
Plan intake review approved
|
Intake Approval | | | 3/22/2017 | | FAIL |
Carl Westfall
|
|
|
(3-22-17) Please see the circled items in the Plan Intake Checklist. Please resolve each item as noted.
|
Application received | | | 3/21/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 21 2017 2:35PM
|