Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD17-00729
StatusFinaled
Name STEED CONSTRUCTION
Site Address 7997 W FRANKLIN RD
Project NameLongHorn Steakhouse
Customer NumberBLD17-01979 FOR DEMO
ePlanReviewYes
Description
(LONGHORN STEAKHOUSE) //Plan modification #3 to replace bar sink with a bar washer, revise the quantity of drain boards, add a dump sink to the bar area, relocate the hand sink in the bar, and associated plumbing/electrical revisions. 10-18-2017 JG// - //Plan Modification #2 – to add to go parking spaces, revised bar layout, and plumbing/mechanical/electrical modifications. 8-4-2017 JG// - //Plan modification to remove external roof ladder and replace with an internal roof ladder with a roof hatch, light fixture and mechanical ductwork relocated for new ladder location. 7-6-2017 JG// Permit to construct a new 5,593 sq., ft. assembly restaurant building and related site improvements. Scope of work includes: construction of footing foundation, slab on grade concrete floor, construction of wood stud framed exterior envelope walls, truss roof construction, construction of interior non-bearing walls to create lobby area, dining areas, bar area, commercial kitchen, walk-in cooler, office, mechanical room, storage closets and men’s and woman’s restrooms accessible to the disabled, new windows and accessible doors, new electrical, new mechanical, new plumbing, site work, and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Note: Special Inspections Required see form 310. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Meeting  5/11/2018 DONE
sent statement 5-14
Print Statement  3/29/2018 DONE
Second Notice 2/22/20183/14/2018 DONE
Mailed 3-16-18
First Notice 2/4/20182/12/2018 DONE
Mailed 2-13-18
PubWorks Occupancy Approval1/25/20181/25/20181/25/2018 DONE
DetailsTiffany Lowery
Permanent Occupancy  1/25/2018 DONE
DetailsChristina Prado
Zoning Approval12/26/201712/26/201712/26/2017 DONE
DetailsAndrea Tuning
BLD-Final12/11/201712/12/201712/12/2017APASS
DetailsMike Jordan
Mike Phone #: ###-####. Ok for temp. occ. Will be ok for perm occ. once zoning/public works and electrical signs perm.
Temporary Occupancy12/12/20173/12/201812/12/2017 DONE
DetailsChristina Prado
FIRE-Final Inspection12/8/201712/8/201712/8/2017PPASS
DetailsTroy Cobbley
Life safety passed

Mike Phone #: ###-####
PubWorks Occupancy Approval12/8/201712/8/201712/8/2017 DONE
DetailsJason C. Taylor
Project has bonded for temprary occupancy for Drainage- JCT
FIRE-Final Inspection12/6/201712/7/201712/7/2017PFAIL
DetailsTroy Cobbley
Life safety will be ok to sign off when the project fire alarm and fire sprinkler permits are finaled

MIke Phone #: ###-####
Zoning Approval Temp12/7/201712/7/201712/7/2017 DONE
DetailsAndrea Tuning
A bond has been posted for landscaping, site lighting and bicycle parking.
BLD-Ceiling Grid Inspection11/28/201711/29/201711/29/2017ADONE
DetailsMike Jordan
Mike Phone #: ###-####. Contractor provided documentation for wood ceiling smoke and flame spread values. Currently, this will not meet a lass C rating. Documentation provided for and intumescent fire retatrdent varnish to meet ASTM E-84. Falme Control No.166 wil be used to coat the wood ceiling.
BLD-Ceiling Grid Inspection11/20/201711/21/201711/21/2017PPASS
DetailsMike Jordan
###-####- Mike.
CHANGE STATUS TO (ISS)  11/21/2017 DONE
Plan assigned to (JG)10/17/201710/17/201710/24/2017 PASS
DetailsJarom Gray
Plan Mod #3 LongHorn Steakhouse, pend plumb
PLANS/APPL TAKEN TO FRONT DESK  10/24/2017 DONE
Permit Ready to Issue  10/24/2017 DONE
PLAN MOD DO NOT REISSUE
Fees Due
Routing - PLUMBING10/19/2017 10/23/2017 PASS
DetailsBill VanDegrift
ASSE 1070 mixing valves required at public lavs.
Routing - PLAN CHECK10/19/2017 10/19/2017 PASS
DetailsJavier Guzman
Plan Modification Accepted  10/17/2017 DONE
DetailsChristina Prado
Plan Mod #3 - replace bar sink with glass washer, revise drain boards, add dump sink to bar, relocate hand sink and associated PLM & ELE
BLD-Energy code compliance10/13/201710/16/201710/16/2017APASS
DetailsMike Jordan
Mike Phone #: ###-####. Energy complete. ok to cover.
BLD-Energy code compliance10/6/201710/9/201710/9/2017APART
DetailsMike Jordan
Mike Phone #: ###-####. South and east exterior walls ok.
BLD-Framing/Rough-in10/9/201710/9/201710/9/2017APART
DetailsMike Jordan
Mike Phone #: ###-####. Wood framed walls and hardlids for restroom ok.
BLD-Framing/Rough-in10/5/201710/6/201710/6/2017APASS
DetailsMike Jordan
Mike Phone #: ###-####. Main entry and bar area.
BLD-Energy code compliance10/6/201710/6/201710/6/2017APASS
DetailsMike Jordan
Mike Phone #: ###-####. West exterior wall.
BLD-Framing/Rough-in9/28/20179/29/20179/29/2017APASS
DetailsMike Jordan
Mike Phone #: ###-####. Double top plate splice and additional studs added in overbuild. Trusses, lateral bracing and additional bracing on botom chords, all related hardware and bracing ok.
BLD-Wall Bracing9/29/20179/29/20179/29/2017APASS
DetailsMike Jordan
Mike Phone #: ###-####. North exterior shear wall ok.
BLD-Framing/Rough-in9/15/20179/18/20179/18/2017APASS
DetailsMike Jordan
Mike Phone #: ###-####. Exterior furred walls ok.
BLD-Wall Bracing9/18/20179/18/20179/18/2017APASS
DetailsMike Jordan
Mike Phone #: ###-####. South, east and west exterior shear walls ok.
BLD-Framing/Rough-in9/12/20179/12/20179/12/2017PPART
DetailsMike Jordan
Mike Phone #: ###-####. Remainder of overbuild. Needs to provide strap and double top plate splice and provide 2 additional studs under double LVL.
FIRE-Conference9/7/20179/8/20179/8/2017ADONE
DetailsTroy Cobbley
Mike and I discussed combustible concealed spaces.

Phone #: ###-####
BLD-Framing/Rough-in9/5/20179/6/20179/6/2017APASS
DetailsMike Jordan
Mike Phone #: ###-####. Roof diaphragm nailing ok. Parapet and over builds ok.
BLD-Foundation8/14/20178/15/20178/15/2017APASS
DetailsMike Jordan
Pour at 11 /// Mike Phone #: ###-####. CMU pilasters for hip roof ok.
Plan assigned to (JG)8/3/20178/3/20178/8/2017 PASS
DetailsJavier Guzman
Plan mod LongHorn Steakhouse
Routing - PLAN CHECK8/3/2017 8/8/2017 PASS
DetailsJavier Guzman
Permit Ready to Issue  8/8/2017 DONE
plan mod. DO NOT REISSUE; all requirements met, fees due
CHANGE STATUS TO (ISS)  8/8/2017 DONE
sent plan mod permit to be signed
(F) Reprint permit  8/8/2017 DONE
Routing - PLUMBING8/4/2017 8/7/2017 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - Design Review8/4/2017 8/4/2017 PASS
DetailsAndrea Tuning
Routing - MECHANICAL8/4/2017 8/4/2017 PASS
DetailsTroy James
1 hour review time
Plan Modification Accepted  8/3/2017 DONE
DetailsChristina Prado
Plan Modification to revise the bar layout, including plumbing, electrical & drain locations. Revise landscape lighing and add "to go" parking spacing back in
BLD-Foundation7/14/20177/17/20177/17/2017APART
DetailsMike Jordan
Pour 11 // Mike Phone #: ###-####. Work in progress on cmu stemwall, permiter walls from top of footing to finish floor. Will have special inspection.
(F) Reprint permit  7/13/2017 DONE
CHANGE STATUS TO (ISS)  7/12/2017 DONE
DetailsChristina Prado
Plan assigned to (JG)7/5/20177/5/20177/11/2017 PASS
DetailsJavier Guzman
Plan mod LongHorn Steakhouse
Routing - PLAN CHECK7/5/2017 7/11/2017 PASS
DetailsJavier Guzman
Routing - Design Review7/6/2017 7/11/2017 PASS
DetailsAndrea Tuning
signed off in ePlan by DR Andrea Tuning
Permit Ready to Issue  7/11/2017 DONE
Do NOT reissue PLAN MOD
**DEMO PERMIT HASN'T HAD A FINAL**
BLD-Footing7/6/20177/7/20177/7/2017APART
DetailsBrandon Shaw
Building foot print and columns, garbage
/recyling bin area at later time
Routing - Design Review7/6/2017 7/6/2017 PASS
DetailsAndrea Tuning
Routing - MECHANICAL7/6/2017 7/6/2017 PASS
DetailsTroy James
Plan Modification Accepted  7/5/2017 DONE
DetailsChristina Prado
Plan Mod to remove external roof ladder and replace with internal roof ladder & hatch. Light fixture shifted for internal roof ladder
Issue PAID IN FULL permit  6/28/2017 DONE
DetailsChristina Prado
Print Occupancy Form  6/28/2017 DONE
DetailsChristina Prado
Plan assigned to (JG)4/3/20174/3/20176/21/2017 PASS
DetailsJavier Guzman
1st rev comp, 4/21 Longhorn Steakhouse ePlan, pend eng
PLANS/APPL TAKEN TO FRONT DESK  6/21/2017 DONE
Permit Ready to Issue  6/21/2017 DONE
DetailsChristina Prado
All met 6/22/17 C_P //// need GC & rev cert of val
Routing Off Site - STRUCTURAL6/14/2017 6/21/2017 PASS
DetailsJavier Guzman
signed off in ePlan by Stapley Engineering Jan Welch
Routing - PLAN CHECK6/14/2017 6/16/2017 PASS
DetailsJavier Guzman
Routing - Design Review6/16/2017 6/16/2017 PASS
DetailsAndrea Tuning
Routing - Design Review6/14/2017 6/14/2017 FAIL
DetailsAndrea Tuning
Remove the parking from within the side yard setback along the east property line.
Routing PW Street Lights6/14/2017 6/14/2017 PASS
DetailsTom Marshall
Routing Off Site - STRUCTURAL5/23/2017 6/1/2017 FAIL
DetailsJavier Guzman
Failed in ePlan by Stapley Engineering Jan Welch
Routing - PLAN CHECK5/23/2017 5/27/2017 PASS
DetailsJavier Guzman
Routing - MECHANICAL5/23/2017 5/23/2017 PASS
DetailsTroy James
Routing PW Solid Waste5/23/2017 5/23/2017 PASS
DetailsEvan Carpenter
Solid waste is OK as planned.
Routing - Design Review5/23/2017 5/23/2017 FAIL
DetailsAndrea Tuning
Parking within setbacks.
Pole lighting within landscape planters.
Remove "to go" signage.
Trash enclosure should be CMU painted to match the building.
Route to Impact Fee Review5/1/20175/4/20175/2/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  5/1/2017 FAIL
DetailsJavier Guzman
Routing Off Site - C.D.H4/3/2017 5/1/2017 PASS
DetailsJavier Guzman
signed off in ePlan by Central District Health Department Brent Copes
Routing - PLAN CHECK4/3/2017 4/27/2017 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL4/3/2017 4/24/2017 FAIL
DetailsJavier Guzman
Failed in ePlan by Stapley Engineering Jan Welch
Routing PW Drainage4/3/2017 4/20/2017 PASS
DetailsBrian Murphy
Routing - MECHANICAL4/3/2017 4/6/2017 FAIL
DetailsTroy James
Routing - PLUMBING4/3/2017 4/5/2017 PASS
DetailsBill VanDegrift
Install RPBP on filtered water system
Routing - Erosion and Sediment4/3/2017 4/5/2017 PASS
DetailsAndy J. Long
ESC plan approved. Site preparation/pre-construction inspection required. Need to designate valid RP for project.
Routing - FIRE4/3/20174/3/20174/4/2017 PASS
DetailsKatie Marron
comments attached to case.
Routing PW Solid Waste4/3/2017 4/4/2017 FAIL
DetailsEvan Carpenter
The solid waste enclosure must have at least 18 ft of unobstructed clearance between outer gate posts; suggest removal of center partition.
Routing PW Street Lights4/3/2017 4/4/2017 PASS
DetailsTom Marshall
Routing - PLANNING4/3/2017 4/4/2017 PASS
DetailsCody Riddle
No review required. Approved by DRH17-00036.
Routing - PLANNING Land Div4/3/2017 4/4/2017 PASS
DetailsTodd Tucker
Routing - Addressing4/3/2017 4/3/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS4/3/2017 4/3/2017 PASS
DetailsRachael Beierle
WEST BOISE SEWER DISTRICT
Intake Approval  4/3/2017 PASS
Routing - Design Review4/3/2017 4/3/2017 FAIL
DetailsAndrea Tuning
Failed. Plans do not match (Site, Landscape, Grading, Utility, etc). Install thre required street trees within the landscape planters and along I-84. Trash enclosure is required to be CMU. Driev aisles are required to be 22-feet wide.
Plan Reviewer's activity  3/30/2017 DONE
Plan intake review approved
Intake Approval  3/22/2017 FAIL
DetailsCarl Westfall
(3-22-17) Please see the circled items in the Plan Intake Checklist. Please resolve each item as noted.
Application received  3/21/2017 DONE
Application submitted via PDS Online on Mar 21 2017 2:35PM