BLD-Final | 10/31/2017 | 11/1/2017 | 11/1/2017 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by William Casch
|
DOC - Permit Finaled | 11/1/2017 | 11/1/2017 | 11/1/2017 | P | PASS |
Jim Sly
|
|
|
|
BLD-Conference | 6/13/2017 | 6/14/2017 | 6/14/2017 | A | PASS |
Jim Sly
|
|
|
Roger Phone #: ###-#### Exterior shear nailing.....OK.
|
BLD-Conference | 5/22/2017 | 5/24/2017 | 5/24/2017 | A | DONE |
Jim Sly
|
|
|
Framing inspection and portal header question. Phone #: ###-#### Inspection requested via web by William Casch
|
BLD-Footing | 4/20/2017 | 4/20/2017 | 4/20/2017 | P | PASS |
Jim Sly
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 4/18/2017 | 4/18/2017 | 4/18/2017 | P | PEND |
Jim Sly
|
|
|
Matt....###-####
|
BLD-Footing | 4/17/2017 | 4/18/2017 | 4/18/2017 | A | PEND |
Jim Sly
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 4/14/2017 | 4/17/2017 | 4/17/2017 | A | PART |
Mike Jordan
|
|
|
Matt Phone #: ###-####. Work in progress on installing reinforcement.
|
Telephone call | | | 4/7/2017 | | DONE |
David Ferguson
|
|
|
Had conversation with William (Roger) who stated that he will NOT be providing heat to the shop and will not be installing insulation in the slab.
|
OVERRIDE | | | 3/29/2017 | | |
|
|
|
|
Plan assigned to (DAF) | 3/29/2017 | 3/29/2017 | 3/29/2017 | | DONE |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 3/29/2017 | | 3/29/2017 | | PASS |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 3/29/2017 | | DONE |
David Ferguson
|
|
|
|
Inspection Record Card- Bld | | | 3/29/2017 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/29/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/29/2017 | | DONE |
Christina Prado
|
|
|
|
1st review completed | | | 3/29/2017 | | DONE |
David Ferguson
|
|
|
|
Issue PAID IN FULL permit | | | 3/29/2017 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 3/29/2017 | | DONE |
Christina Prado
|
|
|
|
Routing Walk-In (Zoning) | 3/22/2017 | 3/22/2017 | 3/22/2017 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 3/22/2017 | 3/22/2017 | 3/22/2017 | A | FAIL |
Brian McGowan
|
|
|
Need to provide floor plan and elevations.
|
Application received | | 3/22/2017 | | | |
|
|
|
|