Permit Information
Permit NumberBLD17-00744
StatusFinaled
Name LAYTON CONSTRUCTION
Site Address 3201 W AIRPORT WAY
Project NameLoading Walkway at Gate C11
Customer Number 
ePlanReviewYes
Description
(ELEVATED AIRCRAFT PASSENGER LOADING WALKWAY – WEST GROUND LEVEL LOADING PEDESTRIAN WALKWAY – GATE C11 – BOISE AIRPORT) The ground level loading pedestrian walkway does not have a fire sprinkler system. To construct an elevated aircraft passenger loading walkway. A 157 square feet portion of the existing concrete tarmac will be removed to install a new 2.0 feet thick, 12.5 feet by 12.5 feet concrete base to support the new elevated, telescoping, and rotating aircraft passenger loading walkway. Anchor bolts are 2.25 inches in diameter and will be embedded 1.5 feet into the concrete. The existing passenger boarding door in the wall of the ground level loading pedestrian walkway at former Gate C11 will have all hardware removed and will be welded shut. A new Gate C11 will be created in a different location to provide access to the new elevated aircraft passenger loading walkway. A new column will be provided in the wall of the ground level loading pedestrian walkway to resist out of plane lateral loads at the new door. New work is to include an interior concrete ramp within the ground level loading pedestrian walkway sloped at 1 unit vertical to 12 units horizontal with a level landing at 30 feet maximum and handrails on each side; a new 4 foot wide door at new Gate C11 with level landings on each side; a fixed, elevated, and enclosed aircraft passenger loading walkway ramp sloped at 1 unit vertical to 12 units horizontal with level landings at 30 feet maximum and handrails on each side having a floor area of about 435 square feet and a length of about 68 feet; and an elevated, enclosed, telescoping, and rotating aircraft passenger loading walkway sloped no steeper than 1 unit vertical to 20 units horizontal having a maximum floor area of about 600 square feet and a maximum length of about 105 feet. Special Inspection is required for concrete, welding, and for post installed anchors in hardened concrete. Supports for the fixed aircraft passenger loading walkway ramp will be attached to the existing concrete tarmac. The structural design by the manufacturer for the fixed and for the rotating aircraft passenger loading walkway, including support elements and attachments, are a deferred submittal item. The work is required to comply with the approved drawings, with the structural design, with the plan review report, with NFPA 415, and with all applicable codes and ordinances. This permit is intended to establish a Certificate of Occupancy only for the new aircraft passenger loading walkway. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 12/17/201712/18/2017 DONE
This permit finaled on the web by Douglas Karcher
Third Notice 11/19/201712/12/2017 DONE
Mailed 12-13-17
Second Notice 10/22/201711/14/2017 DONE
Mailed 11-15-17
First Notice10/10/201710/10/201710/12/2017 DONE
DetailsJim Storey
Mailed 10-13-17
BLD-Ceiling Grid Inspection10/9/201710/10/201710/10/2017ACANC
DetailsJim Storey
Doug Phone #: ###-####
BLD-Final10/9/201710/10/201710/10/2017APASS
DetailsJim Storey
Doug Phone #: ###-####
DOC - Permit Finaled10/10/201710/10/201710/10/2017PPASS
DetailsJim Storey
BLD-Final10/6/201710/9/201710/9/2017ACANC
DetailsJim Storey
BLD-Final10/6/201710/6/201710/9/2017PNR
DetailsJim Storey
call to meet to escort you in // Doug Phone #: ###-####
FIRE-Final Inspection10/5/201710/6/201710/6/2017APASS
DetailsTroy Cobbley
Life safety passed.

Doug, will meet you at the compass Phone #: ###-####
Meeting  10/6/2017 DONE
Per Sarah Schafer zoning inspection not required for this project
FIRE-Final Inspection10/5/201710/5/201710/5/2017PFAIL
DetailsTroy Cobbley
No city approved plans, need to test emergency lighting and exit signs, need a tagged fire extinguisher as discussed.

Doug-go to gate 50 and call Doug for access Phone #: ###-####
Issue PAID IN FULL permit  8/1/2017 DONE
Inspection Record Card- Bld  8/1/2017 DONE
OVERRIDE  4/26/2017  
Plan assigned to (CJW)3/27/20173/27/20174/26/2017 PASS
DetailsCarl Westfall
**** (Apr 14 - 15 days) (18 sheets) Passenger Boarding Bridge C11
Routing - PLAN CHECK3/27/2017 4/26/2017 PASS
DetailsCarl Westfall
1st review completed  4/26/2017 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/26/2017 DONE
Permit Ready to Issue  4/26/2017 DONE
***received the GC and RP just need rev cert of val 7-31-17 CAN***Needs; GC Form, Revised Cert of Value, RP
Routing - FIRE3/27/20173/27/20174/3/2017 PASS
DetailsKatie Marron
No comments required. Basic Life Safety.
Routing Off Site - STRUCTURAL3/27/2017 4/3/2017 PASS
DetailsCarl Westfall
Jared Bauder (CH2MHill)
Case Summary (BLD)  4/3/2017 DONE
Routing - Erosion and Sediment3/27/2017 3/29/2017 PASS
DetailsMelissa Jannusch
Waiver ok.
Routing - Design Review3/27/2017 3/28/2017 PASS
DetailsSarah Schafer
Exterior change approved through building permit.
Routing - Addressing3/27/2017 3/27/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS3/27/2017 3/27/2017 PASS
DetailsMorgan Webb
Intake Approval  3/27/2017 PASS
DetailsJulie Romig
Routing PW Drainage3/27/2017 3/27/2017 PASS
DetailsBrian Murphy
LESS THAN 1000SQ FT CONC.
Intake Approval  3/24/2017 FAIL
DetailsJulie Romig
Include stamp/signature on E70
Plan Reviewer's activity  3/24/2017  
Route to Design Review for approval.
Application received  3/22/2017 DONE
Application submitted via PDS Online on Mar 22 2017 2:52PM