StatusFinaled
Name WRIGHT BROTHERS THE BLDG CO EAGLE
Site Address 3033 W ELDER ST
Project NameWells Fargo Chiller plant
Customer Number 
ePlanReviewYes
Description
(WELLS FARGO – CHILLER PLANT) Permit to demo the existing 945 sq. ft. enclosed chiller room and construct a new 1,368 sq. ft. open air chiller plant with an enclosed 37 sq. ft. rated fire riser room within the area at the west end of the existing building. Scope of work includes: removal of select concrete slab, removal of select walls, removal of select roof assembly, removal of select storefront window and infill with 8” CMU, construction of concrete footings, concrete slab, construction of CMU walls, construction of interior non-bearing steel stud rated walls and ceiling to create a fire riser room, new electrical, new plumbing work, new mechanical and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. Note: Special Inspections Required see form 310. The building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  8/13/2019 DONE
Print Statement  8/12/2019 DONE
Third Notice 7/15/20198/5/2019 DONE
mailed 8-6-19 with second follow up
Second Follow up  8/5/2019 DONE
Third Notice 6/15/20197/10/2019 DONE
mailed 7-11 with first follow up letter
First Follow up  7/10/2019 DONE
Third Notice 5/11/20196/10/2019 DONE
mailed 6-11
Second Notice 4/21/20195/6/2019 DONE
mailed 5-10-19
First Notice3/12/20193/12/20194/11/2019 DONE
DetailsJim Storey
mailed 4-12-19
BLD-Aging Inspection3/12/20193/12/20193/12/2019 DONE
DetailsJim Storey
DOC - Permit Finaled3/12/20193/12/20193/12/2019PPASS
DetailsJim Storey
FIRE-Final Inspection10/29/201810/29/201810/29/2018PPASS
DetailsTroy Cobbley
Life safety passed

Jade Phone #: ###-####
BLD-Aging Inspection9/21/20189/21/20189/21/2018 PASS
DetailsJim Storey
pending fire
FIRE-Final Inspection6/8/20186/8/20186/8/2018PCANC
DetailsTroy Cobbley
To be rescheduled per Jade until he can get pland and small documents on site.

Jade Conrad Phone #: ###-####
BLD-Aging Inspection5/10/20185/10/20185/10/2018 PASS
DetailsJim Storey
mec open wip
BLD-Aging Inspection12/27/201712/27/201712/27/2017 PASS
DetailsJim Storey
BLD-Framing/Rough-in8/14/20178/15/20178/15/2017APASS
DetailsJim Storey
Kevin Phone #: ###-####
BLD-Foundation7/25/20177/27/20177/27/2017APASS
DetailsJim Storey
Kevin-rebar Phone #: ###-####
BLD-Footing7/10/20177/11/20177/11/2017PPASS
DetailsJim Storey
Kevin-footings and rebar Phone #: ###-####
BLD-Footing7/6/20177/7/20177/6/2017PCANC
DetailsJim Storey
footing rebar // Kevin Phone #: ###-#### Canceled Kevin called thursday 7-06-2017 at 11:23am.
BLD-Footing6/21/20176/22/20176/22/2017PPASS
DetailsJim Storey
Kevin Phone #: ###-#### si pending
Issue PAID IN FULL permit  5/23/2017 DONE
Inspection Record Card- Bld  5/23/2017 DONE
OVERRIDE  5/15/2017  
Plan assigned to (JG)4/12/20174/12/20175/15/2017 PASS
DetailsJavier Guzman
1st rev comp, 5/02 Wells Fargo Chiller Plant Expansion ePlan
Routing - PLAN CHECK5/15/2017 5/15/2017 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  5/15/2017 DONE
Permit Ready to Issue  5/15/2017 DONE
MET need RP GC, ACHD & rev cert of val
Routing - PLAN CHECK5/10/2017 5/13/2017 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL5/10/2017 5/13/2017 PASS
DetailsJavier Guzman
signed off in ePlan by AHJ Engineers Chris Holladay
Route to Impact Fee Review5/4/20175/7/20175/4/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLUMBING5/3/2017 5/4/2017 PASS
DetailsBill VanDegrift
perplans and ISPC
1st review completed  5/4/2017 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK4/12/2017 5/3/2017 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL4/12/2017 5/2/2017 FAIL
DetailsJavier Guzman
failed in ePlan by AHJ Engineers Chris Holladay
Routing PW Drainage4/12/2017 4/24/2017 PASS
DetailsBrian Murphy
Routing - FIRE4/12/20174/12/20174/18/2017 PASS
DetailsScott Arellano
Attached comments to plans.
Routing - Erosion and Sediment4/12/2017 4/17/2017 PASS
DetailsAndy J. Long
Waiver approved.
Routing PW Environmental4/12/2017 4/14/2017 PASS
DetailsRick Christenson
Intake Approval  4/12/2017 PASS
Routing - MECHANICAL4/12/2017 4/12/2017 PASS
DetailsTroy James
Routing - PLANNING4/12/2017 4/12/2017 PASS
DetailsCody Riddle
Routing - PLANNING Land Div4/12/2017 4/12/2017 PASS
DetailsTodd Tucker
Routing - Addressing4/12/2017 4/12/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS4/12/2017 4/12/2017 PASS
DetailsRachael Beierle
Routing - Design Review4/12/2017 4/12/2017 PASS
DetailsSarah Schafer
Approved per DRH16-00293
Intake Approval  3/28/2017 FAIL
DetailsDavid Ferguson
upload a completed #502 Checklist and re-upload new plan sheets that are stamped, signed and dated.
Application received  3/22/2017 DONE
Application submitted via PDS Online on Mar 22 2017 3:16PM