Permit Information
Permit NumberBLD17-00761
StatusExpired
Name VISSER BUILDING CO
Site Address 340 N PANORAMA PL
Project NameGustavel Residence
Customer NumberBLD17-03695 DEMO
ePlanReviewYes
Description
WUI Zone A - Class "A" Roof Required** Permit for the construction of a new 6,456 sq. ft., two story (first story 1,986 sq. ft., basement 4,470 sq. ft.) single family dwelling with 5 bedrooms, 5.5 bathrooms, approximately 475 sq. ft. of covered patio/porch and a 1,249 sq. ft. attached garage per the approved plans. This residence shall be fully fire sprinklered in accordance with NFPA 13D. R-B5 zoning and setbacks per planning. **DAF**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 608-7168.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired3/19/20203/19/20203/19/2020PPASS
DetailsDave Hannah
BLD-Conference1/23/20203/19/20203/19/2020AFAIL
DetailsDave Hannah
See documents...
Permit expires 19Mar20...no work has started
BLD-Aging Inspection1/24/20201/24/20201/24/2020 DEFR
DetailsBrandon Shaw
BLD-Aging Inspection1/23/20201/23/20201/23/2020 DEFR
DetailsBrandon Shaw
Extend Permit 90/180 days1/23/20201/23/20201/23/2020PDEFR
DetailsBrandon Shaw
Expires 19Mar20...
Extend Review Timeline  8/1/2019 DONE
Permit 1st approved extension per Carl M. see documents
Telephone call  2/6/2019 DONE
as per Bob-wanting to know when permit expires-told him 9/11/19 CAN
Issue PAID IN FULL permit  9/11/2018 DONE
Inspection Record Card- Bld  9/11/2018 DONE
Extend Review Timeline  3/7/2018 DONE
Final approved 180 day extension per Adele. See documents
Meeting  2/28/2018 DONE
sent in letter for extension request
Expiration Notice2/21/20183/14/20182/21/2018 DONE
DetailsBrittany Hill
Extend Review Timeline  11/1/2017 DONE
1st approved 180 extension per adele. see documents
Telephone call  10/30/2017 DONE
***BOB EMAILED IN AN EXTENSION REQUEST***Left a message for Bob about possibly sending in a request for an extension and to give me a call if any questions.
Telephone call  10/26/2017 DONE
Sent an email to Bob with Visser recommending to send in a request for a 180 day extension if they are not ready to pick the permit up. Also informed him that the demo permit will need to be finaled before this one could be issued
OVERRIDE  10/25/2017  
Plan assigned to (CDM)8/8/20178/8/201710/25/2017 PASS
DetailsCarl D Madsen
SFD from Dave
Routing - PLAN CHECK10/17/2017 10/25/2017 PASS
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL10/17/2017 10/25/2017 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  10/25/2017 DONE
Permit Ready to Issue  10/25/2017 DONE
All met
Routing - Erosion and Sediment9/27/2017 9/27/2017 PASS
DetailsAndy J. Long
ESC site map and project narrative submitted and approved. Valid stormwater management team designated. Site preparation inspection is REQUIRED. Install BMPs per ESC site plan
Plan assigned to (DAF)3/24/20173/24/20178/8/2017 DEFR
DetailsDavid Ferguson
(1st done) due 4/12 - SFD, sturctural has been sent to outsource
Routing - PLAN CHECK7/8/2017 8/1/2017 FAIL
DetailsCarl D Madsen
Routing PW Grading-Hillside7/26/2017 7/26/2017 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing Off Site - STRUCTURAL7/8/2017 7/25/2017 FAIL
DetailsCarl D Madsen
Routing - Erosion and Sediment7/8/2017 7/13/2017 FAIL
DetailsAndy J. Long
Need to submit ESC plan narrative. Site map only submitted. Call ###-#### with any questions.
1st review completed  4/15/2017 DONE
DetailsDavid Ferguson
Routing - PLAN CHECK3/24/2017 4/15/2017 FAIL
DetailsDavid Ferguson
need WUI details, structural plan sheets say NOT FOR CONSTRUCTION, #310 form
Routing PW Grading-Hillside3/24/2017 4/10/2017 FAIL
DetailsJason C. Taylor
See changemarks in ePlan. JCT
Routing Off Site - STRUCTURAL3/24/2017 4/10/2017 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - Erosion and Sediment3/24/2017 3/28/2017 FAIL
DetailsAndy J. Long
No ESC site map or ESC narrative uploaded on ePlan. ESC plan required for hillside zone residential demolition and new construction. One plan and permit for parcel will be accepted.
Routing - MECHANICAL3/24/2017 3/28/2017 PASS
DetailsTroy James
Routing - PLANNING3/24/2017 3/28/2017 PASS
DetailsBrent Moore
Route to Impact Fee Review3/24/20173/27/20173/27/2017 PASS
DetailsTonya Wallace
Initial residential review of new SFD permits requested for now.
Routing - FIRE3/24/20173/24/20173/27/2017 PASS
DetailsKatie Marron
After discussion with applicant, this residence shall be fully fire sprinklered.
Routing - Addressing3/24/2017 3/27/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS3/24/2017 3/27/2017 PASS
DetailsRachael Beierle
Plan assigned to (AJS)3/24/20173/24/20173/24/2017 DEFR
DetailsAdele J Schaffeld-Griffin
Plans ACCEPTED BY PLAN TECH  3/24/2017 DONE
Intake Approval  3/24/2017 PASS
Recd Pcfee & Taken To Pln CK  3/24/2017 DONE
Application received  3/23/2017 DONE
Application submitted via PDS Online on Mar 23 2017 10:55AM