Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD17-00779
StatusFinaled
Name BLACKROCK HOMES LLC
Site Address 7092 E TAO ST
Project NameLatigo 17B
Customer NumberLATIGO 17B
ePlanReviewYes
Description
Permit for the construction of a new 2691 sq. ft., two story (first story 1117 sq. ft., second story 1574 sq. ft.) single family dwelling with 5 bedrooms, 2.5 bathrooms, approximately 251 sq. ft. of covered patio/porch and a 802 sq. ft. attached garage per the approved plans. R-1C/DA zoning and setbacks per planning. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 608-7168.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/16/20184/17/20184/17/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
DOC - Permit Finaled4/17/20184/17/20184/17/2018PPASS
DetailsBrandon Shaw
PubWorks Occupancy Approval4/17/20184/17/20184/17/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Energy code compliance1/17/20181/18/20181/18/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in1/15/20181/16/20181/16/2018APASS
DetailsBrandon Shaw
OK to insulate
BLD-Wall Bracing12/21/201712/21/201712/21/2017PPASS
DetailsJim Storey
Shear // Luna Phone #: ###-####
BLD-Foundation9/11/20179/12/20179/12/2017PPASS
DetailsBrandon Shaw
Matt Phone #: ###-####
BLD-Footing9/8/20179/11/20179/12/2017PPASS
DetailsBrandon Shaw
Matt Phone #: ###-####
PubWorks Subgrade Approval9/8/20179/8/20179/8/2017 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  6/14/2017 DONE
Inspection Record Card- Bld  6/14/2017 DONE
OVERRIDE  6/13/2017  
Plan assigned to (DAF)3/28/20173/28/20176/13/2017 PASS
DetailsDavid Ferguson
(1st done) due 4/13 - failed hillside
Routing - PLAN CHECK6/8/2017 6/13/2017 PASS
DetailsCarl D Madsen
Routing - PUBLIC WORKS6/8/2017 6/13/2017 PASS
DetailsRachael Beierle
PLANS/APPL TAKEN TO FRONT DESK  6/13/2017 DONE
Permit Ready to Issue  6/13/2017 DONE
All Met
Routing PW Grading-Hillside6/9/2017 6/9/2017 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
1st review completed  4/17/2017 DONE
DetailsDavid Ferguson
Routing - PLAN CHECK3/27/2017 4/17/2017 PASS
DetailsDavid Ferguson
Routing PW Grading-Hillside3/27/2017 4/10/2017 FAIL
DetailsJason C. Taylor
See changemarks in eplan. JCT
Routing - FIRE3/27/20173/27/20173/29/2017 PASS
DetailsKatie Marron
Plans were reviewed for FD Access, hydrant availability and defensible space.
Routing - Erosion and Sediment3/27/2017 3/29/2017 PASS
DetailsAndy J. Long
Waiver letter ok.
Routing - MECHANICAL3/27/2017 3/29/2017 PASS
DetailsTroy James
Route to Impact Fee Review3/27/20173/30/20173/28/2017 PASS
DetailsTonya Wallace
Initial residential review of new SFD permits requested for now.
Plan assigned to (AJS)3/27/20173/27/20173/28/2017 DEFR
DetailsAdele J Schaffeld-Griffin
Routing - PUBLIC WORKS3/27/2017 3/28/2017 PASS
DetailsRachael Beierle
Plans ACCEPTED BY PLAN TECH  3/27/2017 DONE
Intake Approval  3/27/2017 PASS
Recd Pcfee & Taken To Pln CK  3/27/2017 DONE
Routing - PLANNING3/27/2017 3/27/2017 PASS
DetailsDavid Moser
Routing - Addressing3/27/2017 3/27/2017 PASS
DetailsLaura Hunter
Application received  3/24/2017 DONE
Application submitted via PDS Online on Mar 24 2017 8:47AM