BLD-Final | 9/13/2017 | 9/14/2017 | 9/14/2017 | A | PASS |
Jim Storey
|
|
|
Dave''s Cell ###-#### Kent''s Cell ###-#### Call for Garage door code if no one there. Thanks Phone #: ###-#### Inspection requested via web by Kent Mortensen
|
DOC - Permit Finaled | 9/14/2017 | 9/14/2017 | 9/14/2017 | P | PASS |
Jim Storey
|
|
|
|
Letter of compliance/Occupancy | | | 9/14/2017 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 9/14/2017 | | DONE |
Carl D Madsen
|
|
|
Soffits OK per Ron Johnson with single layer of Hardy and rated vents in the soffits.
|
Plan Modification Accepted | | | 9/6/2017 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 9/6/2017 | | 9/6/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Conference | 8/25/2017 | 8/28/2017 | 8/28/2017 | A | PART |
Jim Storey
|
|
|
Or my Cell ###-#### Call me to set up a time to meet myself and the deck railing contractor to discuss railing on stairs. request from Meridian fence to meet. Phone #: ###-#### Inspection requested via web by Kent Mortensen reviewed fire treated stairs and joist ok/ specs for gaurdrail and handrail// qustions as to aproved plan and reviewed wild land requrments?
|
BLD-Energy code compliance | 7/5/2017 | 7/5/2017 | 7/5/2017 | P | PASS |
Brandon Shaw
|
|
|
Kent ###-#### Dave ###-#### Call if you have questions. Thanks Phone #: ###-#### Inspection requested via web by Kent Mortensen
|
BLD-Framing/Rough-in | 6/29/2017 | 6/30/2017 | 6/30/2017 | P | PASS |
Brandon Shaw
|
|
|
Call Kent Mortensen if you have any questions. Thanks, Phone #: ###-#### Inspection requested via web by Kent Mortensen
|
Plan Modification Accepted | | | 6/27/2017 | | DONE |
|
|
|
resubmitted manual j report
|
Routing - MECHANICAL | 6/27/2017 | | 6/27/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 6/18/2017 | 6/19/2017 | 6/19/2017 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by David Mortensen
|
BLD-Foundation | 5/10/2017 | 5/12/2017 | 5/12/2017 | P | DONE |
Jim Storey
|
|
|
Mana Phone #: ###-####pwoi
|
BLD-Footing | 5/9/2017 | 5/10/2017 | 5/10/2017 | P | PASS |
Jim Storey
|
|
|
Sean Phone #: ###-####
|
PubWorks Subgrade Approval | 5/10/2017 | 5/10/2017 | 5/10/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Conference | 5/5/2017 | 5/5/2017 | 5/5/2017 | A | PEND |
Brandon Shaw
|
|
|
need a meeting on site to go over erosion control plan call me to set up time thanks Phone #: ###-#### Inspection requested via web by David Mortensen Defer to Andy, advised to put silt bags at property line before dig begins.
|
Issue PAID IN FULL permit | | | 5/1/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 5/1/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 4/18/2017 | | |
|
|
|
|
Plan assigned to (DAF) | 3/24/2017 | 3/24/2017 | 4/18/2017 | | DONE |
David Ferguson
|
|
|
(1st done) due 4/12 sfd - need addl. WUI details
|
Routing - PLAN CHECK | 4/6/2017 | | 4/18/2017 | | PASS |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 4/18/2017 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/18/2017 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 4/18/2017 | | DONE |
Christina Prado
|
|
|
All requirements met for issuance
|
Telephone call | | | 4/18/2017 | | DONE |
|
|
|
Spoke with Kent informing him that this permit is ready to be picked up and the fee amount due for issuance
|
1st review completed | | | 4/15/2017 | | DONE |
David Ferguson
|
|
|
|
Routing PW Grading-Hillside | 4/14/2017 | | 4/14/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PUBLIC WORKS | 4/14/2017 | | 4/14/2017 | | PASS |
Morgan Webb
|
|
|
|
Plan resubmittals received | | | 4/10/2017 | | DONE |
Christina Prado
|
|
|
Received three set of revised site plan & grading plan; PLans taken to DAF for review and routing
|
Routing - FIRE | 4/5/2017 | | 4/6/2017 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Routing - Erosion and Sediment | 4/3/2017 | | 4/4/2017 | | PASS |
Andy J. Long
|
|
|
ESC site map with narrative approved. Site preparation inspection required, call ###-####
|
Routing - PUBLIC WORKS | 4/3/2017 | | 4/3/2017 | | FAIL |
Morgan Webb
|
|
|
SEE JASON TAYLOR FOR FAIL
|
Routing - MECHANICAL | 4/3/2017 | | 4/3/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 4/3/2017 | | 4/3/2017 | | PASS |
Sue Cummings
|
|
|
|
Routing PW Grading-Hillside | 3/24/2017 | | 4/3/2017 | | FAIL |
Jason C. Taylor
|
|
|
Grading Plan will need to be revised as per phone conversation with design engineer. Please resubmit 3 copies of (both sheets 1&2) to the front counter. Jason Taylor 3###-####
|
Route to Impact Fee Review | 3/24/2017 | 3/27/2017 | 3/27/2017 | | PASS |
Tonya Wallace
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plan assigned to (AJS) | 3/24/2017 | 3/24/2017 | 3/24/2017 | | DEFR |
Adele J Schaffeld-Griffin
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/24/2017 | | DONE |
|
|
|
as per Brittany-Jason Taylor didn't need to see it before intake
|
Intake Approval | | | 3/24/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/24/2017 | | DONE |
|
|
|
|
Routing - Addressing | 3/24/2017 | | 3/24/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing PW Sewer Rating | 3/24/2017 | | 3/24/2017 | | PASS |
Morgan Webb
|
|
|
|
Application received | | 3/24/2017 | | | |
|
|
|
|