Permit NumberBLD17-00784
StatusFinaled
Name MORTENSEN CONSTRUCTION
Site Address 3384 E HEARTLEAF DR
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone B Perimeter Lot - Must be constructed with Zone A requirements - Class "A" roof required** Permit for the construction of a new 3645 sq. ft., two story (first story 1934 sq. ft., second story 1711 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 749 sq. ft. of covered patio/porch and a 819 sq. ft. attached garage per the approved plans. R-1C zoning and setbacks per planning. **DAF** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 608-7168.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/13/20179/14/20179/14/2017APASS
DetailsJim Storey
Dave''s Cell ###-####
Kent''s Cell ###-####
Call for Garage door code if no one there.
Thanks Phone #: ###-#### Inspection requested via web by Kent Mortensen
DOC - Permit Finaled9/14/20179/14/20179/14/2017PPASS
DetailsJim Storey
Letter of compliance/Occupancy  9/14/2017 DONE
Plan Reviewer's activity  9/14/2017 DONE
DetailsCarl D Madsen
Soffits OK per Ron Johnson with single layer of Hardy and rated vents in the soffits.
Plan Modification Accepted  9/6/2017 DONE
new manual j report
Routing - MECHANICAL9/6/2017 9/6/2017 PASS
DetailsTroy James
resubmitted manual j report
BLD-Conference8/25/20178/28/20178/28/2017APART
DetailsJim Storey
Or my Cell ###-####
Call me to set up a time to meet myself and the deck railing contractor to discuss railing on stairs. request from Meridian fence to meet. Phone #: ###-#### Inspection requested via web by Kent Mortensen reviewed fire treated stairs and joist ok/ specs for gaurdrail and handrail// qustions as to aproved plan and reviewed wild land requrments?
BLD-Energy code compliance7/5/20177/5/20177/5/2017PPASS
DetailsBrandon Shaw
Kent ###-####
Dave ###-####
Call if you have questions. Thanks Phone #: ###-#### Inspection requested via web by Kent Mortensen
BLD-Framing/Rough-in6/29/20176/30/20176/30/2017PPASS
DetailsBrandon Shaw
Call Kent Mortensen if you have any questions.
Thanks, Phone #: ###-#### Inspection requested via web by Kent Mortensen
Plan Modification Accepted  6/27/2017 DONE
resubmitted manual j report
Routing - MECHANICAL6/27/2017 6/27/2017 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing6/18/20176/19/20176/19/2017APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by David Mortensen
BLD-Foundation5/10/20175/12/20175/12/2017PDONE
DetailsJim Storey
Mana Phone #: ###-####pwoi
BLD-Footing5/9/20175/10/20175/10/2017PPASS
DetailsJim Storey
Sean Phone #: ###-####
PubWorks Subgrade Approval5/10/20175/10/20175/10/2017 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Conference5/5/20175/5/20175/5/2017APEND
DetailsBrandon Shaw
need a meeting on site to go over erosion control plan
call me to set up time thanks Phone #: ###-#### Inspection requested via web by David Mortensen
Defer to Andy, advised to put silt bags at property line before dig begins.
Issue PAID IN FULL permit  5/1/2017 DONE
(F) Reprint permit  5/1/2017 DONE
OVERRIDE  4/18/2017  
Plan assigned to (DAF)3/24/20173/24/20174/18/2017 DONE
DetailsDavid Ferguson
(1st done) due 4/12 sfd - need addl. WUI details
Routing - PLAN CHECK4/6/2017 4/18/2017 PASS
DetailsDavid Ferguson
Case Summary (BLD)  4/18/2017 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  4/18/2017 DONE
Inspection Record Card- Bld  4/18/2017 DONE
DetailsChristina Prado
Permit Ready to Issue  4/18/2017 DONE
DetailsChristina Prado
All requirements met for issuance
Telephone call  4/18/2017 DONE
Spoke with Kent informing him that this permit is ready to be picked up and the fee amount due for issuance
1st review completed  4/15/2017 DONE
DetailsDavid Ferguson
Routing PW Grading-Hillside4/14/2017 4/14/2017 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - PUBLIC WORKS4/14/2017 4/14/2017 PASS
DetailsMorgan Webb
Plan resubmittals received  4/10/2017 DONE
DetailsChristina Prado
Received three set of revised site plan & grading plan; PLans taken to DAF for review and routing
Routing - FIRE4/5/2017 4/6/2017 PASS
DetailsScott Arellano
No comments attached.
Routing - Erosion and Sediment4/3/2017 4/4/2017 PASS
DetailsAndy J. Long
ESC site map with narrative approved. Site preparation inspection required, call ###-####
Routing - PUBLIC WORKS4/3/2017 4/3/2017 FAIL
DetailsMorgan Webb
SEE JASON TAYLOR FOR FAIL
Routing - MECHANICAL4/3/2017 4/3/2017 PASS
DetailsTroy James
Routing - PLANNING4/3/2017 4/3/2017 PASS
DetailsSue Cummings
Routing PW Grading-Hillside3/24/2017 4/3/2017 FAIL
DetailsJason C. Taylor
Grading Plan will need to be revised as per phone conversation with design engineer. Please resubmit 3 copies of (both sheets 1&2) to the front counter. Jason Taylor 3###-####
Route to Impact Fee Review3/24/20173/27/20173/27/2017 PASS
DetailsTonya Wallace
Initial residential review of new SFD permits requested for now.
Plan assigned to (AJS)3/24/20173/24/20173/24/2017 DEFR
DetailsAdele J Schaffeld-Griffin
Plans ACCEPTED BY PLAN TECH  3/24/2017 DONE
as per Brittany-Jason Taylor didn't need to see it before intake
Intake Approval  3/24/2017 PASS
Recd Pcfee & Taken To Pln CK  3/24/2017 DONE
Routing - Addressing3/24/2017 3/24/2017 PASS
DetailsLaura Hunter
Routing PW Sewer Rating3/24/2017 3/24/2017 PASS
DetailsMorgan Webb
Application received 3/24/2017