BLD-Final | 1/2/2020 | 1/3/2020 | 1/3/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Homeyer
|
DOC - Permit Finaled | 1/3/2020 | 1/3/2020 | 1/3/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 11/7/2019 | 11/8/2019 | 11/8/2019 | A | PASS |
Brandon Shaw
|
|
|
Insulation Inspection Phone #: ###-#### Inspection requested via web by Chris Homeyer
|
BLD-Energy code compliance | 10/29/2019 | 10/30/2019 | 10/30/2019 | A | PASS |
Brandon Shaw
|
|
|
OK to insulate...
|
Routing Walk-In (Zoning) | 10/21/2019 | 10/21/2019 | 10/21/2019 | A | PASS |
Ethan Mansfield
|
|
|
|
Routing Walk-In (BLD) | 10/21/2019 | 10/21/2019 | 10/21/2019 | A | DONE |
Josh Bogle
|
|
|
submitting a plan mod
|
Routing - PLAN CHECK | 10/21/2019 | | 10/21/2019 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/21/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/21/2019 | | DONE |
Josh Bogle
|
|
|
fee per added value
|
Plan Modification Accepted | | | 10/21/2019 | | DONE |
|
|
|
Plan mod to covert garage into living space
|
Permit Ready to Issue | | | 10/21/2019 | | DONE |
|
|
|
plan mod approved
|
CHANGE STATUS TO (ISS) | | | 10/21/2019 | | DONE |
|
|
|
plan mod approved
|
BLD-Conference | 10/10/2019 | 10/11/2019 | 10/11/2019 | A | DONE |
Brandon Shaw
|
|
|
Mike will be available at site Garage framing conference Phone #: ###-#### Inspection requested via web by Chris Homeyer
|
BLD-Energy code compliance | 7/16/2019 | 7/16/2019 | 7/16/2019 | A | PASS |
Brandon Shaw
|
|
|
Insulation inspection 2nd floor...if needed Phone #: ###-#### Inspection requested via web by Chris Homeyer
|
BLD-Framing/Rough-in | 7/11/2019 | 7/11/2019 | 7/11/2019 | P | PASS |
Brandon Shaw
|
|
|
2nd floor rough framing and energy seal... OK to insulate...
|
Routing Walk-In (Zoning) | 7/8/2019 | 7/8/2019 | 7/8/2019 | A | FAIL |
Josh Bogle
|
|
|
FAIL - conversion of single-car garage did not result in replacement space. applicant will verify dimensions and come back with proposal.
|
BLD-Energy code compliance | 6/27/2019 | 6/27/2019 | 6/27/2019 | A | CANC |
Mike Jordan
|
|
|
Tyvec inspection Phone #: ###-#### Inspection requested via web by Chris Homeyer
|
BLD-Conference | 6/27/2019 | 6/27/2019 | 6/27/2019 | A | DONE |
Mike Jordan
|
|
|
Tyvec inspection Phone #: ###-#### Inspection requested via web by Chris Homeyer. Framing walk through only.
|
BLD-Framing/Rough-in | 6/27/2019 | 6/27/2019 | 6/27/2019 | A | CANC |
Dave Hannah
|
|
|
2nd floor framing and tyvec Phone #: ###-#### >> Inspection requested via web by Chris Homeyer Inspection cancelled from web by: Chris Homeyer
|
BLD-Wall Bracing | 6/13/2019 | 6/13/2019 | 6/13/2019 | A | PASS |
Dave Hannah
|
|
|
Shear inspection 2nd level Phone #: ###-#### Inspection requested via web by Chris Homeyer
|
BLD-Foundation | 4/12/2019 | 4/12/2019 | 4/12/2019 | P | PASS |
Dave Hannah
|
|
|
Have sona tubes filled front and back wanting to back fill. Thanks Phone #: ###-#### Inspection requested via web by Chris Homeyer
|
BLD-Footing | 4/10/2019 | 4/10/2019 | 4/10/2019 | A | PASS |
Dave Hannah
|
|
|
Hole inspection Phone #: ###-#### Inspection requested via web by Chris Homeyer
|
Routing Walk-In (BLD) | 4/8/2019 | 4/8/2019 | 4/8/2019 | A | DONE |
Josh Bogle
|
|
|
questions for JOsh
|
Routing - PLAN CHECK | 4/8/2019 | | 4/8/2019 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 4/8/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/8/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 4/8/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/8/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 4/8/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/8/2019 | | DONE |
|
|
|
|
Telephone call | | | 4/1/2019 | | DONE |
|
|
|
letter from parcel owner was brought in-changing GC because Rocky Mountain Construction owner is very ill and can not finish the job so parcel owner (Greg and hamilton Sutton) is requesting that a new GC come in to finish the work
|
Meeting | | | 4/1/2019 | | DONE |
|
|
|
after talking to P&Z (Sue C) no plan review is required for phase 2 so sent to JAB to see if a plan review was required
|
Plan Reviewer's activity | | | 4/1/2019 | | DONE |
Josh Bogle
|
|
|
discussed documents needed for review of "phase 2"
|
BLD-Aging Inspection | 3/7/2018 | 3/7/2018 | 3/8/2018 | | DONE |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/8/2018 | 3/8/2018 | 3/8/2018 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 10/20/2017 | 10/20/2017 | 10/24/2017 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 10/19/2017 | 10/19/2017 | 10/24/2017 | | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 6/6/2017 | 6/7/2017 | 6/7/2017 | A | PASS |
Dave Hannah
|
|
|
Steve Phone #: ###-####
|
BLD-Framing/Rough-in | 6/5/2017 | 6/5/2017 | 6/6/2017 | P | PART |
Dave Hannah
|
|
|
Steve Phone #: ###-#### phase one kitchen master bed room ok to insulate
|
BLD-Wall Bracing | 5/16/2017 | 5/17/2017 | 5/17/2017 | A | PASS |
Dave Hannah
|
|
|
St4eve Phone #: ###-####
|
BLD-Foundation | 4/17/2017 | 4/18/2017 | 4/18/2017 | A | PART |
Dave Hannah
|
|
|
Steve Phone #: ###-####
|
BLD-Footing | 4/12/2017 | 4/13/2017 | 4/13/2017 | A | PASS |
Brandon Shaw
|
|
|
Steve Phone #: ###-####
|
Routing Walk-In (Zoning) | 4/12/2017 | 4/12/2017 | 4/12/2017 | P | PASS |
Sue Cummings
|
|
|
Plans revised. Building part only. Planning O.K.
|
Routing Walk-In (BLD) | 4/12/2017 | 4/12/2017 | 4/12/2017 | P | PASS |
David Ferguson
|
|
|
|
Plan assigned to (DAF) | 4/12/2017 | 4/12/2017 | 4/12/2017 | | DONE |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 4/12/2017 | | 4/12/2017 | | PASS |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 4/12/2017 | | DONE |
David Ferguson
|
|
|
|
Inspection Record Card- Bld | | | 4/12/2017 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/12/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/12/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/12/2017 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 3/29/2017 | 3/29/2017 | 3/29/2017 | P | FAIL |
David Ferguson
|
|
|
Need manual J, attachment of deck to house and deck to posts and foundation, exploded detail of deck with attachments, main floor framing plans that show points of attachment, wall bracing plans to show additional wall bracing on both floors. NOTE: design must be engineered for wall bracing.
|
1st review completed | | | 3/29/2017 | | DONE |
David Ferguson
|
|
|
|
Routing Walk-In (Zoning) | 3/24/2017 | 3/24/2017 | 3/24/2017 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 3/24/2017 | 3/24/2017 | 3/24/2017 | P | FAIL |
Tisha Gallop
|
|
|
need full size sets of plans, issues with wall bracing some beams and footings. Need stair section. In existing dwelling missing large beam and need new floor plan after remodel.
|
Application received | | 3/24/2017 | | | |
|
|
|
|