Permit Information
Permit NumberBLD17-00792
StatusIssued
Name STACK CONSTRUCTION
Site Address 909 E RESERVE ST
Project NameShaw Mtn Addition & Windows
Customer Number 
ePlanReviewYes
Description
(SHAW MOUNTAIN SKILLED NURSING FACILITY – PASSENGER LOADING ZONE AND CANOPY – NORTHWEST CORNER OF BUILDING – REPLACEMENT OF ALL WINDOWS IN THE BUILDING) (10-2-17 PLAN MODIFICATION TO INSTALL A FOUR LEAF DOOR – TWO LEAVES SLIDING WITH ALL FOUR LEAVES ABLE TO BREAKAWAY IN THE DIRECTION OF EGRESS TRAVEL – AND TO RECONFIGURE THE RAMP AND RAMP LANDING AT THE MAIN ENTRANCE TO THE FACILITY. THE CROSS SLOPE OF THE RAMP MEASURED PERPENDICULAR TO THE HANDRAILS WHICH IS ALSO PERPENDICULAR TO THE DIRECTION OF TRAVEL WHILE USING THE HANDRAILS IS NOT ALLOWED TO EXCEED A 2% SLOPE.) The fire sprinkler system is used for occupancy and for building area increase. NFPA 13 does not require the new canopy or covered ramp to be protected by fire sprinklers if the construction is entirely noncombustible. To remodel an entrance to an existing Skilled Nursing Facility, construct a 1,094 square foot covered passenger loading zone addition, construct a 200 square foot covered concrete ramp addition, and to replace all exterior windows in the building. The total addition has a floor area of 1,294 square feet. Demolition work includes removing exterior brick screen walls, exterior concrete sidewalks, exterior windows, exterior door, and an entry canopy. New work includes a new 1,094 square foot canopy with a membrane roof covering over a passenger loading zone (reinforced 4 feet diameter by 17 feet deep concrete footings, steel columns, steel beams, steel beam to steel column moment connections, steel roof purlins, fire-retardant-treated wood roof deck), a new 200 square foot canopy with a steel roof covering over the new entrance ramp (reinforced 1.5 feet diameter by 2.67 feet deep concrete footings, steel columns, steel beams, steel roof deck), a new concrete ramp with a handrail on each side, a passenger loading zone, new concrete sidewalk on grade, and all new windows for the entire building. Special Inspection is required for intumescent fire resistive coatings, soils, concrete, cast-in-place deep foundations, and steel (including welding). The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
CHANGE STATUS TO (ISS)  7/9/2018 DONE
PLAN MOD
Telephone call  4/6/2018 DONE
Left a message for Brent reminiding him about this plan mod still needed to be paid and permit put back in issue status
Plan assigned to (CJW)9/25/20179/25/201710/2/2017 PASS
DetailsCarl Westfall
plan mod (1st done)
Routing - PLANNING9/26/2017 10/2/2017 PASS
DetailsCody Riddle
Plan resubmittals requested  10/2/2017 DONE
Plan resubmittals received  10/2/2017 DONE
Routing - PLAN CHECK10/2/2017 10/2/2017 PASS
DetailsCarl Westfall
Plan mod approved
Plan Reviewer's activity  10/2/2017 PASS
Plan mod approved
Permit Ready to Issue  10/2/2017 DONE
DO NOT RE ISSUE PLAN MOD
Routing - PLAN CHECK9/25/2017 9/26/2017 FAIL
DetailsCarl Westfall
More info about the ramp slope and elevation change needed
Plan Modification Accepted  9/25/2017 DONE
DetailsChristina Prado
Plan Mod to widen proposed entrance door and widen the associated ramp
BLD-Footing8/14/20178/15/20178/15/2017APASS
DetailsDave Hannah
Nate Phone #: ###-####
Issue PAID IN FULL permit  6/2/2017 DONE
Print Occupancy Form  6/2/2017 DONE
Plan assigned to (CJW)3/31/20173/31/20175/19/2017 PASS
DetailsCarl Westfall
(2nd done) (Apr 20 - 15 days) (22 sheets) Shaw Mountain Remodel
Routing Off Site - STRUCTURAL5/15/2017 5/19/2017 PASS
DetailsCarl Westfall
Dave Haugland (AHJ)
Routing - PLAN CHECK5/12/2017 5/19/2017 PASS
DetailsCarl Westfall
Approval by structural.
PLANS/APPL TAKEN TO FRONT DESK  5/19/2017 DONE
Permit Ready to Issue  5/19/2017 DONE
DetailsChristina Prado
ALL MET WAITING TO HEAR BACK FROM ANDY ABOUT ESC FEES AS OF 11AM 5-31-17 Need ACHD, RP, GC Form & Revised Certificate of Value for issuance
Routing - PLANNING5/15/2017 5/16/2017 PASS
DetailsCody Riddle
Plan resubmittals received  5/12/2017 DONE
Route to Impact Fee Review4/27/20174/30/20174/28/2017 PASS
DetailsMarissa Taylor
Review requested for Commercial Permit
1st review completed  4/27/2017 DONE
Plan resubmittals requested  4/27/2017 DONE
Routing - PLAN CHECK3/31/2017 4/27/2017 FAIL
DetailsCarl Westfall
1st IBC plan review done
Routing Off Site - STRUCTURAL3/31/2017 4/14/2017 FAIL
Dave Haugland (AHJ)
Routing - Erosion and Sediment3/31/2017 4/5/2017 PASS
DetailsAndy J. Long
ESC plan and site map provided. Valid PD, need to assign valid RP before permit issue.
Routing - PLANNING Land Div3/31/2017 4/4/2017 PASS
DetailsTodd Tucker
Routing - FIRE3/31/20173/31/20174/3/2017 PASS
DetailsKatie Marron
New porte cochere is not attached to existing building. Fire Department access is not required through drop off/parking area so modifications are ok.
Routing - Addressing3/31/2017 4/3/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS3/31/2017 4/3/2017 PASS
DetailsRachael Beierle
Routing - PLANNING3/31/2017 4/3/2017 FAIL
DetailsCody Riddle
Staff level CUP modification required. Emailed applicant and architect today. CER 4/3/17
Routing - Design Review3/31/2017 4/3/2017 PASS
DetailsSarah Schafer
No Design Review required.
Intake Approval  3/31/2017 PASS
Intake Approval  3/28/2017 FAIL
DetailsJulie Romig
This is a 502 project, not a Minor TI, due to the new addition of the porte cochere structure.
Complete the 502 Checklist with all applicable documents provided, including, but not limited to the following:
1. The Geotech Report (referenced in structural plans).
2. Site drainage report and drainage system operations & maintenance plan. Contact Brian Murphy at public works at ###-#### to determine if this is necessary. If not, provide email waiving requirement with application.
Application received  3/24/2017 DONE
Application submitted via PDS Online on Mar 24 2017 3:26PM