BLD-Final | 1/12/2018 | 1/16/2018 | 1/16/2018 | P | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
DOC - Permit Finaled | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 1/12/2018 | 1/16/2018 | 1/16/2018 | A | CANC |
Jim Storey
|
|
|
David Phone #: ###-#### CANCELE PER DAVID
|
BLD-Framing/Rough-in | 11/22/2017 | 11/24/2017 | 11/24/2017 | A | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
Routing Walk-In (Zoning) | 10/30/2017 | 10/30/2017 | 10/30/2017 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 10/30/2017 | 10/30/2017 | 10/30/2017 | A | PASS |
Josh Bogle
|
|
|
modification to add 10x26 carport JAB
|
BLD-Footing | 10/27/2017 | 10/27/2017 | 10/27/2017 | P | PART |
Jim Storey
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 10/23/2017 | 10/23/2017 | 10/23/2017 | P | PASS |
Jim Storey
|
|
|
David Phone #: ###-#### wall bracing ok to cover all exterior.
|
BLD-Conference | 10/16/2017 | 10/16/2017 | 10/16/2017 | P | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 10/3/2017 | 10/3/2017 | 10/3/2017 | P | PART |
Jim Storey
|
|
|
Floor framing - David Phone #: ###-#### under floor ok
|
BLD-Concrete | 8/28/2017 | 8/28/2017 | 8/28/2017 | P | PASS |
Jim Storey
|
|
|
David Phone #: ###-#### front porch peir foottings ok
|
BLD-Conference | 7/25/2017 | 7/25/2017 | 7/25/2017 | P | PASS |
Jim Storey
|
|
|
call a hour for access- David Phone #: ###-#### porch ok need ft insp.
|
BLD-Foundation | 4/28/2017 | 5/1/2017 | 5/1/2017 | A | PASS |
Jim Storey
|
|
|
David-stem wall forms Phone #: ###-####
|
BLD-Footing | 4/14/2017 | 4/17/2017 | 4/17/2017 | A | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
OVERRIDE | | | 3/29/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 3/29/2017 | 3/29/2017 | 3/29/2017 | P | DONE |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 3/29/2017 | | 3/29/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 3/29/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 3/29/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/29/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 3/29/2017 | | DONE |
|
|
|
all requirements met
|
Issue PAID IN FULL permit | | | 3/29/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 3/27/2017 | 3/27/2017 | 3/27/2017 | P | PASS |
David Moser
|
|
|
Detached bldg for Office area, no kicthen and no full bathroom
|
Routing Walk-In (BLD) | 3/27/2017 | 3/27/2017 | 3/27/2017 | P | FAIL |
Brian McGowan
|
|
|
|
1st review completed | | | 3/27/2017 | | FAIL |
Brian McGowan
|
|
|
needed wall/building ssection detailing handstacked roof. Need detail on foundation design and information on meeting energy code.
|
Routing - PLAN CHECK | 3/27/2017 | | 3/27/2017 | | FAIL |
Brian McGowan
|
|
|
needed wall/building ssection detailing handstacked roof. Need detail on foundation design and information on meeting energy code.
|
Application received | | 3/27/2017 | | | |
|
|
|
|