Letter of compliance/Occupancy | | | 10/24/2017 | | DONE |
|
|
|
|
BLD-Final | 7/19/2017 | 7/20/2017 | 7/20/2017 | P | PASS |
Jim Storey
|
|
|
AJ Phone #: ###-####
|
DOC - Permit Finaled | 7/20/2017 | 7/20/2017 | 7/20/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 6/1/2017 | 6/2/2017 | 6/2/2017 | P | PASS |
Jim Storey
|
|
|
AJ Phone #: ###-####
|
Routing - MECHANICAL | 5/31/2017 | | 5/31/2017 | | PASS |
Troy James
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/31/2017 | | DONE |
|
|
|
Submitted manual j report has been approved.
|
BLD-Wall Bracing | 5/22/2017 | 5/22/2017 | 5/22/2017 | P | PASS |
Jim Storey
|
|
|
AJ Phone #: ###-####
|
Routing - PLAN CHECK | 5/16/2017 | | 5/17/2017 | | FAIL |
Troy James
|
|
|
The manual j report is incomplete. Talked to mechanical contractor and he said that he was not done with his design. The design went from ductless to ducted system.
|
Plan Modification Accepted | | | 5/16/2017 | | DONE |
|
|
|
manual J's submitted-took to Troy James
|
BLD-Foundation | 4/6/2017 | 4/7/2017 | 4/7/2017 | A | PASS |
Jim Storey
|
|
|
Ardi Phone #: ###-####
|
BLD-Foundation | 4/4/2017 | 4/4/2017 | 4/4/2017 | P | PASS |
Jim Storey
|
|
|
ARDI Phone #: ###-####
|
OVERRIDE | | | 3/29/2017 | | |
|
|
|
|
Telephone call | | | 3/29/2017 | | DONE |
|
|
|
called Monica to let know permit is ready and how much is owed
|
Issue PAID IN FULL permit | | | 3/29/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/29/2017 | | DONE |
|
|
|
MET
|
Routing Walk-In (Zoning) | 3/28/2017 | 3/28/2017 | 3/28/2017 | A | DONE |
Christina Prado
|
|
|
|
Routing Walk-In (BLD) | 3/28/2017 | 3/28/2017 | 3/28/2017 | P | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 3/28/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 3/28/2017 | | 3/28/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 3/28/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 3/28/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/28/2017 | | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 3/28/2017 | | FAIL |
Brian McGowan
|
|
|
Need Manual J for new furnace and duct work. They will email me the Manual J. I have the hard copy plans. Switched to ductless system.
|
Routing - PLAN CHECK | 3/28/2017 | | 3/28/2017 | | FAIL |
Brian McGowan
|
|
|
Need Manual J for new furnace and duct work. They will email me the Manual J. I have the hard copy plans. (switched to ductless system)
|
Meeting | | | 3/28/2017 | | DONE |
|
|
|
customer has elected to switch from online to paper submittal
|
Application received | | | 3/27/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 27 2017 2:12PM
|
Plans ACCEPTED BY PLAN TECH | | | 3/27/2017 | | DONE |
|
|
|
|
Intake Approval | | | 3/27/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/27/2017 | | DONE |
|
|
|
no fees taken in at submittal
|