First Notice | | 7/15/2017 | 8/10/2017 | | DONE |
|
|
|
Mailed 8-11
|
BLD-Final | 7/5/2017 | 7/5/2017 | 7/5/2017 | P | PASS |
Jim Sly
|
|
|
Eric Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 7/5/2017 | 7/5/2017 | 7/5/2017 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Permanent Occupancy | | | 7/5/2017 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 5/30/2017 | 5/30/2017 | 5/31/2017 | P | PASS |
Jim Sly
|
|
|
Eric Phone #: ###-####
|
BLD-Framing/Rough-in | 5/24/2017 | 5/25/2017 | 5/25/2017 | A | NR |
Jim Sly
|
|
|
Eric Phone #: ###-#### Need Firestopping and pre rock at canlights...ceiling and areas of rated walls.
|
Case Summary (BLD) | | | 5/25/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/25/2017 | | |
|
|
|
|
Permit Ready to Issue | | | 5/25/2017 | | DONE |
|
|
|
all req. met - Plan mod, DO NOT REISSUE
|
Telephone call | | | 5/25/2017 | | DONE |
Christina Prado
|
|
|
called Robin to advise plan mod was ready for pick up and gave fees due
|
(F) Reprint permit | | | 5/25/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/25/2017 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 5/17/2017 | 5/17/2017 | 5/24/2017 | | PASS |
Carl Westfall
|
|
|
(1b) (1st done) Webmarkets plan mod
|
Routing - PLAN CHECK | 5/17/2017 | | 5/24/2017 | | PASS |
Carl Westfall
|
|
|
Plan mod approved with conditions
|
Routing PW Sewer Rating | 5/24/2017 | | 5/24/2017 | | PASS |
Rachael Beierle
|
|
|
Stub out for future toilet
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/24/2017 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 5/17/2017 | | DONE |
|
|
|
plan mod accepted to add waste pipe for future toilet; taken to Carl W.
|
Issue PAID IN FULL permit | | | 5/9/2017 | | DONE |
|
|
|
|
Route to Impact Fee Review | 4/28/2017 | 5/3/2017 | 5/2/2017 | | PASS |
Eric Bilimoria
|
|
|
|
Permit Ready to Issue | | | 5/2/2017 | | DONE |
|
|
|
Need revised cert of value, GC form, and ACHD
|
Telephone call | | | 5/2/2017 | | DONE |
|
|
|
Left a message for Robyn informing this permit is ready to be picked up and that we would need the GC to fill out a 302 and 306 and we would also need ACHD
|
Plan assigned to (CJW) | 3/29/2017 | 3/29/2017 | 4/28/2017 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 4/3/2017 | | 4/28/2017 | | PASS |
Carl Westfall
|
|
|
Committment letter from the adjacent tenant allowing the use of their restrooms uploaded.
|
Routing - FIRE | 4/27/2017 | | 4/28/2017 | | PASS |
Katie Marron
|
|
|
No comments required. See IBC Plan review report.
|
Routing - PLAN CHECK | 4/28/2017 | | 4/28/2017 | | DONE |
Carl Westfall
|
|
|
back from fire
|
1st review completed | | | 4/28/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/28/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/28/2017 | | |
|
|
|
|
Plan resubmittals received | | | 4/10/2017 | | DONE |
|
|
|
Two copies of sheets A.0,A.1 and A.2 Taken to Carl W
|
Routing - MECHANICAL | 3/29/2017 | | 4/3/2017 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 3/29/2017 | | 3/31/2017 | | |
Andy J. Long
|
|
|
No permit require
|
Routing - Addressing | 3/29/2017 | | 3/29/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 3/29/2017 | | 3/29/2017 | | PASS |
Morgan Webb
|
|
|
|
Pending Assignment by AJS | 3/28/2017 | | 3/29/2017 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/28/2017 | | DONE |
|
|
|
|
Intake Approval | | | 3/28/2017 | | PASS |
|
|
|
as per Dave Ferguson
|
Recd Pcfee & Taken To Pln CK | | | 3/28/2017 | | DONE |
|
|
|
|
Application received | | 3/28/2017 | | | |
|
|
|
|