Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD17-00823
StatusFinaled
Name WOOD RIVER BUILDERS
Site Address 1560 E NINES POINT LN
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone A - all exterior alterations to comply with current WUI requirements. Permit to replace exterior raised deck/blacony concrete surface and floor decking due to dry wrought. Contractor will replace with WUI conpliant materials without adding additional weight to the existing structure. Also, interior alteration of the daylight basement will consist of removing select non-loadbearing walls and create an additional bedroom in the basement. On the main floor work will consist of reconfiguring the steps in the great room and living room area. No other work such as the elevator shaft or the stair case is covered under thiws building permit. Permit(s) for those alterations will be pulled separately. Engineering for the elevator foundation and wall construction will be required. Electrical, plumbing and HVAC permits will be pulled separately. **DAF**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/29/201711/29/201711/29/2017PPASS
DetailsTony Young
Mike Phone #: ###-#### or call Shawn ###-####
DOC - Permit Finaled11/29/201711/29/201711/29/2017PPASS
DetailsTony Young
BLD-Aging Inspection8/23/20178/23/20178/23/2017 PEND
DetailsTony Young
BLD-Aging Inspection8/22/20178/22/20178/23/2017 PEND
DetailsTony Young
BLD-Energy code compliance4/10/20174/10/20174/10/2017PPASS
DetailsTony Young
shawn Bailey Phone #: ###-#### Inspection requested via web by Todd Blackwell
BLD-Framing/Rough-in4/5/20174/5/20174/5/2017PPASS
DetailsTony Young
shawn bailey Phone #: ###-#### Inspection requested via web by Todd Blackwell,, ok to insulate
BLD-Framing/Rough-in3/30/20173/30/20173/30/2017ANR
DetailsTony Young
Tom Phone #: ###-####,, walk through only
BLD-Framing/Rough-in3/29/20173/29/20173/30/2017PDEFR
DetailsTony Young
Tom Phone #: ###-#### out of time rescheduled for tomorrow am
Routing Walk-In (BLD)3/30/20173/30/20173/30/2017AFAIL
DetailsTisha Gallop
per DAF need engineering for existing shaft wall to verify structural
CHANGE STATUS TO (ISS)  3/30/2017 DONE
plan modification denied. original scope of work still applies
Routing - MECHANICAL3/30/2017 3/30/2017 PASS
DetailsTroy James
manual j report
Plan Modification Accepted  3/30/2017 DONE
modifications being made to the interior of the home
Routing Walk-In (BLD)3/29/20173/29/20173/29/2017APASS
DetailsDavid Ferguson
Plan assigned to (DAF)3/29/20173/29/20173/29/2017 DONE
DetailsDavid Ferguson
Routing - PLAN CHECK3/29/2017 3/29/2017 PASS
DetailsDavid Ferguson
Case Summary (BLD)  3/29/2017 DONE
DetailsDavid Ferguson
Inspection Record Card- Bld  3/29/2017 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  3/29/2017 DONE
Permit Ready to Issue  3/29/2017 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  3/29/2017 DONE
DetailsChristina Prado
1st review completed  3/29/2017 DONE
DetailsDavid Ferguson
Application received 3/29/2017