Second Notice | | 2/22/2018 | 2/21/2018 | | DONE |
|
|
|
This permit finaled on the web by Delbert Parry
|
First Notice | | 2/11/2018 | 2/12/2018 | | DONE |
|
|
|
Mailed 2-13-18
|
Print Occupancy Form | | | 2/1/2018 | | DONE |
|
|
|
|
Permanent Occupancy | | | 2/1/2018 | | DONE |
|
|
|
|
BLD-Final | 1/24/2018 | 1/25/2018 | 1/25/2018 | P | PASS |
Mike Jordan
|
|
|
Please call ahead for access - Robert Phone #: ###-####. All isues resolved. ok for perm occ. No card on site to sign.
|
Zoning Approval | 1/24/2018 | 1/24/2018 | 1/24/2018 | | PASS |
Sarah Schafer
|
|
|
|
BLD-Final | 1/23/2018 | 1/23/2018 | 1/23/2018 | P | FAIL |
Mike Jordan
|
|
|
please call before // Delbert Phone #: ###-####. Provide rated attic acces, remove the keyed hardware from the secondary door, lower breakroom cabinant and needs zoninf final.
|
FIRE-Final Inspection | 1/19/2018 | 1/22/2018 | 1/22/2018 | A | PASS |
Scott Arellano
|
|
|
Inspection passed. No sign off card on site.
|
BLD-Energy code compliance | 10/4/2017 | 10/5/2017 | 10/5/2017 | A | PASS |
Mike Jordan
|
|
|
Delbert Phone #: ###-####
|
BLD-Framing/Rough-in | 10/3/2017 | 10/3/2017 | 10/3/2017 | P | PASS |
Mike Jordan
|
|
|
call when on way to meet // Delbert Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 10/3/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 9/25/2017 | | |
|
|
|
|
Permit Ready to Issue | | | 9/25/2017 | | DONE |
|
|
|
DO NOT REISSUE plan mod, fees due; all requirements met
|
Plan assigned to (CJW) | 9/22/2017 | 9/22/2017 | 9/23/2017 | | PASS |
Carl Westfall
|
|
|
Plan mod to remove drinking fountain
|
Plan Reviewer's activity | | | 9/23/2017 | | DONE |
Carl Westfall
|
|
|
Plan mod approved
|
Plan Modification Accepted | | | 9/22/2017 | | DONE |
Christina Prado
|
|
|
Plan mod to eliminate drinking fountain and other interior design changes
|
Routing - PLAN CHECK | 9/22/2017 | | 9/22/2017 | | PASS |
Carl Westfall
|
|
|
|
Routing PW Sewer Rating | 9/22/2017 | | 9/22/2017 | | PASS |
Morgan Webb
|
|
|
drinking fountains removed. CREDIT FOR MODIFICATION. FEES ARE ALREADY PAID.
|
BLD-Other | 8/31/2017 | 8/31/2017 | 8/31/2017 | P | DONE |
Mike Jordan
|
|
|
Ryan Phone #: ###-####. Verified install of vapor barrier prior to slab on grade being placed.
|
Issue PAID IN FULL permit | | | 8/21/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/21/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 7/20/2017 | | |
|
|
|
|
Plan assigned to (CJW) | 4/18/2017 | 4/18/2017 | 7/20/2017 | | PASS |
Carl Westfall
|
|
|
(1st done) (May 8 - 15 days) (16 drawings) CDMD Properties
|
Routing - PLAN CHECK | 7/18/2017 | | 7/20/2017 | | PASS |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/20/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/20/2017 | | DONE |
Christina Prado
|
|
|
***ALL MEY 7-25-17 CAN******received the GC form & rev cert of val 7-21-17 CAN***Need RP, GC Form & Revised Certificate of Value for issuance
|
Plan resubmittals received | | | 7/18/2017 | | DONE |
|
|
|
|
Route to Impact Fee Review | 5/27/2017 | 5/30/2017 | 6/5/2017 | | PASS |
Marissa Taylor
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 5/27/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 5/27/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/18/2017 | | 5/27/2017 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required. (9 days over timeframe).
|
Routing PW Environmental | 4/19/2017 | | 4/26/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - FIRE | 4/18/2017 | 4/18/2017 | 4/21/2017 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing - Design Review | 4/18/2017 | | 4/20/2017 | | PASS |
Sarah Schafer
|
|
|
Approved per CZC17-00292.
|
Routing - PUBLIC WORKS | 4/18/2017 | | 4/19/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 4/18/2017 | | 4/19/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved.
|
Routing - MECHANICAL | 4/18/2017 | | 4/18/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 4/18/2017 | | 4/18/2017 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - Addressing | 4/18/2017 | | 4/18/2017 | | PASS |
Laura Hunter
|
|
|
|
Plan Reviewer's activity | | | 4/18/2017 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
Matt, Please contact ACHD in regards to any additional fees that may be due for this project. This is the first time tenant build out, the core and shell was submitted as an office building. Medical office buildings have a higher rate on ACHD fee chart than a standard office.
Thank you
Adele Schaffeld-Griffin
Assistant Building Official / Plan Review Manager
Planning & Development Services Department
City of Boise - 150 N. Capitol Blvd.
P.O. Box 500
Boise, ID 83701
Office ###-####
Email – aschaffeldgriffin@cityofboise.org
“Building Boise Together.”
|
Intake Approval | | | 4/18/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Julie completed pre screen, verified fees paid
|
Intake Approval | | | 4/11/2017 | | FAIL |
Julie Romig
|
|
|
Need Form #520 Checklist - Completed and signed.
|
Intake Approval | | | 4/3/2017 | | FAIL |
Julie Romig
|
|
|
Major Tenant Improvement, not a Minor TI. Please submit completed Form #520 Checklist and all applicable documents including but not limited to the following items (new application is not needed):
1. Site specific fire flow at hydrants letter;
2. Zoning Certificate approval for new exterior door;
3. Drawings need to be renamed with correct naming convention. Sheets have been deleted so they can be re-uploaded.
Zoning Certificate Application #123 must be submitted and approved prior to applying for the building permit. Please contact Sarah Schafer at ###-#### for additional information.
|
Application received | | | 3/29/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 29 2017 10:15AM
|