BLD-Final | 6/14/2018 | 6/15/2018 | 6/15/2018 | A | PASS |
Jim Sly
|
|
|
Jim Phone #: ###-####
|
DOC - Permit Finaled | 6/15/2018 | 6/15/2018 | 6/15/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Footing | 2/13/2018 | 2/13/2018 | 2/13/2018 | P | PASS |
Jim Storey
|
|
|
front columns // Jim Thompson Phone #: ###-####
|
BLD-Energy code compliance | 1/29/2018 | 1/29/2018 | 1/29/2018 | P | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 1/29/2018 | 1/29/2018 | 1/29/2018 | P | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 1/25/2018 | 1/25/2018 | 1/25/2018 | P | PART |
Jim Storey
|
|
|
Jim Thompson Phone #: ###-#### four ply girder timber lock screws required at panel points/ ceilling fireblk/ blk and nail portal frame. stud by hvac vent kitchen.
|
Plan Modification Accepted | | | 1/23/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 1/23/2018 | | 1/23/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Framing/Rough-in | 1/19/2018 | 1/19/2018 | 1/19/2018 | P | CANC |
Jim Storey
|
|
|
Jim Phone #: ###-####
|
BLD-Other | 11/6/2017 | 11/6/2017 | 11/6/2017 | P | PART |
Jim Storey
|
|
|
fir up floor framing inspection // Jim Thompson Phone #: ###-#### floor ok to cover/ vented crawl space
|
BLD-Foundation | 10/9/2017 | 10/9/2017 | 10/9/2017 | P | PASS |
Jim Storey
|
|
|
Jim Thompson Phone #: ###-####
|
BLD-Footing | 10/2/2017 | 10/2/2017 | 10/2/2017 | P | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-####
|
Routing Walk-In (BLD) | 9/7/2017 | 9/7/2017 | 9/7/2017 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 7/18/2017 | 7/18/2017 | 9/7/2017 | | PASS |
Josh Bogle
|
|
|
1st done - waiting for more structural info from applicant
|
Routing - PLAN CHECK | 9/7/2017 | | 9/7/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/7/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/7/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/7/2017 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes - Value added
|
Permit Ready to Issue | | | 9/7/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/7/2017 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 9/5/2017 | 9/5/2017 | 9/5/2017 | A | FAIL |
Josh Bogle
|
|
|
Jim wiil add missing info to plans and bring them back in
|
Routing - PLAN CHECK | 8/31/2017 | | 8/31/2017 | | FAIL |
Josh Bogle
|
|
|
|
Plan resubmittals received | | | 8/21/2017 | | DONE |
|
|
|
turned in 2 sheets of #8 and #9 & eng calcs-customer gave to Brian after meeting with him
|
Routing Walk-In (BLD) | 8/16/2017 | 8/16/2017 | 8/16/2017 | A | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 8/15/2017 | | 8/15/2017 | | FAIL |
Josh Bogle
|
|
|
needs more detail, point load footings, braced walls note per code
|
Routing Walk-In (BLD) | 8/14/2017 | 8/14/2017 | 8/14/2017 | A | PASS |
Josh Bogle
|
|
|
took in for plan review
|
Routing - PLAN CHECK | 7/18/2017 | | 7/21/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - MECHANICAL | 7/18/2017 | | 7/19/2017 | | PASS |
Troy James
|
|
|
|
Routing Walk-In (Zoning) | 7/18/2017 | 7/18/2017 | 7/18/2017 | P | PASS |
Colleen T Carroll
|
|
|
Adding on to home/ plan modification
|
Routing Walk-In (BLD) | 7/18/2017 | 7/18/2017 | 7/18/2017 | P | PASS |
Josh Bogle
|
|
|
Applicant wants to Modify permit to show proposed work. Took in as level 2, routed to myself & mechanical. Discussed some likely plan deficiencies with applicant. JAB
|
Routing Walk-In (BLD) | 3/29/2017 | 3/29/2017 | 3/29/2017 | P | DONE |
David Ferguson
|
|
|
|
1st review completed | | | 3/29/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 3/29/2017 | | 3/29/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 3/29/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 3/29/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/29/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 3/29/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/29/2017 | | DONE |
|
|
|
|
Application received | | 3/29/2017 | | | |
|
|
|
|