WUI Zone A - Class "A" Roof Required** Permit to construct a 1128 sq. ft. 2 story addition. The main floor of the addition will contain 2 bedrroms a full bath and a laundry room. The upstairs will contain an office, computer room and a bonus room. The work will be performed per the approved plans, attached engineering and local codes. Electrical and plumbing permits will be pulled separately. **DAF**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/15/20185/16/20185/16/2018ANR
DetailsDave Hannah
John Phone #: ###-####
BLD-Energy code compliance8/9/20178/10/20178/10/2017APASS
DetailsBrandon Shaw
john Phone #: ###-####
BLD-Framing/Rough-in8/4/20178/4/20178/4/2017PPEND
DetailsDave Hannah
John Phone #: ###-#### ok to insulate after mec rough in is signed off
BLD-Footing5/4/20175/4/20175/7/2017PPASS
DetailsDave Hannah
As late as possible Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo lira
BLD-Foundation5/4/20175/5/20175/5/2017APASS
DetailsDave Hannah
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo lira
OVERRIDE  4/17/2017  
Routing Walk-In (BLD)4/17/20174/17/20174/17/2017PDONE
DetailsJason C. Taylor
Routing Walk-In (PW Hillside)4/17/20174/17/20174/17/2017PPASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Plan assigned to (DAF)4/17/20174/17/20174/17/2017 DONE
DetailsDavid Ferguson
Routing - PLAN CHECK4/17/2017 4/17/2017 PASS
DetailsDavid Ferguson
Case Summary (BLD)  4/17/2017 DONE
DetailsDavid Ferguson
Inspection Record Card- Bld  4/17/2017 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  4/17/2017 DONE
Permit Ready to Issue  4/17/2017 DONE
1st review completed  4/17/2017 DONE
DetailsDavid Ferguson
Issue PAID IN FULL permit  4/17/2017 DONE
Routing Walk-In (Zoning)3/29/20173/29/20173/29/2017PDONE
DetailsSue Cummings
Routing Walk-In (BLD)3/29/20173/29/20173/29/2017PPASS
DetailsDavid Ferguson
Need engineering for foundation due to hillside, WUI details for eave vents, engineering for bracing and other structural, slab insulation detail.
Application received 3/29/2017