Routing - Design Review | 3/19/2018 | | 3/19/2018 | | FAIL |
Andrea Tuning
|
|
|
Provide a minimum of 1 bicycle parking stall on the site that meets the location and dimensional standards of Boise City Code.
Add the required Class II tree within the terminal planter in the southeast corner of the site.
Connect the two pedestrian sidewalks to create an interconnected pedestrian network.
|
BLD-Aging Inspection | 2/16/2018 | 2/16/2018 | 2/16/2018 | | PASS |
Jim Storey
|
|
|
Expires: 04/03/1 ele open
|
Permit Ready to Issue | | | 4/3/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/3/2017 | | DONE |
|
|
|
|
Plan assigned to (DAF) | 3/31/2017 | 3/31/2017 | 3/31/2017 | | DONE |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 3/31/2017 | | 3/31/2017 | | PASS |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/31/2017 | | DONE |
|
|
|
|
Intake Approval | | | 3/31/2017 | | PASS |
David Ferguson
|
|
|
|
1st review completed | | | 3/31/2017 | | DONE |
David Ferguson
|
|
|
|
Application received | | | 3/30/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 30 2017 9:03AM
|