BLD-Final | 1/8/2018 | 1/10/2018 | 1/10/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 1/10/2018 | 1/10/2018 | 1/10/2018 | P | PASS |
Brandon Shaw
|
|
|
|
Plan assigned to (BJM) | 1/8/2018 | 1/8/2018 | 1/10/2018 | | DONE |
Brian McGowan
|
|
|
Plan MOD
|
Routing - PLAN CHECK | 1/9/2018 | | 1/10/2018 | | PASS |
Brian McGowan
|
|
|
plan mod for drainage. As approved by JCT
|
PubWorks Occupancy Approval | 1/9/2018 | 1/9/2018 | 1/9/2018 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department Jason Taylor ###-####.
|
Routing PW Grading-Hillside | 1/9/2018 | | 1/9/2018 | | PASS |
Jason C. Taylor
|
|
|
approved grading modification. JCT
|
BLD-Final | 1/8/2018 | 1/9/2018 | 1/8/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
|
CHANGE STATUS TO (REV) | | | 1/8/2018 | | DONE |
Christina Prado
|
|
|
Plan MOD
|
Plan Modification Accepted | | | 1/8/2018 | | DONE |
Christina Prado
|
|
|
Plan Mod to upload new drainage sheets as requested by JCT. Route to Building & PW Hillside
|
BLD-Final | 12/18/2017 | 12/20/2017 | 12/19/2017 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
|
BLD-Energy code compliance | 10/10/2017 | 10/13/2017 | 10/13/2017 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 10/10/2017 | 10/11/2017 | 10/11/2017 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Wall Bracing | 9/25/2017 | 9/25/2017 | 9/26/2017 | P | PASS |
Brandon Shaw
|
|
|
Guillermo Phone #: ###-####
|
BLD-Foundation | 6/14/2017 | 6/15/2017 | 6/15/2017 | A | PASS |
Brandon Shaw
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
BLD-Foundation | 6/13/2017 | 6/14/2017 | 6/13/2017 | A | CANC |
Brandon Shaw
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Inspection cancelled via mobile web on Tuesday, June 13, 2017.
|
BLD-Footing | 6/12/2017 | 6/13/2017 | 6/13/2017 | P | PASS |
Brandon Shaw
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
PubWorks Subgrade Approval | 6/12/2017 | 6/12/2017 | 6/12/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 5/16/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/16/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 5/11/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 4/27/2017 | 4/27/2017 | 5/11/2017 | | DONE |
Brian McGowan
|
|
|
FAIL - 4-28 - Top of footing and top of foundation wall need to be specified on foundation. Hillside also failed it. Waiting for JCT to review
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/11/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 5/11/2017 | | DONE |
|
|
|
all met
|
Routing PW Grading-Hillside | 5/10/2017 | | 5/10/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PLAN CHECK | 5/7/2017 | | 5/7/2017 | | PASS |
Brian McGowan
|
|
|
|
Plan assigned to (DAF) | 4/6/2017 | 4/6/2017 | 4/28/2017 | | DEFR |
David Ferguson
|
|
|
due 4/25
|
1st review completed | | | 4/28/2017 | | FAIL |
Brian McGowan
|
|
|
Top of footing and top of foundation wall need to be specified on foundation.
|
Routing - PLAN CHECK | 4/6/2017 | | 4/28/2017 | | FAIL |
Brian McGowan
|
|
|
Top of footing and top of foundation wall need to be specified on foundation.
|
Routing PW Grading-Hillside | 4/6/2017 | | 4/12/2017 | | FAIL |
Jason C. Taylor
|
|
|
see changemarks in eplan. JCT
|
Routing - PLANNING | 4/6/2017 | | 4/12/2017 | | PASS |
Sue Cummings
|
|
|
E-mailed applicant 4/6/17 re: driveway issues. Waiting for reply. SC. Applicant returned e-mail. said he'd take some pics of the existing driveway and show me it's done. 4/10/17
|
Route to Impact Fee Review | 4/6/2017 | 4/9/2017 | 4/7/2017 | | PASS |
Tonya Wallace
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 4/6/2017 | 4/6/2017 | 4/7/2017 | | PASS |
Katie Marron
|
|
|
Plans were reviewed for FD Access, Hydrant availability and defensible space.
|
Routing - MECHANICAL | 4/6/2017 | | 4/7/2017 | | PASS |
Troy James
|
|
|
|
Plan assigned to (AJS) | 4/6/2017 | 4/6/2017 | 4/6/2017 | | DEFR |
Adele J Schaffeld-Griffin
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/6/2017 | | DONE |
|
|
|
|
Intake Approval | | | 4/6/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/6/2017 | | DONE |
|
|
|
|
Routing - Addressing | 4/6/2017 | | 4/6/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 4/6/2017 | | 4/6/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 4/6/2017 | | 4/6/2017 | | PASS |
Andy J. Long
|
|
|
Waiver letter approved
|
Application received | | | 3/30/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 30 2017 10:09AM
|