BLD-Final | 1/8/2018 | 1/10/2018 | 1/10/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 1/10/2018 | 1/10/2018 | 1/10/2018 | P | PASS |
Brandon Shaw
|
|
|
|
Plan assigned to (BJM) | 1/8/2018 | 1/8/2018 | 1/10/2018 | | DONE |
Brian McGowan
|
|
|
Plan MOD. As approved by JCT
|
Routing - PLAN CHECK | 1/9/2018 | | 1/10/2018 | | PASS |
Brian McGowan
|
|
|
plan mod for drainage. As approved by JCT
|
PubWorks Occupancy Approval | 1/9/2018 | 1/9/2018 | 1/9/2018 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department Jason Taylor ###-####.
|
Routing PW Grading-Hillside | 1/9/2018 | | 1/9/2018 | | PASS |
Jason C. Taylor
|
|
|
approved grading modification. JCT
|
BLD-Final | 1/8/2018 | 1/9/2018 | 1/8/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
|
CHANGE STATUS TO (REV) | | | 1/8/2018 | | DONE |
Christina Prado
|
|
|
Plan MOD
|
Plan Modification Accepted | | | 1/8/2018 | | DONE |
Christina Prado
|
|
|
Plan Mod to upload new drainage sheets as requested by JCT. Route to Building & PW Hillside
|
BLD-Final | 1/4/2018 | 1/4/2018 | 1/4/2018 | P | CANC |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 11/2/2017 | 11/3/2017 | 11/3/2017 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 10/30/2017 | 11/1/2017 | 11/1/2017 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Wall Bracing | 10/13/2017 | 10/13/2017 | 10/13/2017 | P | PASS |
Brandon Shaw
|
|
|
Shear // Guillermo Phone #: ###-####
|
BLD-Footing | 8/17/2017 | 8/17/2017 | 8/17/2017 | P | PASS |
Brandon Shaw
|
|
|
pat Phone #: ###-####
|
PubWorks Subgrade Approval | 8/16/2017 | 8/16/2017 | 8/16/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
CHANGE STATUS TO (ISS) | | | 8/10/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/10/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 8/9/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 6/26/2017 | 6/26/2017 | 8/9/2017 | | DONE |
Brian McGowan
|
|
|
1st review complete - fail- needs grading plan -plan mod to flip house; routed to planning, hillside, mech, building
|
Routing - PLAN CHECK | 6/26/2017 | | 8/9/2017 | | PASS |
Brian McGowan
|
|
|
waiting for grading resubmittal
|
Permit Ready to Issue | | | 8/9/2017 | | DONE |
Christina Prado
|
|
|
All requirements met for plan mod, fees due
Change status to ISS once all fees paid in full. DO NOT RE-ISSUE
|
Routing PW Grading-Hillside | 8/2/2017 | | 8/2/2017 | | PASS |
Jason C. Taylor
|
|
|
Approved house flip, new grading plan approved. JCT
|
Routing PW Grading-Hillside | 6/28/2017 | | 6/28/2017 | | FAIL |
Jason C. Taylor
|
|
|
Need revised grading plan. JCT
|
Routing - MECHANICAL | 6/27/2017 | | 6/27/2017 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 6/26/2017 | | 6/26/2017 | | FAIL |
Troy James
|
|
|
plan mod to flip house
emailed designer to show the house being flipped.
|
Routing - PLANNING | 6/26/2017 | | 6/26/2017 | | PASS |
Colleen T Carroll
|
|
|
plan mod to flip house
|
Plan Modification Accepted | | | 6/15/2017 | | DONE |
Christina Prado
|
|
|
Plan Mod requested to flip home, need to route back to building, planning, mechanical and hillside (?)
|
CHANGE STATUS TO (REV) | | | 6/15/2017 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 5/25/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/25/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 5/24/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 5/1/2017 | 5/1/2017 | 5/24/2017 | | DONE |
Brian McGowan
|
|
|
Level 2 ePlan
|
1st review completed | | | 5/24/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/24/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/24/2017 | | DONE |
|
|
|
all requirements met
|
Routing - PLAN CHECK | 4/6/2017 | | 5/24/2017 | | PASS |
Brian McGowan
|
|
|
|
Plan assigned to (DAF) | 4/6/2017 | 4/6/2017 | 5/2/2017 | | DONE |
David Ferguson
|
|
|
due 4/25
|
Routing PW Grading-Hillside | 4/6/2017 | | 4/20/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Route to Impact Fee Review | 4/6/2017 | 4/9/2017 | 4/7/2017 | | PASS |
Tonya Wallace
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 4/6/2017 | 4/6/2017 | 4/7/2017 | | PASS |
Katie Marron
|
|
|
Plans were reviewed for FD access, hydrant availability and defensible space.
|
Routing - MECHANICAL | 4/6/2017 | | 4/7/2017 | | PASS |
Troy James
|
|
|
|
Plan assigned to (AJS) | 4/6/2017 | 4/6/2017 | 4/6/2017 | | DEFR |
Adele J Schaffeld-Griffin
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/6/2017 | | DONE |
|
|
|
|
Intake Approval | | | 4/6/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/6/2017 | | DONE |
|
|
|
|
Routing - PLANNING | 4/6/2017 | | 4/6/2017 | | PASS |
Jeff Lowe
|
|
|
|
Routing - Addressing | 4/6/2017 | | 4/6/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 4/6/2017 | | 4/6/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 4/6/2017 | | 4/6/2017 | | PASS |
Andy J. Long
|
|
|
Waiver letter approved
|
Application received | | | 3/30/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 30 2017 10:17AM
|
BLD-Conference | 1/4/2018 | 1/4/2018 | | P | |
Alexandra L. DeYoung
|
|
|
|