Permit Information
Permit NumberBLD17-00848
StatusFinaled
Name TAHOE HOMES LLC
Site Address 5304 S HAKKASAN AVE
Project NameSkyline 17A
Customer Number 
ePlanReviewYes
Description
** Final Drainage Plan Approval 1-9-18 ** Hillside, WUI Valley, Zone "A" requirements, Class "A" roof required. Permit for the construction of a new 2720 sq. ft., two story (first story 1259 sq. ft., second story 1461 sq. ft.) single family dwelling with 5 bedrooms, 3.5 bathrooms, approximately 191 sq. ft. of covered patio/porch and a 752 sq. ft. attached garage per the approved plans. R-1C/DA zoning and setbacks per planning. ***BJM*** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 608-7168.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection2/9/20182/9/20182/9/2018 PASS
DetailsBrandon Shaw
DOC - Permit Finaled2/9/20182/9/20182/9/2018PPASS
DetailsBrandon Shaw
CHANGE STATUS TO (ISS)  1/22/2018 DONE
OVERRIDE  1/16/2018  
Permit Ready to Issue  1/16/2018 DONE
Plan mod DO NOT RE ISSUE. NO FEES DUE, BUT PENDING ON FINAL INSPECTION
Plan assigned to (BJM)1/8/20181/8/20181/10/2018 DONE
DetailsBrian McGowan
Plan MOD. As approved by JCT
Routing - PLAN CHECK1/9/2018 1/10/2018 PASS
DetailsBrian McGowan
plan mod for drainage. As approved by JCT
PubWorks Occupancy Approval1/9/20181/9/20181/9/2018 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department Jason Taylor ###-####.
Routing PW Grading-Hillside1/9/2018 1/9/2018 PASS
DetailsJason C. Taylor
modification approved. JCT
CHANGE STATUS TO (REV)  1/8/2018 DONE
DetailsChristina Prado
Plan MOD
Plan Modification Accepted  1/8/2018 DONE
DetailsChristina Prado
Plan Mod to upload new drainage sheets as requested by JCT. Route to Building & PW Hillside
BLD-Final12/26/201712/26/201712/26/2017APEND
DetailsBrandon Shaw
Building final good, waiting or PW final
BLD-Final12/18/201712/20/201712/19/2017ACANC
DetailsBrandon Shaw
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
BLD-Energy code compliance9/26/20179/28/20179/28/2017APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in9/25/20179/26/20179/26/2017APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Other9/11/20179/12/20179/12/2017APASS
DetailsBrandon Shaw
Luna-soffits Phone #: ###-####
BLD-Wall Bracing9/8/20179/8/20179/8/2017PPASS
DetailsBrandon Shaw
BLD-Footing6/1/20176/2/20176/2/2017APASS
DetailsBrandon Shaw
Pat Phone #: ###-####
PubWorks Subgrade Approval6/1/20176/1/20176/1/2017 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  5/25/2017 DONE
Inspection Record Card- Bld  5/25/2017 DONE
OVERRIDE  5/24/2017  
Plan assigned to (BJM)4/19/20174/19/20175/24/2017 DONE
DetailsBrian McGowan
Due 5-8 Level 2
1st review completed  5/24/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  5/24/2017 DONE
MET
Routing - PLAN CHECK4/19/2017 5/24/2017 PASS
DetailsBrian McGowan
Route to Impact Fee Review4/19/20174/22/20174/24/2017 PASS
DetailsTonya Wallace
Initial residential review of new SFD permits requested for now.
Routing - FIRE4/19/20174/19/20174/24/2017 PASS
DetailsKatie Marron
Plans were reviewed for fd access, hydrant availability and defensible space. Per Assistant Fire Marshall this lot uses the common lot for part of its defensible space requirement.
Routing PW Grading-Hillside4/19/2017 4/21/2017 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - Erosion and Sediment4/19/2017 4/21/2017 PASS
DetailsAndy J. Long
ESC plan waiver contract pre-approved for East Valley SFHs by Tahoe. Valid RP.
Routing - MECHANICAL4/19/2017 4/20/2017 PASS
DetailsTroy James
Plan assigned to (AJS)4/19/20174/19/20174/19/2017 DEFR
DetailsAdele J Schaffeld-Griffin
Plans ACCEPTED BY PLAN TECH  4/19/2017 DONE
Intake Approval  4/19/2017 PASS
Recd Pcfee & Taken To Pln CK  4/19/2017 DONE
Routing - PLANNING4/19/2017 4/19/2017 PASS
DetailsSue Cummings
Routing - Addressing4/19/2017 4/19/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS4/19/2017 4/19/2017 PASS
DetailsMorgan Webb
Application received  3/30/2017 DONE
Application submitted via PDS Online on Mar 30 2017 10:26AM