BLD-Aging Inspection | 2/9/2018 | 2/9/2018 | 2/9/2018 | | PASS |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 2/9/2018 | 2/9/2018 | 2/9/2018 | P | PASS |
Brandon Shaw
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/22/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 1/16/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 1/16/2018 | | DONE |
|
|
|
Plan mod DO NOT RE ISSUE. NO FEES DUE, BUT PENDING ON FINAL INSPECTION
|
Plan assigned to (BJM) | 1/8/2018 | 1/8/2018 | 1/10/2018 | | DONE |
Brian McGowan
|
|
|
Plan MOD. As approved by JCT
|
Routing - PLAN CHECK | 1/9/2018 | | 1/10/2018 | | PASS |
Brian McGowan
|
|
|
plan mod for drainage. As approved by JCT
|
PubWorks Occupancy Approval | 1/9/2018 | 1/9/2018 | 1/9/2018 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department Jason Taylor ###-####.
|
Routing PW Grading-Hillside | 1/9/2018 | | 1/9/2018 | | PASS |
Jason C. Taylor
|
|
|
modification approved. JCT
|
CHANGE STATUS TO (REV) | | | 1/8/2018 | | DONE |
Christina Prado
|
|
|
Plan MOD
|
Plan Modification Accepted | | | 1/8/2018 | | DONE |
Christina Prado
|
|
|
Plan Mod to upload new drainage sheets as requested by JCT. Route to Building & PW Hillside
|
BLD-Final | 12/26/2017 | 12/26/2017 | 12/26/2017 | A | PEND |
Brandon Shaw
|
|
|
Building final good, waiting or PW final
|
BLD-Final | 12/18/2017 | 12/20/2017 | 12/19/2017 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
|
BLD-Energy code compliance | 9/26/2017 | 9/28/2017 | 9/28/2017 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 9/25/2017 | 9/26/2017 | 9/26/2017 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Other | 9/11/2017 | 9/12/2017 | 9/12/2017 | A | PASS |
Brandon Shaw
|
|
|
Luna-soffits Phone #: ###-####
|
BLD-Wall Bracing | 9/8/2017 | 9/8/2017 | 9/8/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Footing | 6/1/2017 | 6/2/2017 | 6/2/2017 | A | PASS |
Brandon Shaw
|
|
|
Pat Phone #: ###-####
|
PubWorks Subgrade Approval | 6/1/2017 | 6/1/2017 | 6/1/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 5/25/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/25/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 5/24/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 4/19/2017 | 4/19/2017 | 5/24/2017 | | DONE |
Brian McGowan
|
|
|
Due 5-8 Level 2
|
1st review completed | | | 5/24/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 5/24/2017 | | DONE |
|
|
|
MET
|
Routing - PLAN CHECK | 4/19/2017 | | 5/24/2017 | | PASS |
Brian McGowan
|
|
|
|
Route to Impact Fee Review | 4/19/2017 | 4/22/2017 | 4/24/2017 | | PASS |
Tonya Wallace
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 4/19/2017 | 4/19/2017 | 4/24/2017 | | PASS |
Katie Marron
|
|
|
Plans were reviewed for fd access, hydrant availability and defensible space. Per Assistant Fire Marshall this lot uses the common lot for part of its defensible space requirement.
|
Routing PW Grading-Hillside | 4/19/2017 | | 4/21/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - Erosion and Sediment | 4/19/2017 | | 4/21/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver contract pre-approved for East Valley SFHs by Tahoe. Valid RP.
|
Routing - MECHANICAL | 4/19/2017 | | 4/20/2017 | | PASS |
Troy James
|
|
|
|
Plan assigned to (AJS) | 4/19/2017 | 4/19/2017 | 4/19/2017 | | DEFR |
Adele J Schaffeld-Griffin
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/19/2017 | | DONE |
|
|
|
|
Intake Approval | | | 4/19/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/19/2017 | | DONE |
|
|
|
|
Routing - PLANNING | 4/19/2017 | | 4/19/2017 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 4/19/2017 | | 4/19/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 4/19/2017 | | 4/19/2017 | | PASS |
Morgan Webb
|
|
|
|
Application received | | | 3/30/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 30 2017 10:26AM
|