BLD-Final | 12/9/2017 | 12/12/2017 | 12/12/2017 | A | PASS |
Dave Hannah
|
|
|
Looks like we have our MECH final! REady to go for final c of o i hope! Key is in the mailbox for inspection. If possible, please call with approximate time for inspection and he will be there too. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
DOC - Permit Finaled | 12/12/2017 | 12/12/2017 | 12/12/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 12/7/2017 | 12/8/2017 | 12/8/2017 | A | NR |
Dave Hannah
|
|
|
Home is ready for final. Please call or text with approximate inspection time and I will gladly meet with you at the site as needed. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Final | 12/4/2017 | 12/6/2017 | 12/6/2017 | P | NR |
Dave Hannah
|
|
|
Inspection for final and C of O. Thanks, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
Zoning Approval | 12/4/2017 | 12/4/2017 | 12/4/2017 | | DONE |
Ted Vanegas
|
|
|
|
BLD-Conference | 11/28/2017 | 11/29/2017 | 11/29/2017 | A | DONE |
Dave Hannah
|
|
|
Would like a site meeting to discuss a couple items for completion. Please call to arrange a time to meet. I will be flexible to your schedule. thank you, steve 208.850.8424. Phone #: ###-#### Inspection requested via web by steve hanson winder stairs not to code
|
BLD-Framing/Rough-in | 8/17/2017 | 8/18/2017 | 8/18/2017 | P | PASS |
Dave Hannah
|
|
|
INspection for cut floor truss at laundry chute in basement. Please call with any questions. steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Energy code compliance | 8/15/2017 | 8/15/2017 | 8/15/2017 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Hanson
|
BLD-Framing/Rough-in | 8/9/2017 | 8/10/2017 | 8/10/2017 | P | PASS |
Brandon Shaw
|
|
|
Framing inspection done with insulation blaket in place- foam/caulk done prior to low voltage instalation. 1) Draft stop/ fire block Mech chace at basement and first floor
Procced at own risk
|
BLD-Framing/Rough-in | 8/8/2017 | 8/8/2017 | 8/8/2017 | P | NR |
Jim Storey
|
|
|
Framing inspection. Plans are near the fireplace. thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson Need all other trades rough in prior to framing
|
BLD-Framing/Rough-in | 8/2/2017 | 8/7/2017 | 8/7/2017 | P | FAIL |
Brandon Shaw
|
|
|
Need all other trades rough in prior to framing
|
BLD-Framing/Rough-in | 8/2/2017 | 8/4/2017 | 8/2/2017 | P | CANC |
Dave Hannah
|
|
|
Framing inspection. Please call with approximate time you will be at the site and we will try to attend. thank you, Mike. Phone #: ###-#### >> Inspection requested via web by steve hanson Inspection cancelled from web by: steve hanson
|
Routing - MECHANICAL | 8/2/2017 | | 8/2/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Other | 7/21/2017 | 7/24/2017 | 7/24/2017 | A | PASS |
Dave Hannah
|
|
|
Complaint of building materials blocking public sidewalk. sidewalk has been cleared
|
BLD-Wall Bracing | 7/20/2017 | 7/21/2017 | 7/21/2017 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Hanson
|
Plan Modification Accepted | | | 7/11/2017 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 7/11/2017 | | 7/11/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Foundation | 6/7/2017 | 6/8/2017 | 6/8/2017 | A | PASS |
Dave Hannah
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Location Lira
|
BLD-Footing | 6/6/2017 | 6/7/2017 | 6/7/2017 | A | PASS |
Dave Hannah
|
|
|
Phone #: 9495359 >> Inspection requested via mobile web by Ricardo
|
BLD-Foundation | 5/17/2017 | 5/18/2017 | 5/19/2017 | A | PASS |
Dave Hannah
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Lira
|
BLD-Footing | 5/8/2017 | 5/9/2017 | 5/9/2017 | A | PASS |
Dave Hannah
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo lira
|
BLD-Other | 5/1/2017 | 5/2/2017 | 5/2/2017 | A | PASS |
Dave Hannah
|
|
|
Erosion control and grading inspection please. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
OVERRIDE | | | 5/1/2017 | | |
|
|
|
|
Plan assigned to (DAF) | 4/3/2017 | 4/3/2017 | 5/1/2017 | | DONE |
David Ferguson
|
|
|
(1st done) due 4/12 - need addl. info and revised plan sheets
|
CHANGE STATUS TO (ISS) | | | 5/1/2017 | | DONE |
|
|
|
ready'd permit after issued
|
Routing - PLAN CHECK | 4/27/2017 | | 5/1/2017 | | PASS |
David Ferguson
|
|
|
DAF already had plans stamped and approved, just didn't sign off in Tidemark. Steve Hansen will e-mail me form 310 for fabrication of steel stairway.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/1/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/1/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/1/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/1/2017 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/28/2017 | | DONE |
David Ferguson
|
|
|
|
Plan resubmittals received | | | 4/27/2017 | | DONE |
|
|
|
received (4) copies of plan resubmittals
|
Routing - PLAN CHECK | 4/21/2017 | | 4/24/2017 | | FAIL |
David Ferguson
|
|
|
Need sheet A-1.4 revised to include essential structural beam and header call-outs.
|
Plan resubmittals received | | | 4/21/2017 | | DONE |
|
|
|
received (2) sets of plan resubmittals
|
1st review completed | | | 4/14/2017 | | DONE |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | | | 4/14/2017 | | FAIL |
David Ferguson
|
|
|
|
Plan Modification Accepted | | | 4/12/2017 | | DONE |
|
|
|
Revised manual J
|
Routing - MECHANICAL | 4/12/2017 | | 4/12/2017 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - MECHANICAL | | | 4/11/2017 | | FAIL |
Troy James
|
|
|
Emailed corrections to Ultimate heating and air
|
Routing - Design Review | | | 4/4/2017 | | PASS |
Ted Vanegas
|
|
|
DRH17-00020
|
Routing - PLANNING | 3/31/2017 | | 4/4/2017 | | PASS |
Ted Vanegas
|
|
|
|
Plan assigned to (AJS) | 3/30/2017 | 3/30/2017 | 4/3/2017 | | DEFR |
Adele J Schaffeld-Griffin
|
|
|
|
Route to Impact Fee Review | 3/30/2017 | 4/2/2017 | 3/31/2017 | | PASS |
Tonya Wallace
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 3/30/2017 | | 3/31/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | | | 3/31/2017 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/30/2017 | | DONE |
|
|
|
|
Intake Approval | | | 3/30/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/30/2017 | | DONE |
|
|
|
|
Application received | | 3/30/2017 | | | |
|
|
|
|