BLD-Final | 9/28/2017 | 10/3/2017 | 10/3/2017 | P | PASS |
Jim Storey
|
|
|
Final for C of O. Garage code is 0713. Key to home is on the window sill in the garage. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
DOC - Permit Finaled | 10/3/2017 | 10/3/2017 | 10/3/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Other | 9/28/2017 | 10/2/2017 | 10/2/2017 | P | CANC |
Dave Hannah
|
|
|
Historic Review for Certificate of Appropriateness needed. Please send out Historic Staff and issue the Certificate. thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
Zoning Approval | 10/2/2017 | 10/2/2017 | 10/2/2017 | | PASS |
Ted Vanegas
|
|
|
|
Meeting | | | 10/2/2017 | | DONE |
|
|
|
as per Dave Hannah need HD inspection-called Ted V and he is going out to do the inspetion today
|
BLD-Wall cover | 7/7/2017 | 7/10/2017 | 7/10/2017 | A | PASS |
Tony Young
|
|
|
Hi -- Need a Sheetrock Sheer inspection please. Phone #: ###-#### Inspection requested via web by Steve Hanson
|
BLD-Framing/Rough-in | 7/3/2017 | 7/3/2017 | 7/3/2017 | A | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 6/28/2017 | 6/29/2017 | 6/29/2017 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Hanson. Framing corrections not made. No cover.
|
BLD-Framing/Rough-in | 6/26/2017 | 6/27/2017 | 6/27/2017 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Hanson ok to insulate c/n on site
|
BLD-Wall Bracing | 6/12/2017 | 6/13/2017 | 6/13/2017 | A | PASS |
Tony Young
|
|
|
|
BLD-Wall Bracing | 6/9/2017 | 6/12/2017 | 6/12/2017 | A | PEND |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Hanson blocking installed
|
BLD-Wall Bracing | 6/7/2017 | 6/9/2017 | 6/9/2017 | A | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Hanson
|
Plan Modification Accepted | | | 6/9/2017 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 6/9/2017 | | 6/9/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Foundation | 4/30/2017 | 5/1/2017 | 5/1/2017 | A | DONE |
Tony Young
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo lira
|
BLD-Footing | 4/27/2017 | 4/28/2017 | 4/28/2017 | A | PASS |
Tony Young
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo lira,, house and garage ok
|
Inspection Record Card- Bld | | | 4/25/2017 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 4/25/2017 | | DONE |
Christina Prado
|
|
|
|
Routing Walk-In (BLD) | 4/4/2017 | 4/4/2017 | 4/18/2017 | P | DONE |
Brian McGowan
|
|
|
|
Plan assigned to (BJM) | 4/3/2017 | 4/3/2017 | 4/18/2017 | | DONE |
Brian McGowan
|
|
|
Due 4-12 - FAil - Site Plan needs to be updated, several beams and point loads need to be provided. Garage needs to be flipped.
|
Routing - PLAN CHECK | 4/18/2017 | | 4/18/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 4/18/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 4/18/2017 | | DONE |
Christina Prado
|
|
|
Parcel must be consolidated and updated prior to issuance.
|
Inspection Record Card- Bld | | | 4/18/2017 | | DONE |
|
|
|
|
Telephone call | | | 4/18/2017 | | DONE |
Christina Prado
|
|
|
Called Steve to advise permit cannot be issued until Parcel is consolidated. Fees are being updated to reflect proper credits for SFD demolition (BLD16-03632)
|
Plan resubmittals received | | | 4/13/2017 | | |
Christina Prado
|
|
|
Received two sets of revised plan sheets marked Cover, Foundation, Upper Floor, Main FLoor, Elevations & Electrical; Plans stamped and taken to BJM for review
|
1st review completed | | | 4/12/2017 | | FAIL |
Brian McGowan
|
|
|
Site Plan needs to be updated, several beams and point loads need to be provided. GArage needs to be flipped.
|
Routing - MECHANICAL | 4/12/2017 | | 4/12/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 4/10/2017 | | 4/12/2017 | | FAIL |
Brian McGowan
|
|
|
Site Plan needs to be updated, several beams and point loads need to be provided. GArage needs to be flipped.
|
Routing - MECHANICAL | | | 4/10/2017 | | FAIL |
Troy James
|
|
|
emailed corrections to mechanical contractor
|
Routing - PLANNING | 3/31/2017 | | 4/4/2017 | | PASS |
Ted Vanegas
|
|
|
|
Routing - Design Review | | | 4/4/2017 | | PASS |
Ted Vanegas
|
|
|
|
Plan assigned to (AJS) | 3/30/2017 | 3/30/2017 | 4/3/2017 | | DEFR |
Adele J Schaffeld-Griffin
|
|
|
|
Route to Impact Fee Review | 3/30/2017 | 4/2/2017 | 3/31/2017 | | PASS |
Tonya Wallace
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 3/30/2017 | | 3/31/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 3/31/2017 | | 3/31/2017 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/30/2017 | | DONE |
|
|
|
|
Intake Approval | | | 3/30/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/30/2017 | | DONE |
|
|
|
|
BLD-Energy code compliance | 6/29/2017 | 6/30/2017 | | P | |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Steve Hanson
|
Application received | | 3/30/2017 | | | |
|
|
|
|