BLD-Aging Inspection | 8/10/2018 | 8/10/2018 | 8/15/2018 | | PEND |
Tony Young
|
|
|
|
Issue PAID IN FULL permit | | | 9/25/2017 | | DONE |
|
|
|
|
Telephone call | | | 9/21/2017 | | DONE |
|
|
|
Spoke with Kiley informing her that this permit is going to expire in 5 days. She stated that she will contact the contractor
|
Expiration Notice | 9/5/2017 | 9/26/2017 | 9/5/2017 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 4/20/2017 | | |
|
|
|
|
Telephone call | | | 4/20/2017 | | DONE |
Christina Prado
|
|
|
Called Kiley with Stack ROck group to advise permit s ready pending GC form and gave fees due for pick up
|
Plan assigned to (LEG) Tisha | 4/18/2017 | | 4/20/2017 | | DONE |
Tisha Gallop
|
|
|
MSE retaining wall
|
Routing - PLAN CHECK | | | 4/20/2017 | | PASS |
Tisha Gallop
|
|
|
|
Routing - Erosion and Sediment | 4/19/2017 | | 4/20/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan with site map and narrative approved. Valid RP and PD designated. Site preparation after BMP installation is required, call ###-#### to schedule
|
Case Summary (BLD) | | | 4/20/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/20/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/20/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/20/2017 | | DONE |
Christina Prado
|
|
|
MET Need GC form from owner or licensed GC
|
Routing PW Grading-Hillside | 4/19/2017 | | 4/19/2017 | | PASS |
Jason C. Taylor
|
|
|
4' tall exposed height max. Jason Taylor
|
Plan resubmittals received | | | 4/18/2017 | | DONE |
|
|
|
received two copies of ESC plans full size, one copy of structural calcs with engineers Idaho seal
|
Plan resubmittals received | | | 4/17/2017 | | DONE |
Christina Prado
|
|
|
Received three sets of revised plans marked L1.00, one structural calc & 1 SWPPP; Plans taken to LEG for review
|
Routing Walk-In (Zoning) | 3/30/2017 | 3/30/2017 | 3/30/2017 | A | PASS |
Jeff Lowe
|
|
|
wall less than 6-feet tall
|
Routing Walk-In (BLD) | 3/30/2017 | 3/30/2017 | 3/30/2017 | A | FAIL |
Tisha Gallop
|
|
|
need full size engineered plan sealed (3 copies) and remove 'not for construction' from sheet. need esc plan and narrative (2 copies) or waiver request. (Tisha has the documents)
|
1st review completed | | | 3/30/2017 | | FAIL |
|
|
|
|
Application received | | 3/30/2017 | | | |
|
|
|
|