BLD-Aging Inspection | 3/12/2018 | 3/12/2018 | 3/14/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 3/13/2018 | 3/13/2018 | 3/14/2018 | | PEND |
Tony Young
|
|
|
|
Issue PAID IN FULL permit | | | 4/27/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 4/24/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 4/14/2017 | 4/14/2017 | 4/24/2017 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 4/24/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 4/24/2017 | | 4/24/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 4/24/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 4/24/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/24/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 4/24/2017 | | DONE |
|
|
|
Need GC and RP
|
Telephone call | | | 4/24/2017 | | DONE |
|
|
|
called Sydeee and told her permit is ready, fee due, need GC and RP
|
Routing PW Grading-Hillside | 4/17/2017 | | 4/18/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing - Erosion and Sediment | 4/14/2017 | | 4/17/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. Need to designate RP or do Homeowner RP.
|
Routing Walk-In (Zoning) | 4/14/2017 | 4/14/2017 | 4/14/2017 | A | PASS |
Jeff Lowe
|
|
|
|
MISC ACTIONS | | | 4/14/2017 | | DONE |
|
|
|
applicant in office, cancelled eplan workflow
|
Application received | | | 3/30/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 30 2017 4:45PM
|