BLD-Wall Bracing | 11/7/2017 | 11/7/2017 | 11/7/2017 | P | PASS |
Jim Sly
|
|
|
Gary-later if possible Phone #: ###-####
|
BLD-Foundation | 9/8/2017 | 9/11/2017 | 9/11/2017 | A | PASS |
Jim Sly
|
|
|
(mid day) Gary Phone #: ###-####
|
BLD-Footing | 9/7/2017 | 9/7/2017 | 9/7/2017 | P | PASS |
Jim Sly
|
|
|
Gary Phone #: ###-####
|
OVERRIDE | | | 9/5/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 9/5/2017 | 9/5/2017 | 9/5/2017 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 8/8/2017 | 8/8/2017 | 9/5/2017 | | PASS |
Josh Bogle
|
|
|
1st done - waiting on engineer's redlines (see e-mail 8-23)
|
Issue PAID IN FULL permit | | | 9/5/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/5/2017 | | 9/5/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/5/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/5/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/5/2017 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Permit Ready to Issue | | | 9/5/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/8/2017 | | 8/9/2017 | | FAIL |
Josh Bogle
|
|
|
plans taken in and routed to Josh Bogle - engineer's redlines to match calcs to plans JAB
|
Routing Walk-In (BLD) | 8/3/2017 | 8/3/2017 | 8/3/2017 | P | FAIL |
Josh Bogle
|
|
|
need engineering for lateral at the Manufactured home side
|
Routing Walk-In (Zoning) | 3/31/2017 | 3/31/2017 | 3/31/2017 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 3/31/2017 | 3/31/2017 | 3/31/2017 | A | FAIL |
Brian McGowan
|
|
|
Wanted to attach a Garage to a Manufactured Home. No floor plan, foundation plan, elevations, wall bracing was provided.
|
1st review completed | | | 3/31/2017 | | FAIL |
|
|
|
Wanted to attach a Garage to a Manufactured Home. No floor plan, foundation plan, elevations, wall bracing was provided.
|
Application received | | 3/31/2017 | | | |
|
|
|
|