Permit Information
Permit NumberBLD17-00880
StatusFinaled
Name HARDING HOMES INC
Site Address 1817 S TAGGART ST
Project Name1817 Taggart
Customer Number 
ePlanReviewYes
Description
DRH16-00436; Permit for the construction of a new 1576 sq. ft., two story (first story 833 sq. ft., second story 743 sq. ft.) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 102 sq. ft. of covered patio/porch and a 456 sq. ft. attached garage per the approved plans, and any notations. R-1C zoning and setbacks per planning. //leg
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/26/201712/27/201712/27/2017APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Ryan Lierman
DOC - Permit Finaled12/27/201712/27/201712/27/2017PPASS
DetailsJim Storey
Letter of compliance/Occupancy  12/27/2017 DONE
Zoning Approval12/26/201712/26/201712/26/2017 DONE
DetailsAndrea Tuning
BLD-Final12/22/201712/22/201712/22/2017PNR
DetailsJim Storey
Call Ron at ###-#### with any questions. Thanks! Phone #: ###-#### Inspection requested via web by Ryan Lierman pending zoning before bld
BLD-Conference12/8/201712/8/201712/8/2017PDEFR
DetailsJim Storey
please call Andrea Tuning ###-####-she will explain what's going on with the but she won't be in the office again until 3:00 pending action
BLD-Final12/7/201712/8/201712/8/2017PCANC
DetailsJim Storey
cancelled because P & Z has not done their inspection-looks like there are questons about the setback-Phone #: ###-#### >> Inspection requested via web by Ryan Lierman
BLD-Final12/7/201712/7/201712/7/2017ANR
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Ryan Lierman needs plumbing final no inspection done
BLD-Energy code compliance10/9/201710/9/201710/9/2017PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Ryan Lierman
BLD-Framing/Rough-in10/6/201710/6/201710/6/2017APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Ryan Lierman
BLD-Framing/Rough-in10/2/201710/2/201710/2/2017ANR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Ryan Lierman need ele insp.
BLD-Wall Bracing9/6/20179/7/20179/7/2017APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Ryan Lierman
BLD-Foundation6/22/20176/22/20176/23/2017PPART
DetailsJim Storey
Joe Phone #: ###-####
BLD-Footing6/20/20176/20/20176/20/2017PPASS
DetailsBrandon Shaw
James Phone #: ###-####-please verify setbacks-neightbor says to close to her property lines-please call Christina Hoots ###-####
Issue PAID IN FULL permit  6/5/2017 DONE
OVERRIDE  5/31/2017  
Plan assigned to (LEG) Tisha5/19/2017 5/31/2017 DONE
DetailsTisha Gallop
2nd review (f/p floor/foundation, site plan & elevations not match floor plan)
Routing - Design Review5/31/2017 5/31/2017 PASS
DetailsAndrea Tuning
Plan resubmittals received  5/31/2017 DONE
Routing - PLAN CHECK5/31/2017 5/31/2017 PASS
DetailsTisha Gallop
PLANS/APPL TAKEN TO FRONT DESK  5/31/2017 DONE
Permit Ready to Issue  5/31/2017 DONE
All met
Routing - Design Review5/22/2017 5/23/2017 FAIL
DetailsAndrea Tuning
Routing - PLAN CHECK5/22/2017 5/22/2017 FAIL
DetailsTisha Gallop
per Troy James new manual J not requried
Plan assigned to (DAF)4/14/20174/14/20175/19/2017 DEFR
DetailsDavid Ferguson
(1st done) due 4/14 . Andrea T. told me that it was assigned to me. Need revised site plan to show house orientation related to floorplan, need wall bracing revised or engineering, Andrea failed due to upstairs design not complying which will change the structural review.
deferred to Tisha 5/19/17
Plan resubmittals received  5/19/2017 DONE
1st review completed  4/18/2017 DONE
DetailsDavid Ferguson
Routing - PLAN CHECK4/3/2017 4/18/2017 FAIL
DetailsDavid Ferguson
Routing - MECHANICAL4/3/2017 4/5/2017 PASS
DetailsTroy James
Route to Impact Fee Review4/3/20174/6/20174/4/2017 PASS
DetailsTonya Wallace
Initial residential review of new SFD permits requested for now.
Plan assigned to (AJS)4/3/20174/3/20174/3/2017 DEFR
DetailsAdele J Schaffeld-Griffin
Plans ACCEPTED BY PLAN TECH  4/3/2017 DONE
DetailsChristina Prado
Intake Approval  4/3/2017 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  4/3/2017 DONE
DetailsChristina Prado
Routing - PLANNING4/3/2017 4/3/2017 FAIL
DetailsAndrea Tuning
The master bedroom on the rear on the second story of the rear of the home should be located within a 13-foot wide dormer as opposed to a full second stroy floor plate.
Routing - Addressing4/3/2017 4/3/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS4/3/2017 4/3/2017 PASS
DetailsRachael Beierle
Application received  3/31/2017 DONE
Application submitted via PDS Online on Mar 31 2017 1:19PM