BLD-Final | 5/5/2017 | 5/8/2017 | 5/8/2017 | A | PASS |
Jim Storey
|
|
|
James Phone #: ###-####
|
DOC - Permit Finaled | 5/8/2017 | 5/8/2017 | 5/8/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Footing | 4/5/2017 | 4/6/2017 | 4/6/2017 | P | PASS |
Jim Storey
|
|
|
would like early pm; Jimmy Phone #: ###-####
|
Routing Walk-In (BLD) | 4/4/2017 | 4/4/2017 | 4/5/2017 | A | DONE |
Brian McGowan
|
|
|
|
Plan assigned to (BJM) | 4/4/2017 | 4/4/2017 | 4/5/2017 | | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 4/5/2017 | | FAIL |
Brian McGowan
|
|
|
info needed on roof mount, possibly an additional beam, a legible sheet 13
|
Routing - PLAN CHECK | 4/5/2017 | | 4/5/2017 | | FAIL |
Brian McGowan
|
|
|
info needed on roof mount, possibly an additional beam, a legible sheet 13
|
Routing - PLAN CHECK | 4/5/2017 | | 4/5/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 4/5/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 4/5/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/5/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 4/5/2017 | | DONE |
|
|
|
met
|
Telephone call | | | 4/5/2017 | | DONE |
|
|
|
callled Rich's cell to let know permit is ready and how much is owed-left message on his phone
|
Issue PAID IN FULL permit | | | 4/5/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/5/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 4/4/2017 | 4/4/2017 | 4/4/2017 | A | DONE |
Sue Cummings
|
|
|
|
Application received | | 4/4/2017 | | | |
|
|
|
|