BLD-Final | 4/20/2017 | 4/21/2017 | 4/21/2017 | A | PASS |
Brandon Shaw
|
|
|
Nick Phone #: ###-####
|
BLD-Final | 4/21/2017 | 4/21/2017 | 4/21/2017 | P | CANC |
Brandon Shaw
|
|
|
This final can be done at anytime. Whenever you are in the area. It is always accessible. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
BLD-Footing | 4/17/2017 | 4/18/2017 | 4/18/2017 | A | PASS |
Brandon Shaw
|
|
|
This footing inspection can be done in the AM tomorrow. Aaron will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
Issue PAID IN FULL permit | | | 4/14/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/13/2017 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Telephone call | | | 4/13/2017 | | DONE |
Christina Prado
|
|
|
Called Rich to advise permit is ready and gave fees due
|
Routing Walk-In (BLD) | 4/4/2017 | 4/4/2017 | 4/12/2017 | A | DONE |
Brian McGowan
|
|
|
|
Plan assigned to (BJM) | 4/4/2017 | 4/4/2017 | 4/12/2017 | | DONE |
Brian McGowan
|
|
|
provided information for an attached structure instead of a free standing structure
|
1st review completed | | | 4/12/2017 | | FAIL |
Brian McGowan
|
|
|
provided information for an attached structure instead of a free standing structure
|
Routing - PLAN CHECK | 4/12/2017 | | 4/12/2017 | | FAIL |
Brian McGowan
|
|
|
provided information for an attached structure instead of a free standing structure
|
Routing - PLAN CHECK | 4/12/2017 | | 4/12/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 4/12/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 4/12/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/12/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing Walk-In (Zoning) | 4/4/2017 | 4/4/2017 | 4/4/2017 | A | DONE |
Sue Cummings
|
|
|
|
Application received | | 4/4/2017 | | | |
|
|
|
|