BLD-Final | 5/19/2017 | 5/22/2017 | 5/22/2017 | A | PASS |
Tony Young
|
|
|
Inspection can be done at anytime that you guys are in the area. Backyard is open and no man eating dogs or children. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
DOC - Permit Finaled | 5/22/2017 | 5/22/2017 | 5/22/2017 | P | PASS |
Tony Young
|
|
|
|
PubWorks Subgrade Approval | 4/26/2017 | 4/26/2017 | 4/26/2017 | | DONE |
Jason C. Taylor
|
|
|
**CHECK ENGINEERING TO ENSURE THAT FOOTINGS DO NOT HAVE MORE THAN 2000 PSI LOADING AS GEOTECH SUBGRADE ONLY APPROVED THIS LOADING AS A MAXIMUM****A letter from the applicant’s geotechnical engineer indicating that the column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####
|
BLD-Footing | 4/21/2017 | 4/21/2017 | 4/21/2017 | P | PEND |
Tony Young
|
|
|
Jimmy will be installing this and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
BLD-Footing | 4/20/2017 | 4/21/2017 | 4/21/2017 | A | PEND |
Tony Young
|
|
|
Jimmy will be installing this and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch ok pending soils report from public works
|
BLD-Footing | 4/19/2017 | 4/20/2017 | 4/20/2017 | P | PEND |
Tony Young
|
|
|
Jimmy will be installing this and his cell number is ###-####. MTI will be doing the subgrade inspection at 3 PM. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch,, needs hillside approval 1st
|
BLD-Footing | 4/20/2017 | 4/20/2017 | 4/20/2017 | P | PEND |
Tony Young
|
|
|
Jimmy will be installing this and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
Issue PAID IN FULL permit | | | 4/19/2017 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 4/4/2017 | 4/4/2017 | 4/18/2017 | | DONE |
Brian McGowan
|
|
|
NO ESC NO ENERGY
|
1st review completed | | | 4/18/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 4/18/2017 | | 4/18/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 4/18/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 4/18/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 4/18/2017 | | DONE |
|
|
|
All Met
|
Telephone call | | | 4/18/2017 | | DONE |
|
|
|
Left a message for Rich informing him that this permit is ready and the fee amount due
|
Routing PW Grading-Hillside | | | 4/14/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing - Erosion and Sediment | | | 4/13/2017 | | PASS |
Andy J. Long
|
|
|
Minimal earthwork, no grading or excavation to occur. Work within vegetated yard in occupied home. No construction access via Bogus Basin Road. No ESC permit required.
|
Routing Walk-In (Zoning) | 4/4/2017 | 4/4/2017 | 4/4/2017 | A | PASS |
Sue Cummings
|
|
|
|
Application received | | 4/4/2017 | | | |
|
|
|
|